08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66

of 85

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

NE@LOKw we Checklist - Applications Involving Land
eo Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

1.. APPLICATIONFORMS ~ ~~ ° , me Sg
1.1 Form 1 PartA
1.1.1 Ensure that the form is fully completed. A
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 Ifthere are multiple owners, the consent of each owner is required.
1.1.2.2 Ifthe owner of the land is a company, either ACN No. or Company Seal required.
4.2. Form1 Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [7]
2.\ REFERRALINFORMATION ™ 9.0 0 7 ee De ING
2.4. Ensure that items 1-23 have been checked and/or completed with regard to referrals.
3. ENVIRONMENTALLY RELEVANT ACTIVITIES |.” es ° Shy
3.1. Ensure that Part G is completed if EPA referral is required.
uM
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
‘4, “FORM 2- REQUEST TO CHANGE APPROVAL a , oye
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS : a < ’ ‘ UF a
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational is]
Works) accompanies the application. in addition ensure that each set is complete. 4
6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. "SUPPORTING.INFORMATION |” "— a va TA ee
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration LS
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. 1)
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7? FEE OES “ae lowe EE
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, 1)
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form. 1

 

 

 

 

 

Receiving Officer £3... I Need

Having completed this form and accepted the appfcation, please deliver both to the following IDAS Application Receiving
trays:-

 

If the application is for a Material Change of Use exclusively ~AOP1’s desk in the Land Use Section.

If the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

In all other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

SEP! g:\antYorms\application checklist.doc

 
Full text of the other 84 pages

Page 2

579411129 Buipung BSOON Aa

    
 

INTEGRATED PLANNING ACT 1997

  

 

Sheers Se
AYeye

Part A

Common details

 

 

 

 

 

 

 

 

 

Identification of the premises the subject of the application

1. Can any part of the premises be identified by a street address or lot on pian description?
[1 No - Answer Q1(a)

1{a) Does the application only involve a mobile and temporary environmentally relevant activity (ERA)?

CO) No-Gotoa2
C1 Yes- Complete Table A staling each local govemment area in which the mobile and temporary ERA is proposed to aperate. Then go
to Q9
Table A

 

Name of each focal government

 

 

(1.

O Yes ~ Complete Table 8 and answer Q1(b) and Q1{c)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table B
Lot on plan description
mater re Street name ‘onatty one port = eer — ine separie om) Local government area
number | fag. mS Plan number
lt. 23 | Eerie NGGSAV LUE LN 2 1CTP 451 BISSF4 N@OSA, COOL
TOSS RISS4
1(b) Can the address be further described by shop/tenancy number or storey/level?
WY No
CD Yes- Complete Table C
Table
Shop/tenancy number Storey/level
ft.
1(c)_ Is any part of the premises strategic port land under the Transport Infrastructure Act 1994?
No
C2. Yes - Complete Tabie 0
Table D
Lot on plan description Port authority for the lot
fr

 

 

 

 

Page 3

INTEGRATED PLANNING ACT 1997 Pant A, Version 3.0, 3 Septem ber 2007

2. Can the premises best be identified by coordinates (e.g. for development proposed in water s or on a site within a large rural tot}?

 

 

 

No
LO Yes — Complete Table E
Table E
Coordinates
(place each set of coordinates in a separate row} Zone Reference Local government area
Easting Northing Latitude] Longitude and Datum
1. Zone Reference:

to

1D GDAS4 (preferred)
0 weses
© Other - Specify

Ld

3. Are the premises within or adjacent to a water body or watercourse?
No
[1 Yes - Complete Table F and answer Q3(a)

Table F

(1.

3(a) Is any part of the development proposed in tidal waters (ie. below high water mark)?

 

 

 

 

 

 

 

 

 

Name of water body or watercourse

 

 

 

 

No
Yes

If yes, is the land in either or both of the following -

 

 

 

 

 

 

 

 

 

* — Atidal area for a local government CINo (71 Yes- Complete Table G, Column 1
*  Atidal area for strategic port land (No [1 Yes~ Complete Table G. Column 2
Table G
COLUMN 41 COLUMN 2
Name of local government (if applicable) Name of port authority (if applicable)
it.
4. Whats the total area of land that makes up the premises (i.e. the area covered by the application) ?
Avea of land above bigh water mark/outside watercourse Area in a water body or watercourse
GNS Efe (7) hectares (Tick applicable unit) la m?_ [_] hectares (Tick applicable unit}

 

 

Existing use of the premises

No

Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application. e.g.
focation and nature of existing uses, buildings, structures and services

5. cy premises currently used for any purpose?

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 Septem ber 2007

6. Are there any existing easements on the premises (e.9. for vehicular access, electricity, overland flow)?
No
Oo Yes ~ Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application

Table H

[k

Proposal details

 

Purpose of each easement Entity favoured by the easement

 

 

 

 

7, Are new uses proposed on the premises?

No
LI Yes - Complete Table!

Tabte |

ft.

8. Are new buildings or structures proposed to be erected on the premises?

Oxo
Yes - Ensure the nature, focatian and dimensions of the proposed new buildings, structures or services are included in plans, submitted with
the application

 

Each proposed new use

 

 

 

Applicant details

9. Whois the applicant for the application?

Company or organisation name Cc oO .

(if applicable) kK, Won De resTICny S :
Individual! contact person details JCA LYSELITVEL

Title maiZ_b | First name Oe | Last name |

Postal address ' /. 23 tebtsAleip Ai wWweGrawn tle. 4ixGc.
Contact telephone number ecfoaQ a7 7 teh " SAAGZ 42a

Mobile phone number

 

 

 

 

 

 

 

 

 

Facsimile number Seay ef . a ‘
e-nail address ifafenghsece,” kyco "A oh@larie, oud . nek AY
= ‘

Owner's consent and resource entitlement

 

 

 

 

10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998 (IP Reg)

or any other regulation?
EY no

OO Yes- Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement

 

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 Septem ber 2007

 

 

 

Table J
Nature of State-owned resource
Nature of evidence required
Allocation/entitlement wee a oi State Govemment Date of | Date of
reference number Name of authorising officer | Position of authorising officer Department issue | expiry

 

 

 

 

 

 

 

 

 

 

| GENERATE ANOTHER TABLE _|

11. os the application involve land other than State-owned land (ie. privately owned fand) and require owner's consent?

 

 

 

 

 

 

4
tp Yes ~ Complete Table K and submit, with the application, written documeniaticn of all owner's consent
Table K
| Owner name/s Street address or lot on plan description [Date written consent was obtained
bE Key mackanwlere 1/23 EDWARD SF Ahoy
: NOOSE) ALAS

Mandatory attachments and supporting information

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

 

Description of attachment or information Title (if appficabie} "
*(@.9. Part C of Form 1, owner's consent, evidence of (e.g. General Authority, James Street Date ee weeny °
Fesource aliocation/entitiement, plans, drawings, reports) Trafic Report) ag

 

 

 

 

 

 

a

Portable Long Service Leave (PLSL) levy for building and construction work

 

13. ts payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit
for the application can be given?

O No

13{a) Indicate the reason PLSL is not applicable.

{J The application is not for building and construction work under the Building and Construction Industry (Portable
Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of
work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting,
clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or

All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

O
CJ The work is being carried out under an owner-builder permit issued under the Queensland Building Services
Authority Act 1991 - Complete and submit a Leave Notification and Payment Form (no payment required if owner-builder permit
ow number stated). The receipted form must be sighted by the assessment manager before a development permit can be given.
Yes

13(b) es PLSL levy been paid?
No ~ Complete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the
assessment manager before a development permit can be given.

Ol Yes- Complete Table L and submit, with the application, the “yellow” (Local Government's {Council} / Private Cerlifier's)
copy of the receipted QLeave Form.

Page 6

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 Septem ber 2007

 

 

 

 

 

 

 

 

 

 

 

Table L
. . a QLeave Project Number
Amount paid Date paid (6 digits, starting with A, B, E, Lor P)
[ 1.
OFFICE USE ONLY
[Date received | ulrls ]  [Reterence numbers | OS [otot ]
¥ t

 

FOR COMPLETION BY ASSESSMENT MANAGER

\s a Q)éave Notification and Payment Form required for this application?

Table M

 

 

No
Yes ~ Complete Table M
Column 4 Cotumn2 | Column 3 Column 4 Column § Column 6
i . Date receipted form
Description af the work Amount pald | Date paid QLeave Project Number sighted by assessment | Name of oficer who
(5) manager sighted the form

 

f 4.

 

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

 

 

To: L Council.
| have been engaged as the private certifier for the building work referred to in this application.
Date of i .
engagement Accreditation number Name BSA Certification number Building classification

 

 

 

 

 

 

 

 

 

Advice for completing Part A

 

General advice

Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that Is not properly made.

Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of
applications, are stated in other Parts of Form 1.”

The IAS Assessment Checktist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only.

For further information about completing this form go to IDAS Guide 1 (Making and IDAS application

 

Qi

The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the focal government.

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the and). The term ‘land’ is also defined to include the estate in, on, over or under the land.

A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA) only.
Instead complete Q1(a).

Strategic Port Land is within a local goverment area but a local government's planning scheme does not apply on Strategic Port Land.
Strategic Port Land is declared under the Transport Infrastructure Act 1994. For further information go to [DAS Guide 11 (Development
on strategic port land) and the Queensland Transport (Ports) website.

 

Q2

 

 

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. .
Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 Septem ber 2007

 

[eK] +» Asingle development application may involve land both within and outside waters.

« A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily floes and reflows (unless a regulation has declared a limit for the watercourse). Generally, a watercourse
is in the jurisdiction of the Department of Natural Resources and Water.

+ ‘Tidal water is defined in the Coastal! Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high
water mark at spring tides) establishes the boundary of a tidal area.

+ Land below high water mark is not within a local govermment's area unless provided for under the Local Government Act 1993. Unless
otherwise provided for by legislation, a focal government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a locat
government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal
works within the tidal area for a focal govemment, and the planning scheme may be applied to that assessment {to the extent provided
for in the code for prescribed tidal work).

ag «The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form {including this Part and any other retevant Parl) is correct.

+ Ifthe applicant is a company or organisation, a contact person must be nominated.

+ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

Q10 » Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requiation

+ Section 3.2.1(10){a}{ii} states an apptication cannot be taken to be properly made without the required evidence.

+ Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark...

+ In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.

+ Inthe case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

Qu + Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owners, if the
application involves any of the following:
{i} a material change of use;
{i} reconfiguration of a lot;
{i} work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or
{iv)_ work on rail corridor land defined under the Transport Infrastructure Act 1994.

+ ‘Owner’ for the purpose of a fodging an IDAS development application means the person at the time of lodging the application, entitled to
feceive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

+ Owner's consent is not required for a mobile and temporary ERA.

Qi2 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

O13 + The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the
building and construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service leave. To
fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of the work,
whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for calculating
the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. included in the amount
collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction industry Training Levy.

* The Buikling and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction industry
for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing
buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

+ The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a development
permit for certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the
status of the payment of the levy.

+ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request
from QLeave, or can be completed on the QLeave website at www. gleave.qid.gov.au

+ For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.qid.gov.au )

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of Local Government, Pianning, Sport and Recreation in accordance
with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS
process, except where required by legislation (including the Freedom of information Act 1992) or as required by Parliament. This
information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will
be retained as required by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for
the Department of Local Govemment, Planning, Sport and Recreation at (07) 3237 1860.

-6-

 

 

 

Page 8

Part £, Version 3.0, 3 Septem ber 2007

  

 

 

 

 

 

 

Building &/or operational work assessable against a planning scheme

Nature of the works

1. Is the application seeking approval of building work assessable against a planning scheme?
OO No

O Yes
1(a)

If yes, is the application seeking approval for more than one type of building work?
No ~ Complete Table A

QO Yes — Complete a new Table A for each type of building work
Table A

 

(i) What aspect of the building work is made assessable by the planning scheme (e.g. building height greater than 8.5m, building work on high
landsiip risk area)?

[

(ii) Anite works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

 

 

 

 

 

 

 

 

 

 

 

 

 

No
[Yes - Complete Table A(a)
Table A{a)
List of approval reference/s - Date approved Date approval lapses
[ 1.
[- GENERATE ANOTHER TABLE A
2. Is the application seeking approval of operational work assessable against a planning scheme?
O. No
[CY Yes
ala)

If yes, is the application seeking approval for more than one type of operational work?
No - Complete Table 8

vs Yes — Complete a new Table B for each type of operational work

Page 9

”

 

INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 Septem ber 2007
Table B
(i) What is the nature of the operational work?
£1 Roadworks Stormwater Water infrastructure x Sewerage infrastructure
Landscaping

(1 Clearing vegetation under the planning scheme
LY Drainage works O Signage

(ii) Is the application for operational work involving the creation of new lots?
No

OC Yes - Specify number below

CT

(iii) What type of approval is being sought?
Development Permit

Earthworks
(2 Other - specify below

(1 Preliminary Approval

(iv) Is there a current Preliminary Approval for this operational work on the premises?
No

(Yes - Complete Table Bia)
Table Bia)

 

List of approval references

Date approved | Date approval lapses
[ 1.

 

 

 

 

 

 

(v) sete works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
No

(aves — Complete Table B{b)
Table Bib)

cn

,

 

List of approval references

 

 

Date approved | Date approval lapses

 

 

 

 

 

 

 

 

[ GENERATE ANOTHER TABLE B
) Mandatory information

3. Confirm the following mandatory information accompanies this application

 

Confirmation of Method of lodgement
lodgement

 

 

Plans, and specifications if applicable, showing the nature and location of the proposed works
(including the extent of any cut and fil)

(0 Confirmed

 

 

 

 

OFFICE USE ONLY

[Date received | |

[Reference numbers

Advice for completing Part E
General advice

+ — Part A must also be completed for all IDAS development applications.

All. questions must be answered unless, following a response, there is a statement to go directly to a particular question
Q182

 

 

 

 

A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

 

-2-

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

 

 

 

  

Assessment Checklist

IDAS Development Application Form 1 is the approved form for all development applications under the integrated
Planning Act 1997. Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all
applications. The relevance of other Parts of Form 1 depends on the nature of the application.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist In determining State assessment and
referral requirements, and the Parts of Form 1 relevant to the application.

Section 4 and all other relevant sections of the IDAS Assessment Checklist must be completed for all development
applications except those for building work requiring assessment against the Building Act 1975 only. For more advice
refer to Part B of the IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
If unsure, phone or visit your local government or log on to the IPA website for help.

 

Does the application seek approval to materially change use of the premises? O Yes {0 No
If yes — complete Section 2 of this checklist

 

Does the application seek approval to reconfigure a lot? (1D Yes |LJ No
Ityes - complete Section 3 of this checklist and Part F of IDAS Application Form 1
Assessment is by the local government

 

Does the application seek approval to carry out operational work? W Yes ( No
If yes - complete Section 4 of this checklist

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries|(_) Yes 1 No
Act 1994?

If yes - complete Section 5 of this checklist

 

Does the application seek approval to carry out building work requiring assessment against a local O Yes {fF No
government planning scheme?

if yes - complete Part E of IDAS Application Form 1.
Assessment is by the focal government

 

Does the application seek approval to carry out building work requiring assessment against the Building |Z] Yes |) No
Act 1975?

if yes - go fo Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application
Form 1,

Assessment is by a building certifier

 

 

 

 

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

S ECT | O N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

 

HERITAGE

 

14

ls any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
No
DO Yes
If yes, has an exemption certificate for the proposal! been issued under the Queensland Heritage Act 1992?
OO Yes
(J No
If no, is the proposed work emergency work for the Queensland Heritage Act 1992?
OO Yes :
CJ No
If no, is the work being carried out by the State?
OO Yes

(1 No (Complete Part C) This application requires assessment by the Queensland Heritage Council (QHC). if QHC is
not the Assessment Manager for the application, the Council has jurisdiction as Concurrence Agency.

 

o ea

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA

 

1.2

 

Dope he proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No
CO Yes

If yes, is an allocation notice required under the Water Act 2000?

C1 No
O Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
(11 No - (Complete Part K7) This application requires assessment by the Department of Natural Resources and Water (NRW).
If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes — Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Part Kz). if NRW is not the Assessment Manager for the application,

the agency has jurisdiction as Concurrence Agency. Subject to the declaration for the relevant wild river area,
assessment is also required for the purposes of the Wild Rivers Act 2005.

 

 

 

+ tn this IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.

-2-

 

Page 12

INTEGRATED PLANNING ACT 1997 {OAS Assessment Checklist, Version 21.0, 3 September 2007

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

1.3

 

Dogs’ the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No
Cl Yes
If yes’ is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
te te
If no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every
wie of each proposed ERA?

No - (Complete Part G) This application requires assessment by the Administering Authority. If the Administering Authonty is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

O Yes
OC Yes

If yes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?

D Yes
If yes, will the application be accompanied by an altocation notice for that ERA, as defined under the
Environmental Protection Act 1994, section 73AA(9)? .
(0 Yés - Unless the application is consistent with any property development plan applying to the land. and the application
is accompanied by an allocation notice, the Assessment Manager must refuse to receive it (Complete Part G).
This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
No - An application for the ERA would be taken to be not properly made and the Assessment Manager must reluse to
receive it.

 

No

 

 

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If no, is any part of any ERA intended to be located in a high preservation area?

 

OO Yes

If yes, is each proposed ERA one of the following?

¢ ERA, item 15 (sewage treatment) wee Ores
¢ ERA, item 16 (municipal water treatment plant) No 0 Yes

¢ ERA, item 19 (dredging material) No (7 Yes

© — ERA, item 14 (crematorium) No (Yes

¢ ERA, item 28 (motor vehicle repair shop) No (C1) Yes

¢ level 2 ERA other than - No  {] Yes

» — item 1{a) {aquaculture}
« — item 2(a) (cattle feedtotting)
« item 3(a) (pig farming)
« — item 4{a) (poultry farming)
« — item 20 (extracting rock or other material)
« — item 22 ( screening etc. materials)
« — item 59 (asphalt manufacturing) .
© — ERA, item 20 (extracting rock or other material) located outside No CI Yes
waters and the activity is a borrow pit of not more than 10,000m* for -
« specified works under the Wild Rivers Act 2005; or
« — residential complexes, as defined under the Environmental
Protection Act 1994
e — ERA, item 22 ( screening etc. materials) and carried out outside waters Wo _ OYes
and the activity is for -
» — specified works under the Wild Rivers Act 2005; or
+ — for residential complexes, as defined under the Environmental
* Protection Act 1994
© — ERA, item 14 (crude oil or petroleum product storage) and the activity uno 01 Yes
is -
+ — alevel 2ERA; and

_¢  forresidential complexes, as defined under the Environmental
Protection Act 1994; and

« carried out outside a designated urban area, as defined under the
Wild Rivers Act 2005 wi
No

« — Anexempt environmentally relevant activity, as defined under
Environmental Protection Act 1994, in a designated urban area, as
defined under the Wild Rivers Act 2005

DL Yes

if yes to any one ~ Unless the application is consistent with any property development plan applying to the land, and the
application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it
(Complete Part G) This application requires assessment by the Administering Authority for the
purposes of the Environmental Protection Act 1994. If the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to any limitations in the declaration for the relevant wild river area and the Wild Rivers
code, assessment is also required for the purposes of the Wild Rivers Act 2005. in particular,
ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment
for the purposes of the Wild River Act if proposed to be tocated in a designated urban area.

if no to all - An application for the ERA/s would be taken to be not properly made and the Assessment Manager must
refuse te receive it.

 

 

 

 

Page 14

INTEGRATED PLANNING ACT 1997,

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

No

Ino, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside
waters?

oO No - Unless the application is consistent with any property development plan apptving to the land. and the
application is accompanied by an allocation notice, the Assessment Manager mus! refuse to receive it
(Complete Part G) This application requires assessment by the Administering Authority for the
purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act 2005. If the

Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction
as Concurrence Agency.

O Yes
If yes, does the ERA meet the following?
« the activity is located inside a flood management area and a (No OO Yes
borrow pit of not more than 10,000m} for -
» — specified works under the Wild Rivers Act 2005; or

« — residential complexes, as defined under the
Environmental Protection Act 1994

 

* the activity is located outside a flood management area {JNo [J Yes

if yes {0 either - Uniess the application is consistent with any property davelopment pian applying to the
land, and the application is accompanied by an allocation notice, the Assessment Manager
must refuse fo receive it, (Complete Part G) This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994
and, subject fo the relevant declaration for the wild river area, the Wild Rivers Act 2005. if
the Administering Authority is not the Assessment Manager for the application, the agency
has jurisdiction as Concurrence Agency.

if no to both - An application for the ERA would be taken to be not properly made and the Assessment
manager must refuse to receive it.

      

4

    

A 1A

 

 

WITHIN T

HE-LIMITS OF A PORT

 

14

 

eo part of the premises within the limits of a port under the Transport infrastructure Act 1994?

No

OO Yes

If yes, is that part of the premises below high water mark?

OO No .

(1 sYes - if answers to questions in ather sections of this checklist indicate that the proposed development is assessable under IPA,
schedute 8 - Answer (a) to (c) below. This application requires assessment by the Port Authority for the land. ff you
answer no to (a), (b) and (c) below, the Port Authority for the Port has jurisdiction as Advice Agency.

(a) Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
LO No
(1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.

(b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or
spoil grounds?
1 No :
CI) Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.

(C)_ Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
0) No

(1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.

Boe aed i

  

 

 

 

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

DECLARED FISH HABITAT AREA

 

15

Dovy a part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No

(C1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, -
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI8F). If OPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

BEBE ML 2g 8:

 

COMMUNITY INFRASTRUCTURE

 

 

 

 

 

1.6 een of the premises designated for community infrastructure?
No
© Yes
if yes, is the community infrastructure intended to be provided by a public sector entity?
O No
OO Yes’
If yes, is the land owned by or on behalf of the State?
OO Yes
1 No
Ino, is the development for the following?
¢ For the designated purpose (No [7 Yes
« Carried out by, or on behalf of, the designator / Dino Ol Yes
If no to either or both, is the proposed development assessable under the planning scheme?
OO No
Cl Yes - This application must be referred to the Queensland Goverment department administering the Act
authorising the development for the designation as Concurrence Agency.
achotiane © labe 5 dea?
WASTE WATER MANAGEMENT
17 Dope he proposal involve the establishment or expansion of a waste water disposal system?
No
Cl Yes .
If yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the
Water Act 2000?
O No
DD Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?
(J) Yes
C) No
If no, is the proposed development involving the waste water disposal system assessable under the planning
scheme?
Ol No
oO Yes - This application requires assessment by the Department of Natural Resources and Water (NRW) as
Concurrence Agency.

 

 

P Reade setintits é

 

 

Page 16

(NTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

SECTION 2 Section 2 must be completed when the application seeks approval to materially change the use of premises.

 

PLANNING SCHEME

 

2.1

‘s the proposed use assessable under the planning scheme?

No - (Go to Question 2.2}
O Yes - {Complete Part D of IDAS Application Form 1 and answer Questions 2.1.1 - 2.1.13 below)

if yes, does the application request that the proposal be assessed against a superseded planning scheme?
OC Yes - (Compiete Attachment 1)

 

 

{] No
STATE-CONTROLLED ROAD
2.41

Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
0 Yes ,
If yes, is the use proposed in a future State-controlled road defined by route?

CI Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
7/1 _No- This application must be referred to OMR as Advice Agency.

No

If no, is the proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and does it exceed the specifi ied
threshold?

© ss Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

[LJ No

 

 

 

 

ACID SULFATE SOILS
2.1.2 | Is the use proposed in a local government area listed? in State Planning Policy 2/02: Planning and Managing Development
in Acid Sulfate Soils?
No
O Yes
If yes, is the natural ground level of any part of the premises less than 20m AHD?
No
(Yes
If yes, will the proposed use involve the following?
¢ — Excavating more than 1,000m: of soil or sediment at or below Sm AHD Ono (CO) Yes

« — Filling the premises with 1,000m? or more of material with an average depth of0.5m ([]No [1 Yes
on land, soil or sediment at or below Sm AHD

if yes to either or both - this application must be referred to the Department of Natural Resources and Water (NRW) as Advice
Agency.

 

 

  

 

2 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,

Fitzroy,

Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Maminglon, Noosa, Pine Rivers,

Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

-7-

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

COASTAL MANAGEMENT DISTRICT

 

2.1.3

 

 

Does the proposed use involve the following?
« — Carrying out operational work, completely or partly in a coastal management district A

we oie
* — Carrying out building work, completely or partly in a coastal management district, that is the No [1 Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m?

* — Carrying out building work, completely or partly in a coastal management district, that is the Ano 0 Yes
enlargement of the GFA of existing premises by more than 1,000m?

If yes to any one - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

bt g, Schott, feark

 

 

VEGETATION CLEARING

 

2.1.4

Do the premises include a lot containing the following?
*  Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) Aro 0D Yes
e — If there is no PMAV for a lot, remnant vegetation No (] Yes

If yes to either or both, is the size of the premises 2ha or larger?
No
UO Yes
If yes, is the existing use of the premises rural or environmental?
1 No
0 Yes- (Complete Part J) This application must be referred to the Department of Natural Resources and Water (NRW) as
Concurrence Agency.

PREM, $e nS fee GE lett

 

CONTAMINATED LAND - UNEXPLODED ORDNANCE

 

2.1.5

Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?

Y Yes - (Complete Part N) This application must be referred to the Administering Authority as Concurrence Agency.
No

EG Rexpogtit, seratyls, 2 tek

 

 

PUBLIC PASSENGER TRANSPORT

 

2.41.6

Is the proposed use listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the specified threshold?

()/Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
4 No

 

 

 

RAILWAY SAFETY AND EFFICIENCY

 

2.1.7

 

Is the proposed use listed in schedule 130 of the integrated Planning Regulation 1998 and does it exceed the specified threshold?

tes - This application must be referred to Queensiand Transport (QT) as Concurrence Agency.
No

 

   

 

 

 

Page 18

INTEGRATED PLANNING ACT 1997, {DAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

KOALA CONSERVATION
2.1.8 | |s any part of the premises in a koala conservation area or koala sustainability area?
No
OO Yes _ _.
If yes, is the use for a domestic activity, as defined by the IPA?
OO Yes
OO No
If no, will the use result in the following?
© — Clearing of native vegetation over an area greater than 2,500m? Ono (CyYes
¢ — Anew building and any reasonably associated structure with a total footprint greater [No (Yes
than 1,000m?
e — Anextension to an existing building and any reasonably associated structure if the (No (Yes
extension has a total footprint greater than 1,000m?
« — Extracting gravel, rock or sand from an area greater than 5,000m2 Ono (Yes
« — Excavating or filling an area greater than 5,000m? (No (Yes
» Additional traffic in a koala conservation area or koala sustainability area between [No (1 Yes

6:00pm on a day and 6:00am on the following day

if yes to any one - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

 

wep ition sonedide 259s ot

 

 

 

EASEMENTS AND SUBSTATIONS

 

2.1.9

 

ts the use associated with reconfiguring a lot?
OC ANes
No ~ Answer both (a) and (b) below
(a) Will any part of any structure or work that is the natural and ordinary consequence of the use, be located in an
ea! nt?
no
LI] Yes ~ Answer both (i) and (ii) below

(i) Is there-an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for
ee grid or supply network under that Act?
No

CI Yes - This application must be referred to the entity as Advice Agency.

(ii) Is there an easement in favour of the holder of pipeline licence number 1 issued under the Petroleum Act
1923-for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No
(1 Yes - This application must be referred to the licence holder as Advice Agency.
(b) Is anypart of the premises situated within 100m of a substation site under the Electricity Act 1994?
No
(Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

 

 

 

 

Page 19

INTEGRA,

TED PLANNING ACT 1997 IDAS Assessment Checklist, Vession 24.0, 3 September 2007

 

RESIDENTIAL, COMMERCIAL OR INOUSTRIAL DEVELOPMENT IN A WILD RIVER AREA

 

2.1.10

Is apy part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No

OO Yes a . _—
If yes, is the proposed use for residential, commercial or industrial purposes outside a designated urban area, as defined
by the Wild Rivers Act 2005?

OO No

1 Yes - Subject to the declaration for the wilt river area, assessment by the local govemment is required for the purposes of the
Wild Rivers Act 2005.

   

 

WETLAND

 

2.1.14

{s the proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure?

Ores
wid No
If no, do the premises include a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’?

) No

LL Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency.

  

ota sab 3 iter ai

 

HERITAGE

 

2.4.12

Do the premises include a lot sharing a common boundary with a protected area or registered place under the Queensfand
Herjtage Act 1992?

No
O Yes ~ This application must be referred to the Queensland Heritage Council (QHC) as Advice Agency.

UP Rag ahun, gohedule & table f ten) 72

 

CERT,

AIN PRELIMINARY APPROVALS

 

2.14.13

 

1s preliminary approval sought for the application under the IPA, section 3.1.6?

No :
(1 Yes - (Complete Attachment 2) This application must be referred to the Department of Local Government, Planning, Sport and
Recreation (DLGPSR) as Advice Agency.

 

 

 

 

Page 20

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

BROTHEL
2.2 i Pe boposes use a brothel as defined under the Prostitution Act 1999?
No
OO Yes

If yes, does one or more of the following apply?

© — The land is in, or within 200m of the closest point on any boundary of, a primarily [No [7] Yes
Tesidential area or an area approved for residential development or intended to be
residential in character

¢ — The land is within 200m of the closest point on any boundary of land on which there is (No [1 Yes
a residential building, place of worship, hospital, school, kindergarten, or any other
facility or place regularly frequented by children for recreational or cultural activities
(measured according to the shortest route a person may reasonably and lawfully take, by
vehicle or on foot, between the land proposed for the brothel and other land)

© Theland is within 100m of the closest point of any boundary of land on which thereis [No [£) Yes
a residential building, place of worship, hospital, school, kindergarten, or any facility or
place regularly frequented by children for recreational or cultural activities (measured in
a straight fine)

 — More than 5 rooms are proposed to be used for providing prostitution CiNo [J Yes

© The land is in a town where the Minister for Police and the local government have CINo (J Yes
agreed that all applications for brothels in the local government area are to be refused
if yes to any one - an application for a brothel must be refused by the assessment manager.

If1no to all - (Complete Part H) This aspect of the application is assessed by the focal government for the purposes of the
Prostitution Act 1999.

A! Abia Z stern é

 

 

 

STRATEGIC PORT LAND

 

2.3

ls any part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994?
No

OO Yes
If yes, is the proposed use inconsistent with the approved land use plan?

O No
(J Yes - (Complete Part !) This application must be referred to Queenstand Transport (QT) as Concurrence Agency.

?

  

 

MAJOR HAZARD FACILITY

 

24

 

or ones use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Management Act 2001?
No

OO Yes- {Complete Part L} This application requires assessment by the Department of Emergency Services (DES). if DES is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

 

 

“Ue

 

Page 21

INTEGRATED PLANNING ACT 1997, : IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

CONTAMINATED LAND ~ REGISTERED LAND,

 

25

vironmental Protection Act 1994?
No
OO Yes

If yes, does one or more of the following apply?

be of the land forming the premises on the Environmental Management Register or Contaminated Land Register under
the

» A suitability statement has been given and a site management plan has been approved for the Ono [1 Yes
proposed use of the land, and the proposed use involves only the following -

«the fitout of a building on the land; or

« minor site excavation, including for example, post holes for open-sided non-habitable
structures

¢ — There is currently a notifiable activity on the land and the activity is continuing No OI Yes

© The proposed use is industrial and only involves minor site excavation (6.9. post notes for open- L]No [1 Yes
sided non-habitable structures)

The land is used for a mining activity or petroleum activity Ono DYes

{f no to alf - (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

 

CONTAMINATED LAND - NOTIFIABLE ACTIVITY

 

2.6

 

|s any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for

we activity?
No
OO Yes
If yes, does one or more of the following apply?
* A Suitability statement, removing the land from the environmental management register, has Dino (ClYes

been given under the Environmental Protection Act 1994 for the existing use, or if there is no
existing use, the last use, and the following both apply -

* —honew notifiable activity has occurred on the land since the suitability statement was
issued, :
+ the land is not otherwise contaminated by a hazardous contaminant
* A ssuitability statement has been given and a site management plan has been approved for the LCINo (1) Yes
proposed use of the land, and the proposed use involves only the following -
+e the fit-out of a building on the land; or
«minor site excavation, including for example, post holes for open-sided non-habitable
structures
¢ = The land is used for a mining activity or petroleum activity [No (Yes

it no to all - (Complete Part N) This application requires assessment by the Environmental protection Agency (EPA), If EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

 

 

 

Page 22

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

CONTAMINATED LAND - INDUSTRIAL ACTIVITY

 

27

ls any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?

No
() Yes

If yes, is the proposed use for child care, educational, recreational or residential purposes {including a caretaker residence

on industrial land)?

(No

(Yes - (Complete Part N) This appfication requires assessment by the Environmental Protection Agency (EPA). if EPA is not the
Assessment Manager for the application, it has jurisdiction as Concurrence Agency.

2 ten
2 sen eZ

   
  

88

 

CONTAMINATED LAND — AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY)

 

2.8

 

\s any part of the premises in an area for which an area management advice has been given for natural mineralisation or
on activity (other than for a mining activity or petroleum activity)?
No

4 Yes

If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence
on industrial land)?

00 No

(1 _sYes - (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

 

 

 

Page 23

INTEGRATED PLANNING ACT 1997

AQUACULTURE; WILD RIVER AREA

IDAS Assessment Checklisi, Version 21.0, 3 September 2007

 

2.9

 

Is the’proposed use for aquaculture as defined under the Fisheries Act 1994?
No
OO Yes

\f yes, is any part of the aquaculture intended to be located in a wild river area declared under the Wild Rivers Act 2005?

[L No

If no, will the proposed aquaculture cause no discharge of waste into Queensland waters and be -
« _ of indigenous freshwater fish species listed in the Fisheries (Freshwater) Management Plan 1999, schedule 6;
and
in a catchment listed in that schedule for that species for aquarium display or human consumption only; and
«  cartied out in ponds, or using above-ground tanks, that have a total water surface area of no more than Sha

OO Yes
3 No

If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous
freshwater fish for aquarium display or human consumption only, or nonindigenous freshwater fish for aquarium
display onty, and carried out using only above-ground tanks that have ~

« —afloor area, excluding water storage area, of no more than 50m?; and

* aroof impervious to rain water

OO Yes

O No

If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of
indigenous marine fish for aquarium display only and carried out using only above-ground tanks that
have a total floor area, excluding water storage areas, of no more than 50m2?

OO Yes

C No- (Complete Part Oi) This application requires assessment by the Department of Primary industries and
Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

OO Yes
If yes, is any part of the aquaculture intended to be located in a wild river high preservation area?

(1 No- Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Part 01) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F), Subject to the declaration for the relevant wild river area, assessment may also be
required for the purposes of the Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.

OO Yes - An application for the aquaculture would be taken to be nol properly made and the Assessment Manager must refuse
to receive it.

P AQUOCUTROL

 

 

 

 

14. ——_

Page 24

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
AGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA

2.10 cert of the premises in a wild river area declared under the Wild Rivers Act 2005?
Ni

 

 

lo
OO Yes -
If yes, is the proposed use for the following?
* Agricultural activities as defined under the Wild Rivers Act 2005 LJ] No 1 Yes
* Animal husbandry activities as defined under the Wild Rivers Act 2005 Li No U Yes

{f yes to either, is any part of the premises in the high preservation area in the wild river area?
oO Yes - An application for the use would be taken to be not properly made and the Assessment Manager must refuse fo receive it.

1 No

If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
(21 Yes - An application for the use would be taken to be no! properly made and the assessment manager must refuse to receive it.

(1 No- Uniess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Part Q if agriculture}. (Complete Part R if animal husbendry) Subject
fo the relevant declaration for the wild river area, this application requires assessment by the Department of Natural

Resources and Water (NRW). If NRW is nof the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

 

 

 

 

 

Page 25

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

2.41

 

 

SEQ REGIONAL PLAN
ba part of the premises within the South East Queensland (SEQ) Regionat Plan area?
No
OO Yes _
If yes, are the premises within one or more of the following areas?
* A Major Development Area in the Urban Footprint [1No_ (J Yes - (Answer (a) 0 (c} below}
« The Regional Landscape and Rurat Production Area Ono CL. Yes - (Answer (d) below)
© The Rural Living Area CONo [LD Yes - (Answer (e) below)
The Investigation Area (No (7 Yes - (Answer (f) and (g} below)

For the part of the premises within the Major Development Area
(a) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?

1 No
CL sYes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is
answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also} This application must be referred to the Office
of Urban Management (OUM) as Concurrence Agency.
(b) Does the application involve residential development involving a rural residential purpose as defined under the SEQ
Regional Plan Regulatory Provisions?

O No

CJ Yes- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in ths checklist is
answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office
of Urban Management (OUM) as Concurrence Agency.

(c) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?

O No
OO Yes
If yes, is the Major Development Area within a structure plan as defined under the SEQ Regional Plan Regulatory
Provisions?
1 Yes
If yes, does the IPA, section 3.1.6 apply to the application?
OO No
(1 Yes - The SEQ Regional Plan makes this use assessable under the planning.scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must
be referred to the Office of Urban Management (OUM) as Concurrence Agency.
me) .
If no, does the following apply?
* — Impact assessment is required under the planning scheme OONo (Yes
« — The IPA, section 3.1.6 applies to the application C)No [Yes
¢ — The premises exceed 10,000m? C)No (7 Yes
¢ The gross floor area, as defined under the SEQ Regional Plan Regulatory Ono (Yes

Provisions, on the premises will exceed 10,000m?

if yes to any one - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1
in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This
application must be referred to the Office of Urban Management (OUM) as Concurrence Agency.

 

 

-16----—

Page 26

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area
(d) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?

OO Yes

If yes, ls every Urban activity in the application excluded from being assessable for the ptirposes of the SEQ Regional
Plan in the RLRP Area?

Cl Yes

(No ~ The SEQ Regional Plan makes each urban activily assessable under the planning scheme. (Ensure Questions 2.1 in
this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) Each urban activity that is
assessable in the RLRP Area must be referred to the Office of Urban Management (OUM) as Concurrence Agency,

DO No

Ifno, does the application involve residential development Involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?

OO No
Ol Yes

If yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?

(No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be
referred to the Office of Urban Management (OUM) as Concurrence Agency.

{1 Yes

If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the

_tegional planning Minister?
(1 No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in

this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This
application must be referred to the Office of Urban Management (OUM) as Concurrence Agency.

OO Yes

For the part of the premises within the Rural Living Area
(e) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?

O No
C1 Yes

If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Plan in the Rural Living Area? ‘

( Yes

LJ No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist
Js answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also} Each urban activity that is assessable in
the Rural Living Area must be referred to the Office of Urban Management (OUM) as Concurrence Agency.

For the part of the premises within the Investigation Area
(f} Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?

OO No

CJ Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2 1 in this checklist is
answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office
of Urban Management (OUM) as Concurrence Agency.

 

 

 

 

 

Page 27

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

{g) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
(J Yes

If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ
Regional Plan in the Investigation Area?

O Yes

(1) __No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also) Each urban activity that is
assessable in the investigation Area requires assessment by the Office of Urban Management (OUM) as
Concurrence Agency.

O No

If no, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?

OO No
{] Yes
If yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?
O No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must

oO be referred to the Office of Urban Management (OUM) as Concurrence Agency.
Yes

If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the

regional planning Minister?

OU Yes

( No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1
in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This
application must be referred to the Office of Urban Management (OUM) as Concurrence Agency.

GQUHO Pree SIS. Ove T

 
    

iA * 2

 

 

 

 

CONSERVATION ESTATE
2.12 Spe proposal for urban purposes, as defined under the IPA?
No
C) Yes
If yes, is the use proposed on a lot situated in, or within 100m of, any of the following? .
.
hare wen gre eae iapotiaeramscimatnees, yg es
e A State forest or timber reserve under the Forestry Act 1959 0 No D Yes
e Amarine park under the Marine Parks Act 2004 CJ No C1 Yes
e — Arecreation area under the Recreation Area Management Act 1988 CI No C Yes
e — Aworld heritage area listed under the World Heritage Convention 1 No OO Yes
e Brisbane forest park under the Brisbane Forest Park Act 1977 CJ No OO Yes

if yes to any one - This application must be referred to the chief executive under the relevant Act mentioned as Advice Agency.

19 Penynat oo. 210s ane é 8m 45

 

 

TBE

 

Page 28

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT - this question only applies for applications not also seeking

approval to carry out operational work.

 

2.13

 

Does‘ the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
No _—

OO Yes
If yes, indicate what the proposed operational work.is reasonably necessary for (Tick applicable boxes)
* The removal, destruction or damage of dead marine wood on unallocated State land, other _[] No (] Yes
than in a wild river area, for trade or commerce

¢ The maintenance of existing structures, including, for example, the following structures, if [JNo [J Yes
the structures were constructed in compliance with all the requirements, under any Act,
telating to a structure of that type -

+ — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;

« — existing drainage structures;
* — existing powerlines or associated powerline infrastructure

¢ — Educational or research purposes or for monitoring the impact of development on marine [No (1 Yes
plants

© Other purposes Ono (Cl Yes

If yes to “other purposes”, does a development permit exist for that proposed operational work?

QO Yes
LJ No

If no, has approvat been sought in a separate application?

O Yes
(0 No- this epplication must also be for operational work for removing, destroying or damaging marine plants under
the Fisheries Act 1994. (Complete Section 4 of this checklist).

     

tabis 4 1a%: 3 fessessanis

 

 

 

“T49-

 

Page 29

INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 21.0, 3 September 2007

SECTIO N 3 Section 3 must be completed when the application seeks approval to reconfiguring a lot.
ip 5 a

Pt owes Srl

 

STATE-CONTROLLED ROAD

 

34

ls anypart of the premises within 100m of a State-controlled road, or part of a future State-controlted road?
No
{f no, is the proposed reconfiguration listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
O No

CJ Yes - The application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

0 Yes

{f yes, will the proposed reconfiguration result in the following?
* — Anincrease in the total number of lots [ino [Yes
¢ — Anincrease in the total number of lots abutting the State-controlled road No OD Yes

If yes to either or both, is the reconfiguration proposed in a future State-controlled road defined by route?

O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO No - This application must be referred to OMR as Advice Agency.

 
  

 

ved 2 wen é

 

COASTAL MANAGEMENT DISTRICT

 

3.2

Spf at of the premises within a coastal management district?

No
[Yes - (Complete Part M) This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

Pie tuladter schedule 2 able 2 tear 13a:

 

VEGETATION CLEARING

 

3.3

 

Do the premises include a lot containing the following? Kh
*  Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) lo OD Yes
© — Ifthere is no PMAV for a lot, remnant vegetation MZ No oO Yes

If yesto elther or both, are 2 or more lots proposed to be created?
No ,
OO Yes
If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
CJ No
LI Yes
If yes, is the size of any lot proposed to be created, 25ha or smaller?
O No

C1) Yes- (Complete Part J} This application must be referred to the Department of Natural Resources and Water (NRW}
as Concurrence Agency.

   

 

 

 

Page 30

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

EASEMENTS

 

3.4

Is any part of the premises subject to an easement?
No
TL Yes - Answer-both (a) and (b) below —
{a} Is there an easement in favour of a distribution entity or tansmission entity under the Electricity Act 1994 for a
transmission grid or supply network under that Act?

O No

C1 Yes: this appication must be referred to the entity as Advice Agency.

(b) Is there an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum Act 1923 for the
construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No

C1 Yes - This application must be referred to the licence holder as Advice Agency.

    

F ™,

 

ELECTRICITY SUBSTATIONS

 

3.5

ls any part of the premises situated within 100m of a substation site under the Electricity Act 1994?

No
(Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

 

tally Z tern 2}

 

CONTAMINATED LAND - REGISTERED LAND

 

3.6

 

{s any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under
oe Protection Act 1994?

No
{) Yes
If yes, does one or more of the following apply?
* Assuitability statement has been given and a site management pian has been approved forthe [}No [] Yes
proposed use of the land, and the proposed use involves only the following -
« the fit-out of a building on the land; or
« — minor site excavation, including for example, post holes for open-sided non-habitable
structures
© — There is currently. a notifiable activity on the land and the activity is continuing CNo DYes

« — The proposed use is industrial and only involves minor site excavation (e.g. post holes for open- (No (C1Yes
sided non-habitable structures)

if no to all - (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is nol the
Assessment Manager for the apptication, the agency has jurisdiction as Concurrence Agency.

    

{able ¢ inn 28}

 

 

a4. —

 

Page 31

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

CONTAMINATED LAND - NOTIFIABLE ACTIVITY

 

37

Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?

No. eee
OO Yes
If yes, does one or more of the following apply?
* Asuitability statement, removing the land from the environmental management register,has [No [1] Yes

been given under the Environmental Protection Act 1994 for the existing use, or if there is no
existing use, the last use, and the following both apply -

* NO new notifiable activity has occurred on the land since the suitability statement was
issued;

« _ the land is not otherwise contaminated by a hazardous contaminant

* A suitability statement has been given and a site management plan has been approved forthe []No [] Yes
proposed use of the land, and the proposed use involves only the following -
e _ the fit-out of a building on the land; or

« — minor site excavation, including for example, post holes for open-sided non-habitable
structures

tf no to both - (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

iP Race ata seursuic 2 tale 2. dane 27a}

 

CONTAMINATED LAND ~ INDUSTRIAL ACTIVITY

 

3.8

Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no,éxisting use was it last used for an industrial activity {other than for a mining activity or petroleum activity)?
No
OO Yes
if yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence
on industrial and)?
OO No
(1 Yes - (Complete Part N) This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

so Bagurai.on. sonedule 2. taule @ sige 2 tie)

 

 

CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY)

 

3.9

ls any part of the premises in an area for which an area management advice has been given for natural mineralisation or
a activity (other than for a mining activity or petroleum activity)?
No

O Yes

If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence
on industrial land)?

Cl No

(1 _sYes - (Complete Part N) This application must be referred the Environmental Protection Agency (EPA) as Concurrence Agency.

 

an 2 tee Za:

 

CONTAMINATED LAND ~ AREA MANAGEMENT ADVICE (UNEXPLODED ORDNANCE)

 

3.10

 

 

we of the premises in an area for which an area management advice has been given for unexploded ordnance?
No.
oO Yes - (Complete Part N} This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

Beg wat ta 8 ce 0 te 78

 

+22- oo

 

Page 32

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
SEQ REGIONAL PLAN

 

 

3.11 Sree of the premises within the South East Queensland (SEQ) Regional Plan area?
No
OO Yes . . —.
If yes, is the application seeking approval for subdivision?
(O No
D1 Yes - Answer both {a} and (b) below

(a) Is any part of the premises located within a Major Development Area and not included in a structure plan as defined
under the SEQ Regional Plan Regulatary Provisions?

No
OO Yes
If yes, indicate whether 0 or not ef the following circumstances apply to the subdivision proposal — {Tick if applicable)
: The subdivision:
‘0 Creates lots with a size greater ‘than 1100 hectares CINo (Yes

 

i Creates a residual lot CINo D Yes

i) Creates the same number or fewer tots than the number of lots being subdivided [No - O Yes

 

 

 

‘ {ivy “Creates a single additional fot when 2 an existing loti is severed by aroadthatwas [JNo ((]Yes
gazetted before 2 March 2006

rn ee cee

 

 

| :) Creates a single additional lot for an emergency services facility Oo No , oO Yes
(vi) Creates single additional lot fora water cycle management infrastructure -—<LJNo C1 Yes.
4 (i) ‘Creates a single additional lot for waste management facility ONo 0 Yes
a Creates a single additional tot for r telecommunications inastuctue oO No a Yes ,
|) “Creates a single additional lot for electricity infrastructure : , ONo Dyes
| (x) Creates a single additional lat for cemetery 0 oracrematorium oO No OYes :

 

| (xi) Is carried out in association with a development approval for a material change of [.]No (1 Yes
use of premises that has not lapsed, if the development approval! was for a

i

! development application that was made before 31 October 2006
i wa eee me
i
i

(xii) Is ‘carried out in association with a development approval for a material change of ‘oO No (} Yes
use of premises that -

« — was given for development made assessable under SEQ Regional Plan
Regulatory Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and

+  hasnot lapsed

 

: iit) Creates lots fora purpose or is being carried out in association with development Eno (1 Yes
| other than those stated in (i) - (xii) above

 

 

To the extent the application involves other development under (xili) above - this application must be referred to the
Office of Urban Management (OUM} as
Concurrence Agency.

 

 

 

 

3 For the purposes of the SEQ Regional Plan, subdivision means - (a) creating a lot by subdividing another lot: or (b) dividing land into paris by agreement (other than a
lease for a term, including renewal options, not exceeding 10 years) rendering different parts of a lot immediately available for separate disposition or separate
occupation)

-— 2+ —

Page 33

INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 21.0, 3 September 2007

 

(b) 1s any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
OO No
(1s Yes - Answer (i) - (iii)

~--- (i) ls any part of the premises located in a rural precinct or an interim rural! precinct and is any lot resulting
from the subdivision proposed to have a lot size smaller than the minimum stated in the relevant planning

 

 

 

 

 

 

 

 

 

 

scheme for the precinct?
OC Yes - Complete Table 1
0 No
TABLE 1 - Indicate whether or not the following circumstances apply to the subdivision proposal — (Tick if applicable)
The subdivision: :
(i) Creates a residual lot OONo |DYes
(ii) Creates the same number or fewer lots than the number of lots being subdivided Oo |DYes
(i) Creates a single additional lot when an existing lot is severed by a road that was gazetted before |[_] No |{_] Yes
2 March 2006
(iv) Creates a single additional lot for an emergency services facility CINo iL] Yes
{v) Creates a single additional lot for a water cycle management infrastructure Ono |DYes
{vi) Creates a single additional tot for waste management facility CNo |L1Yes
(vii) Creates a single additional lot for telecommunications infrastructure Ono |ClYes
(vil) Creates a single additional lot for electricity infrastructure Ono jDYes
(ix) Creates a single additional lot for cemetery or a crematorium (No |D Yes

 

(x) Is being cartied out in‘association with a development approval for a material change of use of {[[)No j(] Yes
premises that has not lapsed, if the development approval was for a development application
that was made before 31 October 2006

(xi) Is being carried out in association with a development approval for a material change ofuseof |(No /() Yes
premises that -
« was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
+ has not lapsed

 

 

 

(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions DNno | Yes
(xiii) ts for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area |LJNo |C] Yes
and -

« the development application or development application (superseded planning scheme) for
the subdivision is properly made before 2 March 2008; and

+ — the subdivision relates to land located in a zone or equivalent designated area mentioned in
a notice published in the gazette by the regional planning Minister

(xiv) Is being carried out under - CiNo |D Yes
» an exemption given by the regional planning Minister for an application for exemption
lodged before 30 September 2005; and
«  adevelopment approval for a development application that is properly made within six
months of the exemption being given by the regional planning Minister

 

 

(xv) Involves the extension of an existing lease or licence over land if - Cino |D Yes
* no additional lots are created; and
* — any use permitted by a subsequent ease or licence is consistent with a use permitted by
the previous lease or licence; and
« — the previous lease was obtained before 31 October 2006

 

(xvi) Creates lots for a purpose or is being carried out in association with development other than Ono iD Yes
those stated in (i) - (xv) above

 

 

 

 

 

To the extent that the application involves other development under (xvi) above - the subdivision is prohibited and an application
involving that component cannot be made..

 

 

 

 

— 24+ —__

Page 34

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

{ii) For any part of the premises, does the relevant planning scheme state a minimum lot size of greater than
100ha and is any lot resulting from the subdivision proposed to have a lot size less than that stated size?

(1) Yes - Complete Table 2

_~ Ol No —.

TABLE 2 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if appficable)

 

 

 

 

 

 

 

 

 

 

The subdivision:

{i) Creates a residual fot No {CJ Yes
{iC teates the same number or fewer lots than the number of lots being subdivided Ono |D Yes
(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before |[_]No |] Yes

2 March 2006

(iv) Creates a single additional lot for an emergency services facility Cinco |7 Yes
(v) Creates a single additional lot for a water cycle management infrastructure CINo | Yes
(vi) Creates a single additional lot for waste management facility (No {C1 Yes
(vii) Creates a single additional lot for telecommunications infrastructure (no |C1 Yes
(viii) Creates a single additional lot for electricity infrastructure ONo jC Yes
(ix) Creates a single additional lot for cemetery or a crematorium LINo |D) Yes

 

(x) Is being carried out in association with a development approval for a material change‘of use of |[-]No |] Yes
premises that has not lapsed, if the development approval was for a development application
that was made before 31 October 2006

(xi) Is being carried out in association with a development approval for a materia! change of use of Ono |OYes
premises that -
« — was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
+ — has not lapsed

 

 

 

(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions (No iL Yes
(xiii) {s for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area iC]No |() Yes
and -

« the development application or development application (superseded planning scheme) for
the subdivision is properly made before 2 March 2008; and

« _ the subdivision relates to land located in a zone or equivalent designated area mentioned in
a notice published in the gazette by the regional planning Minister

(xiv) Is being carried out under - C1No | Yes
« an exemption given by the regional planning Minister for an application for exemption
lodged before 30 September 2005; and
« — adevelopment approval for a development application that is properly made within six
months of the exemption being given by the regional planning Minister

 

 

(xv) Involves the extension of an existing lease or licence over land if - (No jC Yes
* no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by
the previous lease or licence; and
« _ the previous lease was obtained before 31 October 2006

 

(xvi) Creates lots for a purpose or is being carried out in association with development other than ONo |D) Yes
those stated in (i) - (xv) above

 

 

 

 

 

To the extent that the application involves other development under {xvi} above - the subdivision is prohibited and an application
involving that component cannot be made

 

 

 

 

Page 35

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

(iii)For all lots, other than those affected by (i) and (ii) above, are any lot resulting from the subdivision
proposed to have a tot size of less than 100 hectares?

C1 Yes - Compiate Table 3

a) _

TABLE 3 - Indicate whether or not the following circumstances apply to the subdivision proposat - (Tick if applicable}

 

The subdivision:

 

(Creates a residual lot Gino | Yes

 

(i)C reates the same number or fewer lots than the number of lots being subdivided Ono iL Yes

 

(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before |[_] No |) Yes
2 March 2006

 

 

 

 

 

 

(iv) Creates a single additional lot for an emergency services facility No | Yes
(v) Creates a single additional lot for a water cycle management infrastructure LiNo (CD Yes
(vi) Creates a single additional lot for waste management facility OCONo |L) Yes
(vil) Creates a single additional lot for telecommunications infrastructure Cine {LD Yes
(viii) Creates a single additional lot for electricity infrastructure Lino |DYes
(ix) Creates a single additional lot for cemetery or a crematorium CINo {CJ Yes

 

(x) _ Is being carried out in association with a development approval for a material change of use of |[JNo |L] Yes
premises that has not lapsed, if the development approval was for a development application
that was made before 31 October 2006

 

(xi) Is being carried out in association with a development approval for a material change of use of |[JNo /() Yes
premises that -
+ — was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« has notlapsed :

 

 

(xii) Is in a rural village as defined under the SEQ Regional Plan Regutatory Provisions (No |( Yes
(xiii) 1s for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area |[]No /{7J Yes
and -

« the development application or development application (superseded planning scheme) for
the subdivision is properly made before 2 March 2008; and

+ _ the subdivision relates to land located in a zone or equivalent designated area mentioned in
a notice published in the gazette by the regional planning Minister

 

(xiv) 1s being carried out under - Ono |DYes
* — anexemption given by the regional planning Minister for an application for exemption
lodged before 30 September 2005; and
+  adevelopment approval for a development application that is properly made within six
months of the exemption being given by the regional planning Minister

 

(xv) Involves the extension of an existing lease or licence over land if - [Jno |(1 Yes

« no additional lots are created; and

+ — any use permitted by a subsequent lease or licence is consistent with a use permitted by
the previous lease or licence; and

« _ the previous lease was obtained before 31 October 2006

 

(xvi) Creates lots for a purpose or is being carried out in association with development other than (No |L1Yes
those stated in (i) — (xv) above

 

 

 

 

 

 

 

O Far ye.

To the extent that the application involves other development under (xvi} above - the subdivision is prohibited and an application
involving that component carina be made

stout ates vam

 

 

 

Page 36

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

KOALA CONSERVATION
3.12 | Is any part of the premises in a koala conservation area or koala sustainability area?
No
LJ) Yes a

If yes, will the proposed reconfiguration result in the following?
* — Anincreased number of lots (Jno (Yes

© — Clearing of native vegetation over an area greater than 2,500m? [JNo (1 Yes
if yes to either or both - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

 

 

CANAL DEVELOPMENT

 

3.13

Is the’proposed reconfiguration in connection with the construction of a canal?
No
Ls Yes - (Complete Part M) This application must be referred to the Environmental Protection Agency (EPA)as Concurrence Agency.

 

 

 

tite 2. table 2
DECLARED CATCHMENT AREA
3.14 | 's theproposed reconfiguration in an area declared to be a catchment area under the Water Act 2000?
No
(3 Yes
If yes, is any lot resulting from the reconfiguration proposed to be less than 16ha?
C1 No

0 Yes - This application must be referred to the Department of Natural Resources and Water (NRW) as Concurrence Agency,

sm tegeaninnd soe gain. 7 taale 2 dem 19

 

PUBLIC PASSENGER TRANSPORT

 

 
 

 

 

 

3.15 | |s the proposed reconfiguration listed in schedule 13A of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
Des - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
No
‘ addule 2 :abte 2. ters 30
r
RAIL TRANSPORT
3.16 | Is the proposed reconfiguration listed in schedule 13B of the integrated Planning Regulation 1998 and does it exceed the

specified threshold?

{es - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
No

  

 

 

 

Page 37

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

  

 

 

 

 

 

 

WETLAND; CONSERVATION ESTATE
3.17 one proposed reconfiguration result in more than 10 tots or any {ot less than Sha in area?
No
LD Yes - Answer (a} and (b) below . _ ;
(a) Does the proposed reconfiguration involve a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable
wetlands’?
C1 No
{J Yes - This appiication must be referred to the EPA as Advice Agency.
{b} Does the reconfiguration involve a lot situated in, or within 100m of, the following?
«  Aprotected area, forest reserve, critical habitat or area of major interest
under the Nature Conservation Act 1992 C1 No CJ Yes
« A State forest or timber reserve under the Forestry Act 1959 DLINo (Yes
© Amarine park under the Marine Parks Act 2004 OlNo (CL Yes
© — Arecreation area under the Recreation Area Management Act 1988 Ono (C1 Yes
«  Aword heritage area listed under the World Heritage Convention LNo CO Yes
¢ Brisbane forest park under the Brisbane Forest Park Act 1977 No [Yes
if yes to any one - this application must be referred to the Queensland Government department administering the relevant Act
mentioned as Advice Agency
ow Rea Hams 38 and 29
HERITAGE :
3.18 | Does the proposed reconfiguration involve a lot sharing a common boundary with a protected area or registered place under the
Queeristand Heritage Act 1992?
No
LD Yes - This application must be referred to the Queenstand Heritage Council (QHC) as Advice Agency.
iP Requidton schedui 2, fable x ton: 44
WILD RIVER AREA - Although legislation provides for assessment of lot reconfiguration for the purposes of the Wild Rivers Act 2005,
currently no declarations for any of the wild river areas apply the Wild Rivers code to that type of development.

 

Page 38

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

S ECT 10 N 4 Section 4 must be completed when the application seeks approval to carry out operational work.

 

PLANNING SCHEME

 

144

- wn of the proposed operational work assessable under a planning scheme?
Ni

lO — (Go io Question 4.2 below
(Yes - (Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below}

 

STATE-CONTROLLED ROAD

 

4.44

 

aprpan of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

OO No

(Yes - This apptication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
OO Yes

If yes, is all of the proposed operational work associated with the following?
e  Amaterial change of use that is assessable under the planning scheme 0 No 1 Yes

* — Reconfiguring a lot that does not increase the total number of lots and does not (No C) Yes
increase the total number of lots abutting the State-controlled road

if no to either or both - Answer (a) - {c) below

{a) 4s any of the proposed operational work associated with access to a State-controlled road?
No

(2 Yes - This application must be referred fo the Department of Main Roads (DMR} as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
0 No
0) Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?

(_No- This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
C1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?

OO No
OO Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?

{[]_ No - This application must be referred to the Department of Main Roads (DMR} as Advice Agency.
(1) Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

 

 

 

 

Page 39

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

ACID SULFATE SOILS

 

4.1.2

-—-} No ao.

ls any of the operational work proposed in a local government area listed‘ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?

(J Yes .
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

Ol No
0 Yes

If yes, does the proposed operational work involve the following?

e — Excavating more than 1,000m? of soil or sediment at or below Sm AHD No (C1) Yes

«Filling the premises with 1,000m? or more of material with an average depth of 0.5m [_] No O Yes
on land, soil or sediment at or below 5m AHD

if yes to either or both - this application must to be referred to the Department of Natural Resources and Water (NRW) as Advice Agency

  
    

 
    

 

 

a Cy G02 ! 2 OTE Dé! gent zivOhiny Aci
EASEMENTS AND SUBSTATIONS
4.1.3. {Is any of the proposed operational work for filling or excavation?
No
CO) Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
1 Yes

C1 No ~ Answer both (a) and (b) below

(a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?

OO No

CJ Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
1 No

(11 Yes - This application must be referred to the entity as Advice Agency.
(b) _ Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
[] No

[Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

 
  

b 10¢a}
dom 100)

 

4.14

 

Petydleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No

LD Yes
It yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated
with reconfiguring a lot?

re part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the

No

OO Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
C1 No

(1) Yes - This application must be referred to the licence holder as Advice Agency.

ose gies 2 ?

 

 

 

4 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

— -30- —

 

Page 40

INTEGRATED PLANNING ACT 1997
PUBLIC PASSENGER TRANSPORT
4.15

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

ts any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed
the specified threshold?

No nee
Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
eB EL
RAILWAY SAFETY AND EFFICENCY
416

 

 

 

Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed

o ne specified threshold?
; No

C1 Yes - This application must be referred to Queensland Transport (QT}as Concurrence Agency.

schedule d tale 3 Jen th
KOALA CONSERVATION

4.17 we of the premises in a koala conservation area or koala sustainability area?
No

OO Yes

If yes, is all of the proposed operational work associated with a material change of use or recanfiguring a lot for which
teferral is required in relation to koala conservation (ie. did you answer ‘yes' to all questions in either Q2.1.8 or Q 3.12)?

 

 

 

{1 Yes

CI No
{f no, is the proposed operational work for a domestic activity, as defined by the IPA?
OO Yes
{] No

If no, will the activity result in the following?

* — Clearing of native vegetation over an area greater than 2,500m2  ([} No Yes
* — Extracting gravel, rock or sand from an area greater than 5,000m2 [No [] Yes
e — Excavating or filling an area greater than 5,000m? Ono CYes

if yes to one or more - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
98 oyu Shen cetoause 2 table 3, var 19

 

 

 

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial

development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of development.

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA

42 sofa the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
No

OO Yes
If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

(0 No- (Complete Part } The operational work associated with reconfiguring is assessed by the local government.
LI Yes

 

 

If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban
area, as defined by the Wild Rivers Act 2005?
oO No - (Complete Part E) The operational work associated with reconfiguring is assessed by the focal government.

(1) Yes (Complete Part E) The operational work associated with reconfiguring is assessed by the focal government, and subject

to the deciaration for the relevant wild river area, assessment by the local government is required for the purposes of the
Wild Rivers Act 2005.

 
 

 

 

  

 

 

3. —

Page 41

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 Septem bes 2007

 

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA

 

43

 

 

Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

() Yes
If yes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
OO No
OO Yes

If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section
22A for one or more of the following?

(a) A project declared to be a significant project under the State Development and Public (]No [1] Yes
Works Organisation Act 1971, section 26

(b) Necessary to control non-native plants or declared pest OlNo [Yes
(c) To ensure public safety Ono (CO) Yes

(d) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing CINo (1 Yes
necessary built infrastructure, if there is no suitable alternative site for the fence,
firebreak, road, track or infrastructure

(e) A natural and ordinary consequence of other assessable development for which a ONo (Yes
: development approval as defined under the Planning Act was given, or a development
application as defined under the Planning Act was made, before 16 May 2003

(f) For fodder harvesting Ono [Yes
(g) For thinning CONo (Yes
(h) For clearing of encroachment [No CO) Yes
(i) For an extractive industry ONo (Yes

(j) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or Cino Yes
grazing purposes

{k) For clearing regrowth on freehold land, or indigenous land, in a wild river high No (Yes
preservation area.

if no to all — the clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.

{f yes to any one, is the proposed clearing associated with a material change of use or reconfiguring a lot for which
referral is required in relation to clearing vegetation (ie. did you answer ‘yes’ fo all questions in either Q2.1.4 or Q 3.3)?
OO Yes
(] No - Answer (a) (b) and (c) below.
Unless the advice provided below {in relation to ail elements of the proposed clearing) is *The clearing is not a
relevant purpose and the Assessment Manager must refuse lo receive the application” - Complete Part J. This

application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager, the agency has jurisdiction as Concurrence Agency.

(a) _ Is any of the proposed clearing in an area declared as an area of high nature conservation value (other
than a wild river declared area) or an area vulnerable to land degradation under the Vegetation
Management Act 1999?

C1 No
(1 Yes

If yes, is any of the proposed clearing for (e), {f), (i) or @) above?
O No

CJ Yes - The clearing is not a relevent purpose and the Assessment Manager musi refuse to receive the
application

 

 

Page 42

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.0, 3 September 2007
(b) _!s any of the proposed clearing in a wild river high preservation area declared under the Wild Rivers Act
2005?
OO No

(0 Yes - Answer (i) and (ii) below we
{i)_ Is any of the proposed clearing for (a), {f), (g) or (i) above?

(1 No- Subject to the dectaration for the relevant wild river area, the application requires assessment
for the purposes of the Wild Rivers Act 2005.

0 Yes
If yes, is there an approved property development plan applying to the land?
(0 No - The clearing is not a relevant purpose and the Assessment Manager must refuse fo
receive the application.
0 Yes - Unless the application is consistent with any approved property development plan
applying to the land, the Assessment Manager must refuse to receive it. Subject to the

declaration for the relevant wild river area, the application requires assessment for the
purposes of the Wild Rivers Act 2005.

{ii) Is any of the proposed clearing in a registered area of agriculture on a registered area of
agriculture map?
OO Yes
OO No

lfno, is any of the clearing for (j) or (k) above?

(1 No - Subject to the declaration for the relevant wild river area, the application requires
assessment for the purposes of the Wild Rivers Act 2005.

1 Yes

If yes, is there an approved property development plan applying to the land?
(1) No- The clearing is not for a relevant purpose and the Assessment Manager must
refuse to receive the application
(0 Yes ~ uniess the application is consistent with any approved property development
plan applying to the land, the Assessment Manager must refuse to receive it.
Subject to the declaration for the relevant wild river area, the application requires
assessment for the purposes of the Wild Rivers Act 2005.

(c) 1s any of the proposed clearing in a koala conservation area or koala sustainability area?
0 No
OO Yes

If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is
required in relation to proposed clearing in a koala conservation area or koala sustainability area
(ie. did you answer Yes' to all questions in Q3.12}?

DD Yes

OO No
If no, is any of the proposed clearing over an area greater than 2,500m2?
O No

Cs Yes - This application must be referred to the Environmental Protection Agency {EPA} as
Concurrence Agency.

 

tavly d cerrs 8 1S

 

 

 

 

 

Page 43

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

 

44

ts any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a watercourse,
lake or Spring (other than under the Water Act 2000, section 202), (3) or (5)), or from a dam constructed on a watercourse?

No - —

(1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency

If yes, is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 20057

CI Yes — Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be
required for the purposes of the Wild Rivers Act 2008. Also, in certain circumstances an application for operational work is
taken to be nol properly made and the Assessment Manager must refuse to receive the application, (The refevant form for an
application would depend on the nature of the work)

0 No

If no, is the work for the following?

e —Awater pump (No [2 Yes (Complete Part Kz)
« Water storage CONo C1 Yes (Complete Part K:}
¢ — Gravity diversion from a watercourse (No (1 Yes (Complete Part Ke)
¢ — Watercourse diversion CI No [1 Yes (Complete Part Ke)
¢ — Other work for taking or interfering with water CNo LC) Yes (Complete Part Ko}

  
 
 

    

id nver atta;
PUG sentir 45a

 

45

Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
No .

(1 Yes - (Complete Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

Hares dite

 

46

 

|s any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
No
{] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 Ono (Yes

¢ — Aregulation under the IPA or another Act UJ No C1 Yes

if yes to either or both - (Complete Pari Ka). This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

(b) 1s any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a
wild river area declared under the Wild Rivers Act 2005?

[J No

| Yes - Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be
required for the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an application for operational work
is taken to be not properly made and the Assessment Manager must refuse to receive it. (Complete Part Kyif an
application is made.)

 

 

 

4:

 

Page 44

INTEGRATED PLANNING ACT 1997, IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

47

  

be of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
No

OU Yes

If yes, are the operations mentioned as assessable development in the following?
* — Awater resource plan under the Water Act 2000 [No 0 Yes
« — Aregulation under the IPA or another Act (No (Yes

If yes to either or both - (Complete Part K1) This application requires assessment by the Department of Natural Resources and
Water (NRW)... If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

«a

  

 

 

|s apy of the proposed operational work to allow, under the Water Acf 2000, for interfering with overland flow water

  

 

 

 

4.8
[MI No
(1 Yes - Answer both (a) and (b) below
(a) Is the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?

oO Yes — Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may
be required for the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an application for
operational work is taken to be not properly made and the Assessment Manager must refuse to receive it.
{Complete Part Kyoif an application is made.)

O No

Ifnno, are the operations mentioned as assessable development in the following?
e Awater resource plan under the Water Act 2000 (No Dyes
¢ Aregulation under the IPA or another Act CINo OYes
if yes to either or both - (Complete Part Ko) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.

(b) ts the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage
and embankment area (other than a wild river floodplain management area) and declared to be assessable under
that Act?

(0 No
UL Yes - (Complete Part K1o) This apptication requires assessment by the Department of Natural Resources and Water (NRW).
If NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
ig and Yosh
4
49

Is the proposed operational work for the following? A
¢ For the construction of a referable dam as defined under the Water Act 2000 No (1 Yes
e . To increase the storage capacity of a referable dam by more than 10% No (1 Yes

If yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence

 

 

 

 

Page 45

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

TIDAL WORK; WILD RIVER AREA

 

4.10

 

No

(a)

 

Is any’of the proposed operational work tidal work, other than excluded work defined under the IPA?

C1 Yes - Answer (a) and (b) below —--
\s any of the proposed tidal work prescribed tidal work?
OO Yes

If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

1 No
If no, is the work proposed in a canal?

No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

CJ No- (Complete Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for
the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency.

0 Yes - (Complete Part P). If the Environmental Protection Agency (EPA) is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also
requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency and
Qh Fire and Rescue Service as Advice Agency.

O Yes

It yes, is any of the proposed tidal work for a marina with more than, 6 vessel berths?

(C] No - (Comptete Part P), This application must be referred to Queensland Transport (Maritime Safety Qid)
as Concurrence Agency,

(C1 Yes - (Complete Part P). This application must be referred to Queensland Transport (Maritime Safety Qld)

g as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
Yes

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

( No-An application for the operational work would be taken to be not properly made and the Assessment
Manager must refuse to receive it.

CI Yes

Ityes, is the work proposed in a canal?

C] No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

(C1 No- Unless the application is consistent with any property development plan applying to the land,
the Assessment Manager must refuse to receive it (Complete Part P) If the Environmental
Protection Agency (EPA) is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency. The application also requires assessment by
Queensland Transport (Maritime Safety Qld) as Concurrence Agency and assessment for
the purposes of the Wild Rivers Act 2005.

[Yes ~ Uniess the application is consistent with any property development pian applying to the
fand, the Assessment Manager must refuse to receive it (Complete Part P) if the
Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also
requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence
Agency and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for
the relevant wild river area,.the application also requires assessment for the purposes of
the Wild Rivers Act 2005.

OO Yes

 

 

Page 46

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If yes, is any of the proposed tidal work for a marina with more than 6 vessel! berths?

| No - Unless the application is consistent with any property development plan applying to the land,
the Assessment Manager must refuse to receive it (Complete Pari P) This application must
be referred.to Queensland Transport (Maritime Safety Qld) as Concurrence Agency.
Subject to the declaration tor the retevant wild river area, the application also requires
assessment for the purposes of the Wild Rivers Act 2005.

{] Yes - Uniess the application is consistent with any property development plan applying to the
land, the Assessment Manager must refuse to receive it (Complete Part P) This
application must be referred fo Queensland Transport (Maritime Safety Qld) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. The application
also requires assessment for the purposes of the Wild Rivers Act 2005.

 

OO No
If no, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
OO Yes

If yes, is all of the proposed operational! work for specified works under the Wild Rivers Act 2005?

oO No - An application for the operational work would be taken to be not property made and the Assessment
Manager must refuse to receive it.

OO Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No = Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it (Complete Part M) This application requires
assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queensland Transport (Maritime Safety Qld} as Concurrence Agency and, subject fo
the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act
2005.

OD Yes - Unless the application is consistent with any properly development plan applying to the land, the
assessment manager must refuse to receive it (Complete Part M) This application requires
assessment by the Environmental Protection Agency (EPA), if EPA is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queenstand Transport (Maritime Safety Qld) as Concurrence Agency and Qld Fire
and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

OO No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

CO No - (Complete Part M) This application requires assessment by the Environmental Protection Agency
(EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime
Safety Qld) as Concurrence Agency.

OO Yes - (Complete Part M) This application requires assessment by the Environmental Protection Agency
(EPA), if EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime
Safety Qid) as Concurrence Agency) and Qld Fire and Rescue Service as Advice Agency.

(b)| _s any of the proposed tidal work to be carried out in one or more of the following tidal areas?
« — One only local government tidal area [No (Yes

¢ — Starting in one local government tidal area and extending into another local Ono (OO) Yes
government tidal area (but in no strategic port tidal area)

¢ — Intwo or more local government tidal areas but not starting in either local government CINo (] Yes

tidal area
© — One only strategic port tidal area Ono (1 Yes
« — Atidal area that is not a strategic port tidal area or a local government tidal area [No (1) Yes

 

 

 

 

 

Page 47

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

 

4.11

 

 

an the operational work proposed to be carried out within a coastal management district?
N

lo

OO Yes —_—-
If yes, is the proposed operational work for the following?
¢ — Interfering with quarry material on State coastal land above high-water mark Ono COlYes
« Disposing of dredge spoil or other solid waste material In tidal water= [1No (J Yes

¢ — Draining or allowing drainage or flow water or other matter across State costal land above [LINo (2) Yes
high-water mark

© — Constructing or installing works in a watercourse where the works are not assessable under Ono (CO Yes
IPA, schedule 8, part 1, table 4, items 3 or 4

¢ — Reclaiming land under tidal waters Ono OO Yes
¢ — Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot Lino (Yes

¢ Constructing an artificial waterway that Is a canal, associated with reconfiguring a [CnNo Des
lota

¢ — Constructing an artificial waterway not associated with reconfiguring a lot on land, other than Ono (1 Yes
State coastal !and, above high-water if the maximum surface area of water on the waterway
is at least §,000m2

* — Constructing a bank or bund wall to establish a ponded pasture on land, other than State Ono Yes
coastal land, above high-water mark

« — Removing or interfering with coastal dunes on land, other than State coastal land, that is in CINo (Yes
an erosion prone area and above high-water mark

If yes to one or more, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?

{J No - (Complete Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. If yes, above, to any
shown bold and marked with the symbol 4, the application also requires essessment by Queensland Transport (Marine
Safety Qld) as Concurrence Agency.

OJ Yes
{f yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

{7 Yes - Unless the application is consistent with any property development plan applying fo the land, the Assessment
Manager must refuse to receive it (Complete Part M) This application requires assessment by the Environmentat
Protection Agency (EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction
as concurrence Agency. If yes, above, to any shown bold and marked with the symbol ©, the application also
requires assessment by Queensland Transport (Marine Safely Qld) as Concurrence Agency. Subject fo the
declaration for the relevant wild river area, the application also requires assessment for the purposes of the Wild
Rivers Act 2005.

OO No-An application for the operational work would be taken to be not properly made and the Assessment Manager
must refuse to receive it.

 

 

 

Page 48

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfisi, Version 21.0, 3 September 2007
WATERWAY BARRIER WORKS; WILD RIVER AREA

4.12 rere the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No
O Yes

If yes, is any of the proposed operational work fo be carried out in a wild river area declared under the Wild Rivers Act

 

 

2005?
0 No

If no, is all of the operational work for constructing or raising waterway barrier works -
intended to exist for no more than 28 days; and
built or raised in freshwater; and

e
e
¢ no more than 20m in length and no more than 3m in height from the lowest point on the stream bed?
( Yes
CI No

If no, is all of the operational work for constructing or raising waterway barrier works -
¢ more than 100km from the coastline; and

e inthe smallest unbranched tributary of a catchment or a stream into which that tributary flows

C1 Yes

C1 No- (Complete Part Os) This application requires assessment by the Department of Primary Industries and Fisheries

(OPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.

OO Yes

\f yes, is any of the proposed operational work to be carried out in a wild river high preservation area?

i] No ~ Unless the application is consistent with any property development plan applying to the fand, the Assessment Manager
must refuse to receive it (Complete Part O.) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F). and, subject to the declaration for the relevant wild river area, assessment for the

purposes of the Wild Rivers Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

oC Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager must
refuse to receive it.

 

 

 

 

 

Page 49

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

 

413

 

 

 

 

ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994
no —
0 Yes
If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)

« — The maintenance of existing structures, including for example the following structures, []No {(] Yes
if the structures were constructed in compliance with all the requirements, under any
Act, relating to a structure of that type -—

+ — Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming

enclosures and weirs;
« — Existing powerlines or associated powerline infrastructure
e Educational or research purposes relating to the fish habitat area C1No (1 Yes
* — Monitoring the impact of development on the declared fish habitat area Ono (Yes
© — Other purposes (No (1 Yes

If yes to “other purposes”, is that proposed operational work to be carried out in a wild river area declared under
the Wild Rivers Act 2005?

OO No- {Complete Part Oz} This application requires assessment by the Department of Primary Industries and Fisheries ~~
(DPI&F). If DPI&F is not the Assessment Manager for the application, the agency will have jurisdiction as
Concurrence Agency.

Ol Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

oO Yes — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment
by the Department of Primary Industries and Fisheries (DPI&F) and assessment for the purposes of the
Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

O No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?

| No — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Pert O2) This application requires
assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.
If DPI&F is nat the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

An application for the operational work would be taken to be not properly made and the assessment
manager must refuse to receive the application.

 

 

Page 50

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

 

4.14

 

 

 

ne the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No
OO Yes See

{f yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box’es)

« The removal, destruction or damage of dead marine wood on unallocated State fand, CONo [7 Yes
other than in a wild river area, for trade or commerce

* The maintenance of existing structures, including, for example, the following (No LO) Yes
structures, if the structures were constructed in compliance with all the requirements,
under any Act, relating to a structure of that type —

* boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;

« — existing drainage structures;
« — existing powerlines or associated powerline infrastructure

¢ — For educational or research purposes or for the monitoring the impact of development C)No (1) Yes
on marine plants

© — Other purposes (JNo () Yes

If yes to “other purposes”, is that proposed operational work to be carried out in a wild river area declared under
the Wild River Act 2005?

C1 __No- (Complete Part O2) This application requires assessment by the Department of Primary Industries and Fisheries
{OPI&F). If DPI&F is not the Assessment Manager for the application, the agency has Jurisiction as Concurrence
Agency.

OO Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

(C1 Yes - Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment
by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the
relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005, if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

OO No

If no, is all of the proposed operational work necessary and unavoidable part of installing or
maintaining works or infrastructure required to support other development for which a development

permit is not required or, if a development permit is required, the permit is held or has been applied
for?

O Yes ~ Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part Oz) This application requires
assessment by the Department of Primary industries and Fisheries (DPI&F) and, subject to the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.
If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

(0 __No- An application for the operational work would be taken to be not properly made and the Assessment
Manager must refuse to receive il.

 

 

-41- -

Page 51

INTEGRATED PLANNING ACT 1997

 

 

 

 

 

IDAS Assessment Checklist, Version 21.0, 3 September 2007
WILD RIVER AREA
418 coe the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No
£1 Yes .
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to
be assessable?
* Agricultural activities as defined under the Wild Rivers Act 2005 (No (J Yes
* Animal husbandry activities as defined under the Wild Rivers Act 2005 (No 0 Yes

If yes to either, is any part of the premises in the wild river high preservation area?
oO Yes - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse

to receive it.
0 No

If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers
Act 2005?

i) Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager
must refuse to receive it.

oO No - Unless the application is consistent with any property development plan applying to the land. the Assessment
Manager must refuse to receive it (Complete Part Q if agricutture. Complete Part R if anima! husbandry) Subject to
the declaration for the relevant wild river area, this application requires assessment by the Department of Naturat

Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

 

 

-42- ~~

Page 52

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

 

STATE-CONTROLLED ROAD
4.16 ||s any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No
CI) Yes : _
If yes, is what the proposed operational work is associated with (Tick applicable box/es}
e Araterial change of use that is assessable under the planning scheme LC No 0 Yes
¢ — Reconfiguring a lot that does not increase the total number of lots and does not mn) O Yes
increase the total number of lots abutting the State-controlled road
© Other 0 No OD Yes

WP Reguimo schedule 2 takie 2 em 3

if yes to “other”, and answers to questions in this section of the checklist indicate the proposed operational work is assessable
under IPA, schedule 8 - Answer (a) fo (c) below

(a) Is any of the proposed operational work associated with access to a State-controlled road?
No
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) 1s any of the proposed operational work for filling or excavation?
0 No
OO Yes
{f yes, is the operational work proposed in a future State-controlled road defined by route?
{]_No- This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
(1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?

0 No
1 Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?

(1 __No- This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
Oo Yes - This application must be referred lo the Department of Main Roads (DMR) as Concurrence Agency.

 

 

 

Page 53

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

S EC Tl 0 N 5 The following question only applies when the application is seeking approval to carry out buifding work to the

extent the work is in a declared fish habitat area.

 

 

 

DECLARED FISH HABITAT AREA soo
5.1 | |s the-Proposed building work in a declared fish habitat area under the Fisheries Act 1994?
No
CO Yes

 

 

If yes, indicate what the proposed building work is reasonably necessary for (Tick applicable boxes)

« — The maintenance of existing structures, including for example the following structures, No [Yes
if the structures were constructed in compliance with all the requirements, under any
Act, relating to a structure of that type -

+» Boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;

+» — Existing powerlines or associated powerline infrastructure

« Educational or research purposes relating to the fish habitat area Ono (CL) Yes
* — Monitoring the impact of development on the declared fish habitat area Ono (Yes
© — Other purposes Ono OYes

Ifyes to “other purposes", is the proposed building work to be carried out in a wild river area declared under the Wild River
Act 2005?

(No - (Comptete Part Oz) This application requires assessment by the Department of Primary industries and Fisheries
(DPI8F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
O1 Yes
If yes, is all of the building work for specified works under the Wild Rivers Act 2005?

oO Yes - Unless the application is consistent with any property development plan applying to the land, the assessment
manager must refuse to receive it. (Complete Part O2) This application requires assessment by the Department
of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area,
assessment for the purposes of the Wild Rivers Act. if DPI&F is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency.

0 No
If no, is any of the proposed building work to be carried out in a wild river high preservation area?

(11 No - Unless the application is consistent with any properly development plan applying to the land, the
assessment manager must refuse to receive it. (Complete Part Oz) This application requires assessment
by the Department of Primary industries and Fisheries (DPI&F) and, subject to the dectaration for the
relevant wild river area, assessment for (ha purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(1 Yes - An application for ihe building work would be taken to be not properly made and the assessment manager
must refuse to receive it,

 

 

744+

Page 54

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

S ECTIO N 6 Section 6 must be completed for all application requiring completion of the IDAS Assessment Checklist.

The following questions relate to whether a referral agency response has been received prior to making an
application.

 

PRE APPLICATION REFERRAL AGENCY RESPONSE
6.1 ng received a referral agency response under s 3.3.2. of IPA, in relation to this development, which includes a statement
th

 

e referral agency does not require referral of the application during the IDAS referral stage?

 

No
[Yes ~ (Complete Tabie A)
TABLE A
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS HAVE YOU SATISFIED ANY CONDITIONS
BEEN RECEIVED UNDER IPA $3.2.2 - Jist a separate matter in each row STATED iN THE RESPONSE?

 

OJ Yes {CJ No | (} Noconditions

 

(1D Yes | CI No | (J Noconditions

 

CI Yes OO No | DD Noconditions

 

O Yes | No | O Noconditions

 

DO Yes } C1) No | (J Noconditions

 

(J Yes CJ No | CD Noconditions

 

OJ Yes { C1 No | 0 Noconditions

 

 

 

 

 

 

If 'yes' for any of the referral matters listed in Table A - a referral for this matter is not required, and the relevant Part identified in the IDAS
Assessment Checklist is not required to be completed. A copy of the referral agency response and evidence of how you
have satisfied any conditions stated in the response must be attached to your application.

If 'no' for any of the referral matters listed in Table A - the retevant Part identified in the IDAS Assessment Checklist is required to be completed.
The application must be referred to the relevant referral agency, unless the referral agency is the Assessment Manager.

 

 

 

 

-45-

Page 55

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

APPENDIX 4

Below is a list of the referrals triggered under the Integrated Planning Regulation 1998, schedule 2 that can apply to an application for
building work assessable against the Building Act 1975. This appendix is provided for advice only.

This appendix is not required to be completed and lodged where an application involves building work made assessable under the
integrated Planning Act 1997, schedule 8 for assessment against the Building Act 1975 only.

Special fire services - generally | 4.

 

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the

 

 

 

 

Forze ictarmation yo wachede building work requires special fire services mentioned in schedule 2A part 1 of the Integrated
Regutation. ~ Planning Regulation 4998 (IP Regulation) or includes an alternative solution assessed against the
Assessment period 15 days. No performance requirements of the Building Code of Australia.

response is a deemed refusal.

Fire safety for budget 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the
Fos more information go to schedule building work the subject of the application requires the installation of a fire safety system for a

2 of the IP Regutation budget accommodation building.

Spey printing © 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence
2of the IP Remulston agency if the application involves a workplace incorporating spray painting.

aoe eaten toschedule 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application
2of the [P Reaulation involves a retail meat premises.

Private heatth tacit icati ‘i i
forme oration polo schela 5. An application may trigger referral to the Department of Health as a concurrence agency if the

2of the IP Regulation . application involves a private health facility.

Workpl less than 2.3m? icati it i it i
Fer mire inferatin o to schedule 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice

 

 

 

 

 

 

 

2of the IP Requlation agency if the application involves a work place area less that 2.3m2.

Land coniiguows toa State- 7. An application may trigger referral to the Department of Main Roads as a concurrence agency or
Far more information goto schedule | ° advice agency if the application involves land contiguous to a State-controlled road.

2 of the IP Requlation

Pastoral workers accommodation | 8, An application may trigger referral to the Department of Industria! Relation ncurren
Petit vir aaletaal agerey ithe applealn involves pastoral workers accommodation. ators (DIR) as aconcurence
Child care centre , An application may trigger referral to the Dr nt of Communities as a concurrence agency if the
Delta te Remar” stews ° application involves a childcare centre. Ppariment of Co eee
Formers niereptee go toschecule 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence
2ol the {P Reaulation agency if the application involves land completely or partly seaward of a coastal building lines.
Halon of land use and public | 44, An application may trigger referral to Queensland Transport as a concurrence agency if the

For mace information go to schedule application involves existing or future public transport corridors, or airport operational airspace’.

Zot the IP Regulation .

Railway safety and efficiency 12, An application may trigger referral to Queensland Transport as a concurrence agency if the

For more information go to schedule

2 ol the IP Reavlation application involves future railway land.

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS .
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed time. For applications relating to
design and siting (17, 18 & 19), and bulking work for removal or rebuilding (23), the assessment period is § days. For all other applications the assessment period is 15 days. If no
response is received trom the local government for an application, it is taken to be a deemed refusal, However for amenity and aesthetics impact of particular building work for a single
detached class 1a or class 10 building or structure {15}, no response is taken to be a deemed approval.

‘Amenity and aesthetic Impact of atian will tri thie
particular building work for single 13. An application will trigger a referral to the local government if it is :

detached class 1 building or class ¢ forasingle detached class 1 building or class 10 structure; and

 

 

 

 

 

40 bullding or structure the local government has declared by resolution the following:

sume tates 90 to schedule — the appearance of the building or structure will have an extremely adverse impact on the

Assessment period 15 days, No amenity of the locality; and

response is a deemed approval ~ the appearance of the building or structure would be in extreme conflict with the character of
- the locality. : .

 

5 Coasta! building lines are prescribed under the Coastal Protection and Managem ent Act 1995.
_._... Operational airspace is as de fined under State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities”.

-46-

Page 56

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

 

 

 

 

rebuilding
For more information go to schedule
2 table 4 of the IP Regulation.

Assessment period 5 days. No
response is a deemed refusal,

Creer a eaeinas may 114. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may

purposes trigger a referral to the focal government as the concurrence agency.

For more information go to schedule ‘

2 table 1 of the IP Regulation,

Assessment period 15 days. No —— — —- -~———|

fesponse is a deemed refusal. .

Design and siting 15. An application may trigger referral to the local government as the concurrence agency if the building

edict dkarheaa 90 te schedule work does not comply with the performance criteria of parts 11 and 12 of the Queensland

Assessment period § days. No Development Code.

response is a deemed refusal. 16. An application may trigger referral to the local government as the concurrence agency if the building
work does not comply with the qualitative statement for building clearance and site cover.

17. An application may trigger referral to the local government as the concurrence agency if the building

work does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the
Queensland Development Code, part 11 or 12.

a tans ee 18. An application may trigger referral to the local government as the concurrence agency to determine

For more information goto schedule the building will comply with the fire safety standard under the Building Act 1975 when the building

2 table 1 of the IP Regulation, work has been completed.

Assessment period 15 days. No

response is 3 deemed refusal,

tigher Ask personal appearance 149 An application may trigger referral to the local government as the concurrence agency to determine

For more inlormation go to schedule ifthe building work

2 table 1 of the IP Requilation and * — complies with the performance criteria of the Queensland Development Code, part 15; and

the QDC pat 15. © — the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No

response is a deemed refusall.

Burcing work for residentlat 20. An application for building work for premises in which residential care service under the Residential

Fox more infomation go to schedule Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will

2 table 1 of the IP Regulation and trigger referral to the local government as the concurrence agency.

the QDC part 20.

Assessment period 15 days. No

response is a deemed refusal. .

Building work for removal or 21. An application for the removal and/or rebuilding at another site of a building or other structure, will

trigger referral to the local government as the concurrence agency.

 

Building work for rainwater tank
tn designated rainwater tank area
For more information go to schedule
2 table 1 of the IP Requiation and
the QDC part 25.

Assessment period 15 days. No
rasponse is a deemed refusal.

 

22.

 

An application may trigger referral to the loca! government as the concurrence agency to determine

if the building work or structure complies with the relevant performance criteria if -

© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of
relevant building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an
acceptable solution for a relevant performance criterion.

 

 

Disclaimer:

 

While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained
on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on
the information without first making your own enquiries regarding the interpretation and application of the applicable fegislation
to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for;
errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may
arise from your reliance on this process and the information contained on this form.

 

-47-

 

Page 57

 

a T { 5 4 Easton Street, Maroochydore QLD 4558
Telephone (07) 5443 6585 Facsimile (07) 5479 1754

Postal Address PO Box 5960 Maroochydore BC QLD 4558
E-mail [email protected]

CONSULTING
ENGINEERS

 

"GEOTECHNICAL & SITE INVESTIGATION
REPORT"

CLIENT: KJ CONSTRUCTIONS

SITE ADDRESS:
LOT2 1 & 2 #23 EDWARD STREET
NOOSAVILLE - QLD

JOB No.: 207196

DATE: 03/12/07

Civil & Structural + Design & Drafting + Residential « Commercial ¢ Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 $35 trading as JTC Consulting Engineers

Page 58

JTC

CONSULTING
ENGINEERS

TABLE of CONTENTS

1.00 INTRODUCTION
1.01 COMMISSION
1.02 AIM

1,03 PROPOSED CONSTRUCTION

2.00 FIELDWORK
2.01 SITE DESCRIPTION

2.02 TEST HOLE DRILLING

3.00 GEOLOGY & LABORATORY TESTING
3.01 SUB-SURFACE CONDITIONS
3.02 ALLOWABLE BEARING CAPACITY

3.03 SITE CLASSIFICATION

4.00 ENGINEERING ASSESSMENT & RECOMMENDATIONS
4.01 FOOTING DESIGN

4.02 SITE PREPARATION

5.00 NOTES
5.01 SOIL MOISTURE VARIATION IN SUB SOILS
5.02 NON STRUCTURAL DISTRESS
APPENDICES

APPENDIX A EARTHWORKS APPENDIX B DRAINAGE CSIRO Sheet Nos.10-91

Civil & Structural ¢ Design & Drafting « Residential ¢ Commercial ¢ Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Page 59

JTC

CONSULTING
ENGINEERS

1.00 INTRODUCTION
1.01 COMMISSION

An on-site Geotechnical Investigation was carried out at #23 Edward Street, Noosaville on
October 16” 2007, at the request of the owner of the property Mr John Wentzel.

1.02 AIM

The aim of the investigation was to determine the sub-surface profile and the condition of the in
situ soils, to classify the site in accordance with AS2870-1996 "Residential Slabs and Footings",
and to advise on an appropriate foundation system for the proposed construction.

1.03 PROPOSED CONSTRUCTION

The proposed method of construction is a two storey slab on ground, concrete block duplex with
a suspended concrete floor and custom orb metal roof.

2.00 FIELDWORK
2.01 SITE DESCRIPTION - TOPOGRAPHY

The allotment is described as Lots 1 & 2 on RP 81559 Parish of Noosa, County of March with
and area of 613sqm. The site had an existing low set timber clad, slab on ground residence. The
surrounding surface was flat with a covering of lawn grasses and gardens with some palm trees.
Drainage would be classed as poor.

2.02 TEST HOLE DRILLING

Due to access restrictions over the site One (1) Bore Hole was dug within the confines of the lot
with a drill rig mounted on a four wheel drive vehicle at the location indicated on the attached
site sketch.

Dynamic Cone Penetrometer tests were carried out adjacent to the borehole and at four (3) other
locations. All aspects of the investigation were conducted in accordance with AS1726-1981 "Site
Investigation Code".

BORE HOLE DEPTH COMMENT

1 4.4m Bore hole terminated.

Civil & Structural ¢ Design & Drafting « Residential ¢ Commercial ¢ Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consuiting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Page 60

JTC

CONSULTING
ENGINEERS

3.00 GEOLOGY & LABORATORY TESTING
3.01 SUBSURFACE CONDITIONS

The sub-surface profile at borehole 1 located 7m from the front boundary and 1.5m from the
RHS northern boundary indicated 0.70m of very loose grey/yellow grading to white Sand
overlying a thin layer of black Silty Sand between 0.70-0.95m depth. Below 0.95m the naturally
occurring Sand was loose to medium dense with depth. Between 3.3-4.1m the Sand was weakly
cemented and dense/very dense. Below 4.10m depth loose “marine” Clayey Sand was logged to
termination depth at 4.4m.

3.02 ALLOWABLE BEARING CAPACITY

Based on drilling rates and with reference to the Dynamic Cone Penetrometer tests a safe
presumptive bearing capacity in excess of 100kPa would be available within the medium dense
Sand below 1.0m depth.

3.03 SITE CLASSIFICATION

Based on the findings of the Site Investigation and in accordance with Australian Standard
AS2870-1990 "RESIDENTIAL SLABS & FOOTINGS" the site may be classified as: "P"

The “P” classification is attracted due to the presence of up to 0.7m of loose Sand Fill located
over the naturally occurring Sand.

4.00 ENGINEERING ASSESSMENT & RECOMMENDATIONS
4.01 FOOTING DESIGN

Based on the above we would recommend that all load bearing footings and slab on ground be
supported on a grid of either 450 dia bored concrete piers, 600 long backhoe piers or steel screw
piers found to a minimum depth of 1.2m below the existing surface level into the medium dense
Sand.

4.02 SITE PREPARATION

The confines of the building site shall be stripped of all topsoil containing vegetable and other
organic materials.

On sites where cutting and filling is to be executed the fill material and also the top 150mm of
natural material in the cut section shall be compacted in accordance with AS2870-1990
SECTION 6 Construction requirements as follows.

Civil & Structural ¢ Design & Drafting « Residential ¢ Commercial « Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Page 61

JTC

CONSULTING
ENGINEERS

(a) SANDS

Density index of not less than 65% according to as 1289.E6.1 where compaction test is in
accordance with AS1289.E5.1. Alternatively a satisfactory blow count of 7 or more per 300mm
when tested in situ with a penetrometer to AS1289.F3.3. may be used.

(b) CLAYS

Dry density ratio according to AS1289.E4.1 of not less than 95% where the compaction test is in
accordance with AS1289.E1.1. (standard) or 90% in accordance with AS1289.E2.1 (modified).

Clay fill should be moist to allow compaction and reduce subsequent movement.
5.00 NOTES - SITE MANAGEMENT
5.01 SOIL MOISTURE VARIATION IN SUB SOILS

Differential moisture under a structure due to extremes of wetting or drying is the major cause of
movement in clay sites.

To ensure the natural moisture content of the soil remains reasonably stable, gardens, trees,
shrubs, hose points, and septic tanks should not be located within 3m of the residence.

All downpipes should either be discharged directly into the street stormwater system via
underground drainage or to spitters discharging a minimum of 3m away from footings..

Our recommended drainage requirements for residential construction are shown on Appendix A
attached hereto.

Reference should also be made to the "Guide to Home Owners on Foundation Maintenance and
Footing Performance" published by the C.S.ILR.O which forms part of this report.

5.02 NON STRUCTURAL DISTRESS

There are many factors that affect the performance of a structure. The two (2) most commonly
occurring forms of house distress resulting from non-structural causes which are.

1. Direct tension slab cracking due to concrete shrinkage.
2. Growth cracking of brickwork.

Concrete shrinkage is resisted by the restraint imposed by the beam embedment into the soil and
the steel reinforcement.

Civil & Structural + Design & Drafting « Residential ¢ Commercial ¢ Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Page 62

JTC

"1

CONSULTING
ENGINEERS

This restraint induces tensile stress in the concrete and since concrete has low tensile strength
coarse cracking commonly occurs. This type of cracking does not affect the structural integrity
of the slab and footing system.

Brick growth causes minor vertical cracking generally near the corners of houses. It is caused by
the absorption of moisture into the brick structure. This absorption of moisture generally leads
to expansion and cracking can occur.

We thank you for the opportunity to be of assistance to you on this occasion.

Should you require any further information or assistance, please do not hesitate to contact this
office.

Yours faithfully,

 
    

TITMUS ENGINEER R.P.E.Q.No.4092

Encl: C.S.1.R.O. Information Sheet 10-91
Appendix A , Appendix B

Civil & Structural ¢ Design & Drafting « Residential ¢ Commercial ¢ Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Page 63

Shop !, Cnr Broadmeadows Road and Ann-

Geo Investigations Pty Ltd Marie Close

= Maroochydore QLD 4558

<2 —_== . : i Phone: (07) 5443 6988
Geotechnical Consultants in the Earth Sciences

INVESTIGATIONS Fax: (07) 5479 1899

ABN 46724001 176
Email [email protected]

  

Field Investigation Report

 

Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158
Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref:
Investigator: GWS

Bore Method: Rig. WindLoad: N3 Visit Date/s: 16/10/2007
SITE CONDITIONS:

Vegetation: Grasses, gardens, palm trees.

Crossfall: 0.2 metres over allotment.

Drainage: Front right hand (northeast). Poor.

Adjacent Construction: Existing lowset timber clad. SOG. WaterTable: 1.6 metres

Remarks:

Access over allotment restricted by existing structures. Single borehole (drilling rig) and four dynamic cone
penetrometer tests advanced. Regionally the allotment is located to the south of Noosa River and represents a
remnant esturine plain. Typically the soil profile represents the historical migration and varying flow rate of the
Noosa River. The borehole revealed weak sand cementation from 3.3 metres to 4.1 metres. Dynamic cone
penetrometer test confirmed cementation in DCP 3 and DCP4 but not at DCP2.

The allotment has a minor sandy fill veneer (0.4 metres) with esturine sands underlying. Sands below the
cemented zone appear to be “marine” in origin. Sands below 0.7/1.0 metres are medium dense and 100kPa
bearing capacity values, however values reduce below the water table (1.6 metres). Photographs attached.

Wednesday, 24 October 2007 Page 1 of 5

Page 64

Field Investigation Report cont'd

 

 

 

 

 

 

 

 

Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158
Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref:

DCP Values Bore No.: 1

per 100mm : : .
0141212 Location: 7 metre front boundary. 1.5 right hand (northern) side boundary.
0.2 112.2 1 |Depth Description Symbol Comments
0.3.1 1/23 2 400 FILL SAND fine-coarse sands, grey/grey yellow/yellow brown, some Sw
041/244 clay, trace fine gravel/silt, moist, loose.
05 04/2517 700 FILL SAND fine sands, white, moist, very loose. SP
06 1 126 2 950 Silty CLAY low-medium plasticity, black, with fine sand, moist, cL
0.7 0 (2.7 2 firm.
08 1/128 2 1500 SAND fine-medium sands, light grey yellow/It grey yellow brown, SP
09 3 129 2 trace clay, moist/wet, medium dense.
10 3 (30 3 3000 SAND fine-medium sands, grey/light grey, trace clay/silt, wet, SP Cave-in: 1.6m, Water
loose/medium dense. level 1.6m
1.1 4 13.1 7
12 4/1328 3300 SAND fine-medium sands, grey, some clay/silt, lenses of shell SP
pieces, wet, loose.

@; (23.17
14 3134 4100 SAND fine-medium sands, dark brown, trace clay, wet, SP

. . dense/very dense, weak cementation.
15.2 13.5
16 2136 4400 Clayey SAND fine sands, dark grey, with silt, lenses of shell sc END

. . pieces, wet, loose, marine.
1.7 2 |3.7
18 2 (38
19 3 139
2.0 3 }4.0

DCP Values Bore No.: 2

per 100mm . . '
01 11212 Location: 5 metres rear boundary. 1.5 metres right hand (northern) side boundary.
0.2 1 42.2 2
03 1 42.3 2
04 1 42.4 2 '
@ 1425 2
1/26 2

0.7 1:12.72
0.8 1/28 3
09 1/29 3
10 2 |3.0 3
1.1 3 13.1 3
1.2 3 |3.2 3
13 3 1/33 2
14 3 |3.4 3
15 2 (3.5 3
16 2 /36
17 2 13.7
18 2 (38
19 2 13.9
2.0 2 140

 

 

 

 

Wednesday, 24 October 2007

Page 2 of 5

Page 65

Field Investigation Report cont'd

 

Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158
Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref:

 

OCP Values Bore No.: 3

 

0 eee 2 Location: 7.5 metres front boundary. 1.5 metres left hand (southern) side boundary.
0.2 1 122 2
0.31 12.3 2
0.4 3 124 2
05 3 (25 2
06 1 126 2
0.7 2 [2.7 2
08 3 (2.8 2
09 3 129 3
10 3 |3.0 2
1.1. 3 13.1 3
1.2 3 132 5

5 133 7
14 5 [3.4 18
15 3 13.5
16 4 (36
41.7 3 13.7
18 3 138
19 3 139

2 |40

 

DCP Values Bore No.: 4

 

 

 

 

 

0 et 3 Location: 5 metres rear boundary. 1.5 left hand (southern) side boundary.
0.2 14 42.2 2
03 4 42.3 2
04 4 424 2
0 142.5 1
a. 2.6 1
0.7 1 :42.7 2
08 2 128 2
09 3 12.9 2
10 4 |30 2
1.1 5 [3.1 2
1.2 3 132 5
1.3 3 133 9
14 3 |3.4 10
15 3 |3.5 19
16 2 136
1.7 3 |37
418 2 138
19 3 13.9
2.0 3 14.0
Wednesday, 24 October 2007 Page 3 of 5

i 2.0

Page 66

Field Investigation Report cont'd

i Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158
Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref:

 

 

NOTES ON REPORT DOCUMENT

(i) The report was prepared for a specific purpose and as directed by the client.

(ii) It should be acknowledged that soil investigations identify actual sub-surface conditions only at
those points where and when samples are taken. Data derived through sampling and/or
subsequent testing are extrapolated to render an opinion about overall sub-surface conditions.
Even under optimal circumstances, actual conditions may differ from those inferred to exist,
because no consultant, no matter how qualified, and no sub-surface exploration programme, no
matter how comprehensive can reveal what is hidden by earth, rock and time. The actual
interface between materials may be far more gradual or abrupt than our report indicates. Actual
conditions in areas not sampled may differ from our predictions.

(iii) Interpretation of soil/rock strength terms should refer to our “Glossary of Terms”.

@ (iv) The soil depth referenced in our borelog information profile, represents the "end" depth of each
soil type.

 

 

 

Wednesday, 24 October 2007 Page 4 of §

Page 67

Field Investigation Report cont'd

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158
Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref:
GLOSSARY OF TERMS
CONSISTENCY OF COHESIVE SOILS
Unconfined SPT
Description Compressive Strength “N" val
(kPa) value

SOFT 0-35 0-4
FIRM 35 - 90 4-8

STIFF 90 - 225 8-15

VERY STIFF 225 - 500 15 - 30

@ HARD 500 - 700 30 - 50

!
WEAK ROCK > 900 > 50
CONSISTENCY OF NON-COHESIVE/ GRANULAR SOILS
sat Dry Density SPT
Description (tim3) oN" value

VERY LOOSE < 1.450 0-4

LOOSE 1.450 - 1.600 4-10

MEDIUM DENSE 1.600 - 1.750 10 - 30

DENSE 1.750 - 1.950 30 - 50
VERY DENSE > 1.950 > 50

 

 

 

CONSISTENCY OF CEMENTED SOILS

 

 

 

 

 

Unconfined
Description Compressive Strength
(kPa)
WEAKLY 300 - 1500
MODERATELY 1500 - 3500
STRONGLY > 3500

 

 

 

 

 

Wednesday, 24 October 2007

Page 5 of 5

Page 68

L SiS

AND ANN-MAREE CLOSE

MAROOCHYDORE QLD 4558

RBraxK Ao

wezgoz wiizpoe) opozz

 

 

 

GEO-INVESTIGATIONS PTY LTD
SHOP 1, CNR BROADMEADOWS ROAD

£ 200

 

10.059 m

sence |

 

1aq0" /

:
3

4+
4 wvee | |

 

 

 

 

 
 

 

 

 

 

 

 

 

 

SiTeE PLAn)

 

wm 10.059m

 

 

 

 

 

 

x ‘ Porn aa . Tt
; !
4 j 4-~
i RTI
: 3 1\\ {{t
' Cc _ ry !
' 4 iF= ee | !
Wh oo A ay {if
‘ io > Yaly
| iy Leen woes ul
’ -_—
t ec
pra t ---4—5 //]
i Fee : Yee rt
‘ 1 1s on ae
UL ERT
: 1 ih
‘ 7 c “J

 

 

 

:
tZ

 

 

 

 

 

 

 

 

 

 

 

ROAD

Page 69

Tee Are

a

 

 

Page 70

 

 

CONSULTING ENGINEERS 108 No. DMG No.| ISSUE
- 4 Easton Street (Cnr Maud Street), Maroochydore OLD 4558, APPENDIX A | APPA | _A

 

 

Telephone (07) 5443 6585 Facsimile (07) 5479 1754 IDRAWN |SCALE |DATE
Postal Address PO Box 5960 Maroochydore BC OLD 4558 | JTT | NTS.) SEPT 98”
JOB

APPENDIX A RESIDENTIAL FOUNDATION DESIGN

 

 

 

 

 

 

 

 

CONCRETE SPOON DRAIN 7

 
   
  

 

 

 

 

 

OR GRASSED VEE DRAIN !~
120 120
MIN FALL MIN FALL
—. —~<—
Lj ~~ &
GRop s
NN TR Fee Fe _ ce
AG PIPE & RUBBLE ATION REMOVAy—~
DRAIN REFER NOTE 2

 

RETAINING WALLS GENERALLY REQUIRED
WHERE BATTERS EXCEED A MAXIMUM FALL
OF 2 INS.

RETAINING WALLS GENERALLY REQUIRED

IF PLATFORM CANNOT EXTEND S x FILL DEPTH
FROM FOOTING LINE.

(ENGINEER DESIGN RECOMMENDED)

NOTE:
“MBD* - DENOTES MINIMUM BATTER DISTANCE
REFER TO LOCAL AUTHORITY REQUIREMENTS
FOR MINIMUM BATTER DISTANCE FROM BOUNDARY

NOTES:

1. ALL TOPSOIL CONTAINING VEGETATION AND ORGANIC MATERIAL IS TO
BE STRIPPED FROM THE CONFINES OF THE CONSTRUCTION SITE.
THE FILL MATERIAL AND THE TOP 150mm OF NATURAL MATERIAL IN ANY
CUT SECTIONS ARE TO BE COMPACTED (IN LAYERS FOR FILL MATERIAL)
TO ATTAIN A UNIFORM FIELD DENSITY OF 95% OF ITS RELATIVE DRY DENSITY.
THIS DEGREE OF COMPACTION IS TO BE VERIFIED USING A COMPACTION TEST.

THE COMPACTION TESTING IS TO BE IN ACCORDANCE WITH TEST No. El.1, E3.1, E4.1 AS1289-199}
(STANDARD) ,

2. IF GROUNDWATER 1S ENCOUNTERED OR THE SITE IS KNOWN TO HAVE A HISTORY OF

GROUND WATER PROBLEMS, A SUB-SURFACE RUBBLE DRAIN WITH SLOTTED AGRICULTURAL
PIPE WILL BE REQUIRED.
THE DRAIN IS TO HAVE A MINIMUM DEPTH OF 1200mm OR TO THE MAXIMUM DEPTH OF FILL.
5. BUILDING PLATFORM TO FALL AWAY FROM HOUSE AT 1 IN 20 MINIMUM, IF FALL

IS TO BE ACHIEVED BY PLACING TOPSOIL AFTER THE FOOTINGS ARE CONSTRUCTED.
OVER EXCAVATE THESE AREAS AS REQUIRED TO COMPLY WITH LOCAL AUTHORITY
REQUIREMENTS REGARDING DIFFERENCE BETWEEN SLAB HEIGHT AND FINISHED GROUND LEVEL
(GENERALLY 225mm MINIMUM)

DRAINAGE ON FLAT SITES TO BE ACHIEVED BY INCREASING SLAB LIFT OR USING IMPORTED FILL
PLATFORMS.

4. DISCHARGE DOWNPIPES VIA BUBBLERS AWAY FROM FOOTING.

 

5. REFER CSIRO INFORMATION PAMPHLET 10-91 FOR SITE FOUNDATION MAINTENANCE.

1200 1200 "BD"

  

PROPERTY BOUNDARY

 

Page 71

 

 

CONSULTING ENGINEERS JOB No.

}¢ Easton Street (Cnr Maud Street), Maroochydore QLD 4558\4°PENDIXB | APPB| A
Telephone (07) $443 6585 Facsimile (07) 5479 1754
Postal Address PO Box 5960 Maroochydore BC QLD 4558 | JIT |NTS| SEPT 98"

DWG No.| ISSUE

 

 

DRAWN |SCALE |DATE

 

 

 

 

 

APPENDIX B RESIDENTIAL FOUNDATION DESIGN

 

 

| !

 

 

|
r — eee YEE DRAIN
|

 

LF

 

 

 

 

 

 

 

 

 

o “| [o™
any
it y

DRAINAGE LAYOUT - CUT & FILL SITE

 

 

GROUND

 

 

 

 

FALL |
6%
|

s

&

 

 

 

 

 

 

 

 

 

 

CONCRETE SPOON DRAIN

 

FALL GRASSED VEE DRAIN
AT 11N 80 MINIMUM

 

VEE DRAIN SECTION

 

Page 72

Foundation Maintenance cee i -

Sheet 10/91

and Footing Performance: “"
A Homeowner's Guide Intormaton

Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause

the homeowner to identify the soil type in order to ascertain the measures that should be put in place in order to.
ensure that problems in the foundation soil can be prevented, thus protecting against building movement.

This Building Technology File is designed to identify causes of soil-related ‘building movement, and to suggest.
.Methods-of prevention of resultant cracking in buildings. . So, ss

  

! Types ce Erosion . .

cries beers . Ad soils are prone to erosion, but sandy soi] is particularly susceptible

The types of soils usually present under the topsoil in land zoned for to being washed away. Even clay with a sand component of say 10%
_tesidential buildings canbe split into two.approximate groups — Or more can suffer from erosion. :

"granular and ¢lay. Quite often, foundation soil is a. mixture of both
types. The general problems associated with soils having granular

is

 

Saturation ; .

This.is particularly a problem in clay soils. Saturation creates a bog-
like suspension of the soi! that causes it to lose virtually all of its
bearing capacity. To a lesser degree, sand is affected by saturation,
application to the local authority, but these are sometimes unreliable « Nag anurated sand may undergo a reduction in volume ~

saturation and sweéll/shrink problems,
Classifications for a given‘area can.generally be obtained by

and if there is doubt, a geotechnical report should. be commissioned.
As most buildings suffering movement problems are founded on clay
soils, there is an emphasis on Classification of soils according to the
amount of swell and shrinkage they experience with variations of
water content. The table below is Table 2.1 from AS 2870, the

e@ content are ‘usually caused by erosion. Clay soils are.subject to
Residential Slab and Footing Code. .

   

' Causes of Movement

There are two types of settlement that occur as a result of

construction: . : :

+ Immediate settlement occurs when a building is first placed on its
foundation. soil, as a-result of compaction of the soil under the
weight of the structure. The cohesive quality of clay soil mitigates

“against this, but granular (particularly sandy) soil is susceptible, .

. Consolidation settlement is a feature of. clay soi) and may:take _
place because of the expulsion of moisture from the soil or because
of the soil’s lack of resistance to local compressive or shear stresses.

- This will usually take place during the first few months after
construction, but has been known to take many years in

Orn cases, .

ese Problems are the province of the builder and should be taken
into consideration as part of the Preparation of the site for construc-
tion. Building ‘Technology File 19 (BTF 19) deals with these
Problems. : 7,

particularly imported sand fill for bedding and blinding layers.
However, this usuailly occurs as immediate settlement and should
normally be the’ province of the builder, to

Seasonal swelling and shrinkage of soil wt .
All clays react to the presence-of water by slowly absorbing it, making
the soil increase in volume (see table below). The:degree of increase
varies considerably between different clays, as does the degree of
decrease during the subsequent drying out, caused by fair weather

. periods. Because of the low absorption and expulsion rate, this

phenomenon will not usually be noticeable unless there are.
prolonged rainy or dry periods, usually of weeks or months,
depending on the land and soil characteristics, . .

“The swelling of soil creates an upward force on the footings of the.

building, and shrinkage-creates subsidence that takes away the

. Support needed by the footing to retain equilibrium,

Shear failure

' This phenomendn- occurs when the foundation soil does not have

sufficient:strength to support the weight of the footing. There are
two major post-construction causes: . .

* Significant load increase.

* Reduction of lateral support of the soil under the footing due to
erosion or excavation.

“* In clay soil, shear failure can be caused by saturation of the soil

- adjacent to or under the footing.

 

Class : : Foundation

‘(GENERAL DEFINITIONS OF SITE CLASSES

Most sand and rock Sites with little or no ground movement from moisture changes

Slightly reactive clay sites with only slight ground movement from moisture chanyes

Zlol>.

Moderately reactive lay or silt sités, which-can experience moderate ground movement from moisture changes

Highly reactive clay sites, which can experience high ground movement from moisture changes

 

 

Extremely reactive sites, which can experience extreme ground movement from moisture changes
P|. Filled sites 7 a

wile fom |i

 

 

Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils: soils subject
to erosion: reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise .

 

 

i Settlement due to construction

 

 

pe

Page 73

- | Trée root growth .
‘Trees and shrubs that are allowed to grow in the vicinity of footings
. ¢an cause foundation soi] movement in two ways: uo

* Roots that grow- under. footings may increase in cross-sectional -
size, exerting upward pressure on footings. ~ .

* Roots in the vicinity of footings will absorb much of the moisture
in the foundation soil, causing shrinkage or subsidence.

:Unevenness of Movement

 

‘The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of: . .

° Differing compaction of foundation soil prior to construction.
+ Differing moisture content of foundation soil Prior to construction.

Movement due to non-construction causes is usually more uneven
still. Erosion can undermine a footing that traverses the: flow or can
create the conditions for'shear failure by eroding soil adjacent to a
footing that runs in, the same direction as the flow. .

Saturation of clay foundation soil may occur where subfloor walls
create a damn that makes water pond. It can also occur wherever there
is @ source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear
failure. .

the building first, theri gradually spreads to the interior. The swelling

interior soil as absorption continues. Shrinkage usually. begins where _
the sun's heat is greatest. 20 . m

  

of Uneven Soil Movement on Structure:

Ef

 
     

 

 

Erosion and saturation :

subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the gap or cantilevering until the bricks or the’

* Step cracking in the mortar beds in the body of the wall.or. -
above/below openings such as doors or windows, :

* Vertical cracking in the bricks (usually but not necessarily in line
with the vertical beds or perpends). .. es

Isolated piers affected by erosion or saturation of foundations will
wentually lose contact with the bearers they support and may tilt or
ll over. The floors that have lost this support will become bouncy,
sometimes.rattling ornaments etc.

Seasonal swelling/shrinkage in clay . :
Swelling foundation soil due to rainy periods first: lifts the most. -

perimeter footings while
footprint to lift internal
dish effect, because the external footings are pushed higher than the
internal ones, SO mT

The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines. .

‘As the moisture absorption process completes its Joumey to the
innermost areas of the building, the internal footings will rise. If the
spread of moisture is roughly even, it may be that the symptonis will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms, In buildings with timber flooring supported by bearers
and joists, the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of flooring.

gradually permeating inside the building

Seasonal swelling and shrinkage of clay soi) affects the perimeter of |.

process will ‘usually begin at the uphill extreme of the building, or.on-
the weather side where the land is flat. Swelling gradually reaches the -

Erosion removes the support from under footings, tending to create . ©

mortar bedding fail. Older masonry has little resistance. Evidence of |
failure varies according to circumstances and: symptoms may include: . .

. : . _ Effects on full masonry structures. :

" Brickwork -will resist cracking where it-can, It will attempt to span

- vertical member. of.the frame.

footings, This swelling first tends to create a

 

 

 

 

 

 

 

 

Wall cacking pt
dye to.uneven
‘Hooting settiemert '

   

_ As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun’ effect is strongest. This has the effect of lowering the
external footings. The doming is accentuated and cracking reduces

Lor disappears where it occurred becausé of dishing, but other cracks

~ open up. The roof lines may become convex.

Doming and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail,
water migration tends to be toward the interior and doming will be
accentuated, whereas where.summers are dry and winters are cold
. and wet,-migration tends to be toward the exterior and the ~
underlying propensity is toward dishing: _ : .

-Movement caused by tree rots. ae
lh general, growing roots will-exert an upward pressure on footings,
. whereas soil subject to drying because of tree or shrub roots will tend

"to remove support from under footings by iriducing.shririkage.

- Complications caused by the structure itself
. Most forces that-the soil causes to be exerted on structures are

vertical-— i.e. either up or down. However, because these forces are

* seldom spread evenly around the footings, and because the building

resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of all thesé
forces is usually rotational. This resultant force often complicates the
‘diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the

~areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings. for windows or doors. ' ve . .
In the event of construction settlement, cracking will-usually remain
unchanged after the process of settlement has ceased. .
With local shear or erosion, cracking will usually continue to develop
until the original cause has been remedied, or unti] the subsidence

. has completely neutralised the affected portion of footing and the

structure has stabilised‘on other footings that remain effective.

r ; " "In the case of sweli/shrink effects, the brickwork: will in some cases
: exposed extremities of the footing system, then the remainder ofthe’. ieturn-to

return to its original position aftér completion of a cycle; however it
is more likely that the rotational effect will not be exactly reversed,

“and it is also usual.that brickwork ‘will settle in its new position and

will resist the forces trying to retum it to its original position. This
means that in a case where swelling takes place after construction:

- and cracking occurs, the cracking is likely to at least Partly remain
. after the shrink segment of the cycle is complete. Thus, each-time

the cycle is repeated, the likelihood is that the cracking will-become
wider until the sections of brickwork become virtually independent.

_ With repeated cycles; once the cracking is established, if there is no

other complication, it is normal for the inciderice-of cracking to
stabilise, as the building has the articulation it needs to cope with
the problem. This is by no means always the case, however, and
monitoring of cracks in walls and floors should always be treated

- Seriously.

Upheaval caused by growth of tree-roots under footings is nota -

‘simple vertical shear stress. There is a tendency for the root to also

exert lateral forces that attempt to Separate sections of brickwork
after initial cracking has occurred. :

Page 74

The normal structural arrangement is that the inner leaf.of brick-
work in the external wails and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure-on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there-is any‘doubt. In arly case, externally visible
cracking is important ag a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves. _ os : .

Effects on framed structitres .

‘Timber or ste! framed buildings are less Ukely to exhibit cracking
due to sweli/shrink than masonry buildings because of their
flexibility. Also, the doming/dishing effects tend to'be lower because
‘of the lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used’ under walls.
Where erosion er saturation cause a footing to fall away, this can
double the span which’a wall must bridge. This additional stress can
create cracking in wall Unings, Particularly where there isa weak
point in the structure caused by a door or window opening. It ts,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the dbove
symptoms for a considerable period. The same warning period should
apply in the case of upheaval. It should ‘be noted, however, that where
framed buildings are supported by strip footings:there is only one leaf

‘of brickwork and thérefore the externally Visible walls are the *

supporting ‘structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls. -

Effects on brick veneer structures :

Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the interna! walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf:
of a full masonry structure, , oo ,

 

: Water Service and Drainage

 

Where a, water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough
to saturate a clay foundation, A leaking tap near a building can have
‘the same effect. In addition, trenches containing pipes can become.
watercourses even though backfilled, particularly where broken .
tubble jis used as fill. Water that runs along these trenches can be

and saturation,

Pipe leakage and trench water flows also encourage tree and shrub
- Foots'to the source of ‘water, complicating and exacerbating the
problem. . sO
‘cor roof plumbing can result in large volumes of rainwater being
‘oncentrated in a small area-of soil: . . .

_* Incorrect falls in roof guttering may result in overflows, as may
‘gutters-blocked with leaves etc, ~ -

responsible for serious erosion, interstrata seepage into subfloor areas -

*, Corroded guttering or downpipes can spill water to ground.

* Downpipes not positively connected to. a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building. , .

isness of Cracking

   

 

In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair or even ignored, The table
below is-a reproduction of Table C1 of AS 2870. .

AS 2870 also publishes figures relating to cracking in concrete floors,
however because wall cracking will usually reach the critical point -
significantly earlier than cracking in slabs, this table ts not
Teproduced here.. Lt . :

 

i Prevention/Cure

Plumbing :

Where building movement is caused by water service, roof plumbing,
sewer or stormwater failure, the remedy is to repair the‘problem.

It is prudent, however, ta consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient sp!'to create .
erosion or saturation, particularly in moder installations using
‘smaller diameter PVC fixtures. Indeed, some gully traps are not
situated directly under the taps that are installed to charge thém,
with the result that water from the'tap may enter the backfilled
trench that houses'the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of

* the trench. As these trenches usually run alongside the footings and

can be at a similar depth, it is-not hard to see how any water that is
thus directed into a trench can easily affect the foundation's ability to
support footings or even gain entry to the subfloor area. :

Ground drainage’ :

In ail soils there is the.capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain, If necessary, a grated drain system _
connected to the stormwater collection system is usually-an easy -
solution, | : 2 . : : -

It ts, however, sometimes necessary when attempting to prevent °
water migration that testing be carried. out to establish watertable .
‘height and subsoil water flows, This subject is referred to in BTF 19
and may properly be regarded ‘as an area for an expert consultant.

Protection of the building perimeter .

It-is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants;
shrubs and trees causes somie of the most serious water problems. -

For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of Paving be installed
around as much of the buliding perimeter as necessary, This’ paving

 

CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS

 

 

 

 

 

Weathertightness often impaired

‘Description of typical damage and ‘required repair Approximate crack width . Damage
, : limit (see Note 3) oo, category
Hairline cracks * <0.1 mm 0
Fine cracks which do not need repair . <i mm 1
Cracks noticeable but easily filled. Doors and windows stick slightly <mm . 2
Cracks can be repaired and possibly a small amount of wall will need

to be replaced. Doors and windows stick. Service Pipes can fracture. -

5-15 mm (or a number of cracks . 3
- 3 rim or more in one group) :

 

15-25 mm but also depend |

Extensive repair work involving breaking-out and replacing sections of walls,
especially over doors and windows. Window and door frames distort. Walls lean

on number of cracks
or bulge noticeably, some loss of bearing in beams, Service pipes disrupted . .

 

 

 

 

 

 

re

Page 75

| * Water that ig transmitted into masonry, metal or timber building
elements causes damage and/or decay to thosé elements. .
+ High subfloor humidity and moisture content create an ideal
" environment for various pests, including termites and spiders.

- . * Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well'as dampness in general, can be a
health hazard to inhabitants, particularly those who are .

. abnormally susceptible to respiratory ailments.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The garden :
: as Joe . The deal vegetation layout is to have lawn or plants that require
HUTTE vo only light watering immediately adjacent to the drainage or paving
Patis [1 i fe L. edge, then more demanding plants, shrubs and ‘trees spread out in
Si oo oy that order. : :

Overwatering due to misuse of automatic watering systems is a

common cause of saturation and water migration under footings. If
‘it is necessary to use these systems, it is important to remove garden . -
" beds to a completely safe distance from buildings. .

Existing trees

Where a tree is causing a problem of soil drying or there is the

existence or threat of-upheaval of footings, if the offending roots are
- subsidiary and their removal will not significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent future root growth in the direction of
the building. If it is not possible to remove the-relevant roots
without damage to the tree, an application to.remove the tree should
be made-to the local authority. A prudent plan is to transplant likely
offenders before they become a problemi... moe

 

 

  
 

 

 

 

 

 

 

 

 

 

 

Information on trees, plants and shrubs °

State departments overseeing agriculture can give information

- Tegarding root patterns; volume of water needed and safe distance
from buildings of most species.- Botanic gardens are also sources of
information. For information on plant roots and drains, see Building
Technology File 17. 2 - :

 

 

should extend outwards a minimum of 900 mm (more in highly Excavation 7
reactive soil) and should have a minimum fall -away from the" Excavation around footings must be properly engineered. Soil
building of 1:60. The finished paving should be no jess than 100 - Supporting footings can only be safely excavated at an.angle that
mm below brick vent bases.  - - allows the soil under the footing:to remain stable. This angle is

: called the angle of repose (or friction) and Varies significantly
Tt is prudent to relocate drainage pipes away from this-paving, if between soil types and conditions. Removal of soil within the angle

possible, to avoid complications from future Jeakage. If this is not i
practical, earthenware pipes should be replaced by PVC and ~ of repose will cause subsidence.
backfilling should be of the same soil type as the surrounding soil : ’
-and compacted, to the same density. : :

Except in areas where freezing of water is an issue, it is wise to-. so Co : . :
remove taps in the building area and relocate them well away from Where erosion has occurred that has washed away soil adjacent to

‘iRemediation

the building — preferably not uphill from it (see BTF 19), . > footings, soil of the same classification should be introduced and
ot : wo, . compacted same di . Whi have been.
Tt-may be desirable to install a grated drain at the outside edge of the ‘ - od cucemenon other sn cone ok may be required
paving on the uphill side of the building. If subsoil drainage is . 4 , , .
sded thi be led und J Remediation of footings and foundations is generally the realm of a
eo this can be installed under the surface drain. t jalist consultant. /

Condensation . se " Where isolated footings rise and fall because of swell/shrink effect,
In buildings with a subfloor void such as where bearers and joists the homeowner may be tempted to alleviate floor bounce by filling

support flooring, insufficient ventilation creates ideal conditions for the gap that has appeared between the bearer and the pier with .
condensation, particularly where there is little clearance between the blocking. The danger here is that when the-next swell segment of the
floor and the ground. Condensation adds to the moisture already eycle occurs, the extra blocking will push the floor up into an
present in. the subfloor and significantly slows the process of drying __ 8ccentuated dome and may also cause loca) shear failure in the soll.
out, Installation of an adequate subficor ventilation system, either “IE it 4s necessary to.use blocking, it should be by a pair of fine

natural or mechanical, is desirable. - . __-Wedges and monitoring should be carried out fortriightly.
- Warning: Aithough this Building Technology File deals with . This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
cracking in buildings, it should, be said that subfloor moisture can ‘Construction Diagnosis. . :

result in the development of other problems, notably:

 

   

The information in this and other issues in series was derived from various sources and believed to be correct when published.

  
 
  

 

advisory. It is provided in good faith and not claimed to be an

     

 

needs to be obtained before tal

 
 

‘Furthér professional advice

    

: Distributed by oo
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia
Freecall 1800 645 051 Te! (03) 9662 7666 Fax (03) S662 7555 www.publish.csiro.au

. Email: [email protected] ; .
© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited ,

Page 76

 

NOTE: NOTE: NO CONCRETE IS TO BE PLACED
1. THIS DRAWING TO BE IN CONJUNCTION WITH UNTIL THE INSPECTOR OR ENGINEER HAS INSPECTED
THE FOLLOWING: AND APPROVED THE EXCAVATIONS &
REINFORCEMENT IN PLACE. THE CONTRACTOR
(6) FOOTINGS AS DETALED INSPECT AND CONFIRM EXCAVATIONS PRIOR

(b) SITE INVESTIGATION REPORT (S TO CAREFULLY READ THE DESIGN DRAWINGS TO THE PLACEMENT OF ANY CONCRETE. .

(c) ARCHITECTURAL DRAWINGS AND ENSURE ALL CONSTRUCTION IS IN ACCORDANCE CON ! [—~—— REFER TO TYPICAL BLOCK
I
le

Y INDICATES 800 LONG BACKHOE PIERS
Ws @ 2400 CRS. FOUND MIN 2000 BELOW
FINISHED SURFACE LEVEL. INTO MEDIUM

DENSE LIGHT GREY SAND. ENGINEER TO i

 

FENCE DETAILS

 

 

 

 

 

(d) APPROVED COUNCIL PLANS WITH THE DETAILS INDICATED.
(0) CSIRO BTF $8 GUIDE : B1
2, SHOULD THE SUB-SURFACE SOIL PROFILE VARY Wy
FROM THAT SHOWN IN THE SITE INVESTIGATION Yi. LLL. LYL. — FZ Ut. i
REPORT, NOTIFY THE ENGINEER IMMEDIATELY, |
DO NOT POUR ANY CONCRETE. |
3. CC DENOTES CRACK CONTROL JOINT LOCATIONS, i |
CUT EVERY SECOND STRAND OF FABRIC CROSSING BRITTLE FLOOR COVERINGS (ie TILES) i| 400mm THICK SLAB
JOINT. PROVIDE TOOLED JOINT WHILE CONCRETE IS Note: AS2870-1986 CLAUSE 5.3.7 REQUIRES
STILL GREEN. THAT WHERE BRITTLE FLOOR COVERINGS ARE $L82 FABRIC 30mm MIN TOP COVER \

. TO BE USED THE AMOUNT OF REINFORCMENT -N n No
4, SLABS LOCATED ON UNCONTROLLED (UNCOMPACTED) WITHIN THE SLAB SHALL BE INCREASED TO a N
FILL TO HAVE MASS CONCRETE PIER FOOTINGS S192 OR AN APPROPRIATE FLEXIBABLE BEDDING

LOCATED UNDER BOTH INTERNAL & EXTERNAL

BEAMS. REFER ENGINEER FOR PIER LOCATIONS.
5. ALL EARTHWORKS TO BE COMPACTED TO 95%

(STANDARD) OF ITS RELATIVE DRY DENSITY

SYSTEM SHALL BE USED OR A MINIMUM
PERIOD OF THREE-MONTHS SHALL ELAPSE
FROM THE TIME OF CASTING TO

THE PLACEMENT OF THE TILES,
THE CONTRACTOR IS TO CONFIRM WITH THE

OWNER SUCH AREAS.

 

 

 

 

REFER SITE INVESTIGATION REPORT
6 UM CONCRETE STRENGTH fc = 20MPa
. NAL SLUMP 80mm
7. LAP ALL REINFORCEMENT 40xNOMINAL BAR DIA.
8.. LAP ALL REINFORCEMENT AROUND CORNERS
40x BAR DIA.
9. VIBRATE ALL CONCRETE

10. BAR CHAIRS SUPPORTING SLAB FABRIC TO BE NO
MORE THAN 800MM APART. (AT LAPS 400mm)

41. NOTIFY ENGINEER IMMEDIATELY OF ANY
DICREPENCES.

42, BRICKWORK IS TO HAVE CONTROL JOINTS LOCATED
AS PER THE FOLLOWING SCHEDULE:

REQUIRED CENTRES} SITE CLASSIFICATION
8m CENTRES 'S & 'W’

6m CENTRES ‘W

TO BE ASSESSED e

: |
L JOINTS ARE TO BE CONSTRUCTED IN ACCORDANCE . |
|

IE RECOMENDATIONS OF TN&1 OF THE CEMENT AND
No Ae TIE Wiz Zr

 

 

 

THIS DRAWNG IS TO BE READ IN CONJUNCTION WITH
THE GEOTECHNICAL AND SITE INVESTIGATION REPORT
PREPARED BY JTC CONSULTING ENGINEERS REF. 207196
DATED 03/12/07. SITE CLASSIFICATION *P*

SS

 

 

 

 

Z

 

 

YW lL

B1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONCRETE ASSOCIATION OF AUSTRALIA.

CONCRETE CURING: B1
ADEQUATE PERFORMANCE OF CONCRETE DEPENDS ON :

PROPER CURING TO CONCRETE:
4/ FOR FINISHING LARGE SLABS AND SLABS POURED -oN

(N RAPID DRYING CONDITIONS SUCH AS HIGH
DRIVEWAY - 32MPa CONC. / \
USE CONFI EVAPORATON RETAROENT AND) 400mm THICK. SL82 FABRIC \

USE "CONFILM” EVAPORATION RETARDENT AND \
FINISHING AS IN ACCORDANCE WITH THE TO DRIVEWAY TYPICAL \
30 ISAs ceecirEn \——7 —\REFER UNDERGROUND TANK
FINISH MANUFACTURERS SPECIFICATIONS

 

 

 

 

 

MANUFACTURERS SPECIFICATION.

2/ COVER CONCRETE INCLUDING SIDES WITH PLASTIC
OR ACRYLIC CURING COMPOUND AS SOON AS THE
‘SLAB CAN STAND TRAFFIC LOADS.

 

 

 

FOOTING BEAM LAYOUT

NTS.

 

 

FAGURED DIMENSIONS TO TAKE PRECEDENCE oveR| APPROVED 207196

 

 

PROPOSED DUPLEX

4 Easton Street (Cnr Maud Street),

KJ CONSTRUCTIONS SCALED MEASUREMENTS. VERY ALL ON STE [pau SCALE 1: 100 UNO

O

 

 

Maroochydore QLD 4558

23 EDWARD STREET DIMENSIONS AND LEVELS PRIOR TO THE we [DATE OCT 2007

 

 

  

Telephone (07) 5443 6585 IENCEMENT OF ANY CONSTRUCTION.
CoM EN DRAWN MT

NOOSAVILLE

-

 

 

Facsimile (07) 5479 1754

Postal Address PO Box 5960
Maroochydore BC OLD 4558

! A_[15/10/07 | WORKING DRAWING COAT REPENS,
! ISSUE| DATE EVENT.

 

 

 

 

 

 

CONTRACTOR TO NOTIFY ENGINEER IMMEDIATELY
crs SHEET 001

 

 

 

 

 

 

CONSULTING
ENGINEERS

[email protected]
adgsuncoast.com

Web

5

Email

CLIENT JOB DESCRIPTION

 

Page 77

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

  

 

 

 

 

 

 

 

 

 

   

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STARTER EARS FT “REFER FOOTING PLAN RiOUGSAT enn cRSOR No2-N12 BARS a 1 N12 CORNER BARS
| | FER FOOTING Fu EQUIV. CAGE, 75 BOTTOM COVER. TOTOP OF 82/81 | | / |
, CaLocK SE L | 4 | | . g Lot .

\ =r == g I ———— N12‘ BARS TO BE
aD 7 aps Q NOTE ENSURE TRENCH MESH TIED TO UNDERSIDE
= ! 7 ‘SELECTED SAND BEDDING , = IS LAPPED. OF SLAB MESH.

: R10 STARTER BARS AT =
TI 600 CRS. COG 100mm MIN. a
N 400 LAP WITH SLAB FABRIC 2
8 ~~ rn BEAM B2 MUST BE POURED - —e
ios aT ait CRS OF a 450 WITH MAIN FLOOR SLAB. LD y ° 2-N12 STARTER BARS TO BE BENT AND
EQUIV. CAGE, 75 BOTTOM COVER. <—=g “i LAPPED 500mm WITH TRENCH MESH
4 ih B2 BEAM CT :
maou} 45 | B1 BEAM | (POURED WITH SLAB) = BD “0
| | | 1 00 Lone BACKHOE PIERS TOLENSTAN? “ | Bt
| | | | @ 2400 CRS MAX CRS. ' SECTION D-D
| | | | __ FOUND INTO DENSE SAND. INTERSECTION B1-B2
=| | 1 500 tone sncxHoe pers | | So PLAN VIEW
@ I | @ 2400 CRS MAX CRS. LJ
| | FOUND INTO DENSE SAND.
l |
tL]
4511 TRENCH MESH TOP & BTM, REFER FOOTING PLAN
R10 LIGS AT 900mm CRS OR FOR FABRIC SIZE A f NOTE ENSURE TRENCH MESH
EQUIV. CAGE, 75 BOTTOM COVER. | Tsuen
3 Pan) — __ T es |
Ear
BEAM B2 MUST BE POURED
450 WITH MAIN FLOOR SLAB. B1 a
|_| | 500 | o
Bo BEAM 2a COMERENS f i i —— x
el be os
e} (AT STEP DOWN) CORNER DETAIL go PENS] “Tosetneaib on
PLAN VIEW mb sd seer
SLAB FABRIC SECTION P-P
AS SPECIRED PIPE PENETRATION DETAIL
STEP TO SUIT
FOR PLUMBING INSTALLATION REQUIREMENTS
r REFER : RECOMMENDED GUIDELINES FOR SANITARY
| AND STORM WATER INSTALLATION ON REACTIVE SITES.
SELECTED SAND ! MESH LAP
BEDDING ' BEDDING
ROW OF BAR CHAIRS
TYPICAL STEP DETAIL. AT CHANGE IN DIRECTION
4 50mm SLAB STEP
OW) 4 Easton Street (Cnr Maud Street), = UPLEX PRECEDENCE oveR| APPROVED 207196
yn a sa = ee
SIU! Telephone (07) 5443 6585 g 8 DIMENSIONS AND LEVELS PRIOR TO THE REPO 4092 {DATE OCT 2007
- BE Facsimite (07) 5479 1754 a 3 NOOSAVILLE con SOW TMMEDIATELY SIGNED RAWN MT
a SS Posal FSe5 A_|15/10/07 {WORKING DRAWING OF COR To io ENGINEER D
“J oi Maroochydore BC OLD 4598 igs? CUENT JOB DESCRIPTION : ISSUE| DATE EVENT . Es =~ ~ [SHEET 002
g : =

 

 

 

 

 

 

 

 

 

Page 78

 

RW SUMPS. REFER TO SPICE
CONSULTING DRAWINGS FOR

: line of externa! wall under FALL EXTERNAL SLABS TO
SUMP LOCATIONS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pao esssest-—— CH CTs a
L —20 |
| {250 arse — Fi 5 | |
h Sen | a
wr
Ine of external wall under | line of external wall under
II |
H |
|
A-A\ | |
006 | | |
K-4 |
e@ |
cr provide drip grooves to u/side
of floor slab.
where not possible, use overhanging
zine flashing to top of wall
REFER TYPICAL
[~~~ SUSPENDED
ij STAIR DETAIL
FLIGHT 1, FLIGHT 2
> q SHEET 17
|
|
|
|
|
|
|
e |
|
250] |
ih
pnd tos)
Bo
line of external wall under
250] DENOTES MIN SLAB THICKNESS
REINE COVER.” N
30 TOP COVER, 30 BIM. COVER - INTERNAL SURFACES. SUSPENDED SLAB FRAMING PLA
45 TOP COVER, 45 BTM. COVER — EXTERNAL SURFACES.
OW) 4 Easton Street (Cnr Maud Street), & KJ CONSTRUCTIONS PROPOSED DUPLEX ROURED DIMENSIONS TO TAKE PRECEDENCE over| APPROVED 207196
Ft Maroochydore QLD 4558 Bg TREET SCALED MEASUREMENTS. VERY ALL ON SITE Sams [SCALE 1-100 UNO
SU Tetepho. gs 8 23 EDWARD S DIMENSIONS AND LEVELS PRIOR TO THE JOH
3B Telephone (07) 5443 6585 8 2 NOOSAVILLE COMMENCHIENT OF ANY CONSTRUCTION. REPO. 4092 |DATE OCT 2007
QE Facsimile (07) 5479 1754 BG — NT OF ANY CONSTRUCTION. | sve) [pawn MT
OZ Postal Address PO Box 5960 Foe 5 A__[15/10/07 [WORKING DRAW OF ANY DSCREPENCES. eer (SHEET 003
OUI Maroochydore BC QLD 4558 Gs | CUENT JOB DESCRIPTION ISSUE | DATE EVENT. >

 

 

 

 

 

 

 

 

 

 

Page 79

5

 

LAND USE SECTION FEES

 

 

 

 

 

 

 

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme’ Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/lmpact
Consistent 527
Inconsistent 521
Assessment under Superseded Planning Scheme §21
Modification to a Development Permit 521
Extension of a Currency Period : §21
Operational Works - Landscaping (C77 §21
e@ Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW .
Half Hour §22
One Hour §22
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee §24
Jetty Bond 51
(Category 4)
BONDS
Performance Bond 61
(Category 9)
SIGNS
Registration Fee 222
sEA@HH FEE
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL $ (O?S
NAME: dTehnw € Wher tye & ,
ADDRESS: [23 Fawtard St
Niessayrte Ute
FILENO: oY] COLE DATE: JF ]Jlog
RECEIPT NO: ZSMY4L . Signature of TP Officer: D< fasee
AUTHORITY NO:

 

It { Dever Sf Cobel/

om

      

eg a AS RS

Page 80

     

re> ENIOrew.\ DEVELOPMENT FEES & CONTRIBUTIONS
on Rak (Cashier: PleaggsSetum to Admin Officer, Development) .

     

 
   
  
  
 
  
 
  

 

 

 

 

 

 
 
 
 

Application Fees : / . :

Road / Drainage Plan Exam 4s _ 541
Road / Drainage Field inspection : Ue7o - 542
Legal Document Examination . 543
Sealing Fee - Survey Plans, Legal Documents 544
Sale of Documents, Policy Lists, Misc 545

Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee

 

 
 

 

 
   
  

    
   

Plan Examination Calculation.

   

 

  

 

 

Developer Contribution - Landscaping O85,
Developer Contribution ~ Road Other than PSP __ : 553 © ! (Ss
a = Bu
Developer Contribution - Drainage Other than PSP bay

 

  
  

Developer Contribution Pathway Other than PSP
Developer Contrib. - in Liew Of St Parking (PSP13 Car Parking)

Developer Contribution - Other Parks and Community
(CS — Community Land (Not currently active)
ICS - Public Transport

ICS ~ Sewerage (PSP Rural)

ICS ~ Sewerage (PSP Coastal)
ICS - Sewerage - South Peregian (PSP Maroochy)
ICS — Water Supply (PSP)

ICS - Sport and Recreation Land (PSP Parks)

 
  
 
 

 

   
 
   
 
 

 

 

 
   

 
 

 

 

Address:

 

  
 
  

ICS — Road (CMRNICP) if BA not entered then use 594
ICS - Pathway (PSP)

 

  
   
  
 

Development Location:

   

Total of Fees Paid (Excluding Bonds)

 

   
    
  

  

 

3 art eau ; (PE File Numbers or Reference:
laintenance/Uncompleted Works Bond 9)
Total of Fees Paid (Including Bonds) $ Date application properly made:

Receipt No: Receipt Date:

>fland DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES. doc

Page 81

 

  

RISE SOs
1: VENT IN

     

 

 

 

 
  
    
  
  
  
 

PLLLIT A

 

 

 

CAST IN SLAB

TO CLEAR GARAGE DOOR
UNDER

NV04/01/02 | RAISE MANHOLE COVER

LL 1.89 TO SUIT NEW SL.

. (APPROX 0.52)

HCB_1.78(10) | WORK TO BE PERFORMED BY

OFFSET 1.39 NSC DAY LABOUR

COVER 0.0 |

TYPE A

 

 

 

 
 
  
  
  
  

 
 
 
  
   
   

 

 

 

 

 

 

RISE/DROP
FROM
KITCHEN
HWU

RISE_RW FROM

CONTROLLER
~ |

    

 

RISE/DROP
FROM
KITCHEN
HWU

     

 

 

 

 

RISE RW FROM

/ CONTROLLER

 

 

 

  

 

 

 

16 L/MIN
GAS “HWU
FACTORY SET
TO 50°

  

 

 

 

PROVIDE
OND SIGN

 

 

 

PNT
WN

 

 

 

 

 

 

 

 

 

 

 

SANITARY DIAGRAMMATICS

NTS

GENERAL NOTES

4) OBTAIN ALL NECESSARY APPROVALS FROM ALL AUTHORITIES HAVING JURISDICTION
AND PAY ALL FEES DUE.

2)ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY
LANG A SURSORTION AND WITH THE REQUIREMENTS OF ALL RELEVANT AUSTRALIAN

3) CONFIRM INVERT LEVELS AND LOCATIONS OF ALL EXISTING SERVICES PRIOR TO THE
INSTALLATION OF ANY ASSOCIATED SERVICES.

4) THESE DRAWINGS ARE A DIAGRAMMATIC REPRESENTATION OF A PROPOSED
PLUMBING AND DRAINAGE INSTALLATION. USE DIMENSIONED ARCHITECTURAL
DRAWINGS FOR SET OUT OF PENETRATIONS RELATING TO PLUMBING FIXTURES.
IT IS THE RESPONSIBILITY OF THE INSTALLER TO CO—ORDINATE THE ON-SITE
INSTALLATION WITH OTHER SERVICES INSTALLATIONS AND STRUCTURE.

DO NOT SCALE THESE DRAWINGS.

5) THE CONTRACTOR IS TO ASCERTAIN THE EXACT LOCATION OF ALL EXISTING
SERVICES PRIOR TO COMMENCEMENT OF CONSTRUCTION AND SHALL BE
RESPONSIBLE FOR THE COST OF RECTIFICATION OF ANY DAMAGE WHICH MAY
OCCUR. THE LOCATION OF EXISTING SERVICES SHOWN ON THIS DRAWING IS
REPRODUCED FROM LOCAL AUTHORITY RECORDS ETC. FOR WHICH NO OPINION
IS EXPRESSED AS TO THE ACCURACY OF SAME.

6) 'AS-CONSTRUCTED” DRAWINGS— WHERE REQUIRED BY THE LOCAL AUTHORITY— ARE THE
RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL RECORD ALL
CHANGES 70 ORIGINAL DESIGN AND ALLOW ALL COSTS FOR THE PREPARATION OF
"AS-CONSTRUCTED’ DRAWINGS.

TYAS A CONDITION OF TENDERING, THE CONTRACTOR SHALL VISIT THE SITE
AND SHALL BE DEEMED TO BE FULLY AWARE OF SITE CONDITIONS.
ANY CLAIM FOR VARIATION ON THE BASIS OF LACK OF KNOWLEOGE OF SITE
CONDITIONS SHALL NOT BE ACCEPTED.

8) WHERE A PARTICULAR MANUFACTURERS PRODUCT IS SPECIFIED OR NOTED,
OTHER MANUFACTURERS PRODUCTS MAY BE SUBSTITUTED.
SUBSTITUTED PRODUCTS MUST HAVE PERFORMANCE LONGETIV

DOCUMENTED PROOF OF SAID CRITERIA MAY BE REQUIRED.
NOTE: FIRE COLLARS EXCEPTED — REFER NOTE BELOW

9) ARRANGE WITH LOCAL AUTHORITY FOR A 25¢ WATER CONNECTION
AND PAY ALL FEES DUE.

10) USE EXISTING HOUSE DRAIN CONNECTION, PAY ANY AND ALL FEES DUE.

WATER SUPPLY
1) CW & HW TO INDIVIDUAL POINTS IS 15% U.N.O.
2) HW IS 18# THROUGHOUT UNO.

 

BACKFLOW PREVENTION

1) PROVIDE BACKFLOW PREVENTION VALVES AS AND WHERE REQUIRED
EX MANUEACTURER AND/OR LOCAL AUTHORITY TO RAINWATER

SANITARY PLUMBING & DRAINAGE

4) ALL SANITARY DRAINAGE SHALL BE 100 DIA. AT 1.65% FALL UNO.

2) MINMUM SIZE OF ACCESS PANELS SHALL BE 600mm X 300mm.

3) ANY FLOOR WASTE GULLY WHICH RECEIVES DISCHARGE FROM A LAUNDRY
TROUGH SHALL BE FITTED WITH AN ANTI-FOAMING GRATE SYSTEM,

MATERIALS:

HOUSE DRAINAGE PVC CLASS OW

SOIL, WASTE AND VENT PIPE — P¥C CLASS DWV

LEGEND

HOUSE DRAINAGE
STORMWATER DRAINAGE
ROOFWATER DRAINAGE
OLD WATER
HOT WATER
VENT
NON~POTABLE WATER SUPPLY
EXISTING SEWER
STOP TAP
METER
ELEVATED PIPEWORK DROPPER

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 
 

  
   

DOWNPIPE
3) CW TO MORE THAN 1 POINT SHALL BE 209 OR GREATER
4) EXTERNAL HOSE COCKS SHALL BE SUPPLIED WITH 208 (MIN)
26 L/MIN FEED AND BE FITTED WITH INDIVIDUAL STOP TAPS. PROPOSED LEVEL
GAS Hwu 5) SIZING (EG 206) REFERS TO TYPE B COPPER TUBE. REFER EXISTING LEVEL
FACTORY SET AS 3500.1.2 TABLE 1.1 FOR EQUIVALENT PIPE SIZE IN OTHER WALL BASIN
TO 50° APPROVED MATERIALS.
6) IN NO CASE SHALL A 158 COLD BRANCH EXCEED 3m IN LENGTH FLOOR WASTE GULLY
7) POSITION SERVICES IN CEILING SPACES AND WALL FRAMING ULN.O. KITCHEN SINK
8) JOINTS IN PRESSURED WATER SERVICE PIPES UNDER FLOOR SLABS ARE NOT
26 L/MIN PERMITTED. TROUGH
GAs Cy sa 9) ALL IN-GROUND VALVES SHALL SE ENCLOSED IN APPROVED PATH BOXES.
TO 50° 10) FLOW RESTRICTION DEVICES SHALL BE FITTED WHERE TAP FLOW RATES SHOWER
ARE NOT SELF-LIMITING. DEVICES SHALL HAVE A MAXIMUM OF 4 LARGE
WATERWAY PORTS TO REDUCE BLOCKAGES. (CONSERV OR SIMILAR)
THEY SHALL BE USED TO RESTRICT FLOWS TO BASINS, SINKS, SHOWERS WATER CLOSET
& TUBS TO A MAXIMUM FLOW OF 91/5.
11) HOT WATER PIPE INSULATION SHALL FULLY COMPLY WITH AS3S00.4:2003
SECTION 8. MINIMUM R VALUE OF 0.3. WASHING MACHINE
12) TAP OUTLET POINTS SHOWN ON PLAN ARE INDICATIVE ONLY. REFER TO
ARCHITECTURAL AND/OR END CLIENT SPECIFICATIONS FOR PRECISE OUTLET 450 x 450 C/PMT WITH A515 x 515 HOG
LOCATIONS, SUMP GRATE & FRAME EQUAL 10 WEBFORGE (2)
13) PROVIDE GAS HWU WHERE SHOWN ON FLOOR PLANS MODEL G86 44H.
14) INSTALL COLD WATER CONTROLS AND PIPING ON THE INLET SIDE
DBE A WO COMPLY WITT ae Sebord mn ON Aneontes STORMWATER & DOWNPIPES
WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY 1) ALL STORMWATER DRAINAGE SHALL BE 100 DIA AT 1% FALL UNO.
Hc 45) RETICULATE HOT WATER TO ALL FIXTURES EXCEPT HOSE COCKS, 2) DOWNPIPE SIZES STATED ARE MINIMUM REQUIRED CROSS~SECTIONAL
DISHWASHERS AND WATER CLOSETS AREAS. (1008)
CAST SERVICE UNDER DND SIGN 16) PROVIDE A 500kPo PRESSURE LIMITING VALVE
0 MATERIALS:
FLOOR SLAB & RISE \ EAM OF Ti
FLOOR § RUDA00 IMMEDIATELY DOWNSTR HE DWELLING METER DOWNPIPES ove CLASS DWV
MATERIALS: STORMWATER PVC CLASS SW HEAVY UNO
ACRONITRILE BUTADIENE STYRENE, TYPE 8 COPPER, COPPER ALLOY
STANLESS STEEL, POLTBUTYLENE, POLYETHYLENE, CROSSLINKED
POLYETHYLENE, HIGH Ni
5000 L DURAPLAS 5000 L DURAPLAS (OP CeovDE RISE ON WALL RISE ON WALL WITH LIMITATIONS AS STATED IN AS 3500.
ine Peron ey || ite: eran tay WD saBs Be ame Reta aate oT —
WITH FIRST FLUSH || COMPLETE WITH FIRST FLUSH PROVIDE BACKFLOW PT
SUPPLED SY MANUPAE SUBPLIED Ky MANUEAG Be eens eUIRED DEVICE AS REQUIRED ENCASED IN CONDUIT FOR THE FULL DISTANCE INCLUDING ENTRIES EXITS PT
SUPPLIED BY MANUFACTURER SUPPLIED BY MANUFACTURER BY CONTROLLER BY CONTROLLER EROU THE SLAB PAGES CORUNORE: ADONIS SNA eee
MANUFACTURER MANUFACTURER. PET
(oev) (00¥) I ES _
ABBREVIATIONS ——
SS : cs lo
UNIT WETER TO BE cum LOTS WAS Wace a
cua bev LEK a
PERMENANTLY LABELLED pn DO NOT DRINK
WITH UNIT NUMBER A 20/12/07 CERTIFICATION Randall Spice
ow P
M DISH WASHING MACHINE BS REVISION [~pesinep ft
| ° TATED Pim rf SPICE CONSULTING
EPD ELEVATED PIPEWORK DROPPER i
FFL FINISHED FLOOR LEVEL dj CONSTRUCTION HYDRAULICS CONSULTANTS)
nt
FOL FINISHED GRATE LEVEL Hoo PO BOX 1406 BUDERIM Q 4556 rs
FSL FINISHED SURFACE LEVEL Telephone 07 5445 3888 Sess
Fwo FLOOR WASTE GULLY QBSA Facsimile 07 5445 3824
[3 | He HOSE Cock 1124616 Email ~— [email protected] AHSCA
Qo
- SUIENT
4240 fo NEW eee, DOMESTIC SUPPLY HWU HOT WATER UNIT KJ CONSTRUCTIONS
boomer bd M AW IN ACCORDANCE WITH ASSOCIATED CONSULTANT
rm INVERT LEVEL JTC CONSULTING
los INSPECTION OPENING TO SURFACE DRAWING :
| LEVEL: AHD
b ORG OVERFLOW RELIEF GULLY SITE & FLOOR PLANS SCALE:
@ a 5 SINK ALL SERVICES At 4-100
X \_ X SHR SHOWER a3 1 . 200
SL SURFACE LEVEL 7
DISCHARGE TO KERB DISCHARGE TO KER DISCHARGE TO KERB 16 TEST GATE PROUEGT STATUS men
UNO UNLESS NOTED OTHERWISE PROPOSED DUPLEX APPROVAL
we NATER CLOSET LOT 23 EDWARD ST an A
NOOSAVILLE 686-01
“4 oF

 

Page 82

 
 

180d0°
£

 

 

 

 

 

 

  
       

    

 

 

   

 

    

450 x 450mm
Soakage pit — ce Soskage mit sth Silt
with Silt-trap 480d0' oakage pit with Sul-trap
E 3 —
w 10.059m  § 10,059 m as
. A 450 x 450mm |
o oan= S 5 Soakage pitwith Silttrap A = 2 ee - - gcy — At - e wsee
So ald a S—
5 | << <==
- 5 i ool safe gate & fence -&
—| ef _. pool safe g s— E
Se iF 200mm Diam. PVC stormwater ° ”
ya Ho / pipes falting at Approx. 1:50 CN N
3 J oh E to street stormwater system. wW a
E 7 SSS SSW o RQ a
N . - N
9 “ay 9) 1,804 OMP Upper Level
° S £ Ee
Balcony ab hown dashed
5 1,804 OMP Upper Level & = mewesnown wee
= E S g
e - 2 2
MS nw
< <
o oO c ¢
2 2 3 3
o Oo
Si Ni
oS oa
3 oD Wall to floor above
oS oS 1 504 OMP. vf shown heavy dashed
i ix
N N
1 .504 OMP4 Bin store with sump
i pit to sewer system
Stormwater to tocat council system
also see stormwater plan
Ee
E ls
i S oO
£ a o
< a REVERSING
iD BAY
cad
5000L rainwater tank | @ 5000L rainwater tank (|
nder drive-wa t nder-drive-way- |
Installed to manufac. spec. Installed to manufac spec. Pl ag 200L Native Trees to front & back comers.
Overflow vt0 street Overflow to street Footpath to council 5 g 180d0° 20.117 m 45L Native Screening Trees along side
stormwater system stormwater system. requirements al & rear boundaries with small naive shrubs h
groundcovers & approved rnulch over hig
Exposed Aggregate Concrete Slab Drive-way quality local garden bed soils.
with falls to Street and gradients to council
requirements, See Section C. Proposed electric sliding gate
Fall drive-way to everhard channet & grate
to sump connected to street gutter through
100 x 75mm Gal. steel piping 23 EDWARD STREET
CALE 1: 200 SCALE 1: 200
5m 0 5m
LOT S 1&2 ON GTP 482 ON RP 81559
SS
N Sap Ss
Lr er
Plunge Pools not shown
|
BUILDING APPROVAL
FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
DESIGN / DRAWN : BUILDER: gy consTaUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE (NOT FOR CONSTRUCTION )
ROBERT PATTERSON
BSA Lic.No. 218 . i DIMENSIONS AND LEVELS PRIOR TO THE
[WD QBSA Lc.No. 1095554 HSA Lice, 21815, COPYRIGHT : No reproduction ator COMMENCEMENT OF any CONSTRUCTION. KJ CONSTRUCTIONS PROPOSED DUPLEX LOTS 1 & 2 AT 23 EDWARDS seme tas

fox G7 544s 188 tm : 0409 471 714 Heo permission of the autho CONTRACTOR TO NOTIFY DESIGNER IMMEDIA es Q8-DES e NOOSA * OWES -o2|
DESIGN to DETAL TO s Jc: Hearst bigpond.net au ‘OF ANY DISCREPENCIES. ISSUE DESCRIPTION poate

 

Page 83

 

 

180d0'

 

 

 

 

 

 

 

 

 

   
      

                    

 

 

 

         
   

 

    

 

 

 

 

 

 

 

 

 

  

 

 

 

 

Q
z
>
7 §
# 106 # OTST C5
©) as
* oss tary “— war Hoes ui —l
2 oat OOre AGE oor “oon oat CeES A DET wre ~” ae
5 3 a6. 06 — cert port ogr core * © mw
83 3 Ost A 0Gr  Fost't | 5 O 8
33 gz Cer 0589 oS ORS O-
és 2 8 way
go 2 & | 3
, oF Fs Loe oO Ww 3
| 38 2 2 | °
| 8% § 2 wezsoz w (LLb'0€) LoPOLz W PS6'6
| !
pot --——-- on ——
po i
Po NX [A trrrcr retry pc 3 a 37
| Bi 2 Gossive 5 NMWIZosE = l
| +e a's = Sry | ET
| if 18 aah al g |
| ig 4 EN 7 i |
‘ers PA ee aati to
pos Sod alae | |
| 1 oe rN 4 ¥ |
| if | i} ad ie N |
| gix 4 es a a |
| sie fat & aie | ae > |
| re ee | en eer ad |S!
My =| — io}
| Ce: 8 14 le
H 5 ° J
| ery 8]: 8 213 os
| jt 3 Syl i ity ee. 5 los
l wy | 1d | BP 4 | §
| a a3. J |
g 3 Bo 3 7 1 Ss “Ig rg te
ST =a ST SSS xs x = |
opos «| ike tt fa sma AW Re (uy: or =
i) 8 ! aa | § | 2
+ 13 +e i 8
it |
By § + a bal 4 |
or g | B35 2 |
as si | 68 | ae |
ai) | > movronae fesanecnnenecasces 5 sy % K |
“1 3 =—a g “| 2g > |
ae N = | 3 = |
rigs N ~ |
ge «3 ren * |e | d
ig 8 ay ~ | & |
on z N tg
ae S N Bey |
a pally | “| Z| S|
aig 5. } ! Ng ait) |
$3 “ ur : N 2 aos 3 <= 8
Ay 8 BS ee a i i SBE |
i Oe eee eee eee eee j------eeeeeeeeee a } ' ! ; alae | a
4 iy i 3) 88 3 !
' NM; | +
weer er penn en a a
' Ww €zg"0z w (22%'08) 7 opdzz | Wt 7S6°6
'
rfoer

 

 

0) a 7
\
AoE 0Ss°9 06

4 OSTT 17 06 ost's

Age 008s cert pOLT HA SEE OPZ 7 coat

 

 

 

ie _OWG NO. 6017

(NOT FOR CONSTRUCTION )

21
D

BUILDING APPROVAL

O

DESCRIP

8
ISSUE

LOTS 1 & 2 AT 23 EDWARDS

NOOSAVILLE

PROPOSED DUPLEX
JOB DESCRIPTION

Kj CONSTRUCTIONS

FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER

SCALED MEASUREMENTS, VERIFY ALL ON SITE

DIMENSIONS AND LEVELS PRIOR TO THE
CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY

COMMENCEMENT OF ANY CONSTRUCTION.

IT : No reproduction of ail of part
ing may be undertaken without the

|
express written permission of the author.

0oz't 002
ost ——oort aE they eee oer ore at
018% BOzT we HOSE
os OIEST 008

 

copy!
of this

KJ CONSTRUCTIONS
QBSA Lic.No. 21815
fax : (07) 5447 1714
m: 0409 471 714

BUILDER :

ROBERT PATTERSON

QBSA Lc.No. 1095554

fax : (07) 5449 1899
m : 0401 394 964

DESIGN / DRAWN :

C3

Page 84

- -—— bulkhead

opening in wall —— 4 i f ~~~ -— Faking wing walls | 200 gap between
! | | roofs with fouvre
t | ——- rake walls or mesh vents to : ~ 7

+ — match garage doors —

15 deg. c/band custom To |

orb sheet roof

 

 

 

 

            

 

 

15 deg. c/bond custom

ea orb sheet roof

awnings on struts fixed * fT stone capping to
= block wail at balcony

 

 

 

 

 

 

 

 

 

 

 

8 deg. awning roof

 

9
T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           

    

with painted steel to wall beyond
2 supporting struts
ol fixed to wall —— awnings on struts fixed
Permeable awnings to wall beyond
x ‘on struts fixed o FL
a Ld
2 to wail beyond 3 cr
T
fence beyond
2 2m H rendered block fence Ns
N selected pool fence &
LS 2m H (intemaliy) te to si
rendered gate to side access
boundary walls FLL a pe ee ee
' t
_ . . 1 compacted fill base
KY) RC block retaining T ca fa a a ee ce a ne a ee thd ea a a a a L a ls en ne ie we
“= 2 natural ground level pe me em —wall 8 garden areas L_ paved slab around pool area common fence wall 1 { natural Oeted alin
° garden bed ple alumin. handail and belustrading garden bed conerete in ground 7 anne nen asson handrail & balustrading
nerete in QFOUNG Lenn ener prr rrr rer law black walt
above & between rendered core filled Panellift doors to allow selected 2m H WESTE R N E L EV. AT | O N swim poo! shelt over law black wal
E ASTE RN ELEV, ATI O N block walls tp bstcony perimeter to allow flow though of breezes gate / fence picoated alumnin,
flow through, of breezes. SCALE 1: 100 doors & windows
SCALE 1; 100
|
Ae:
206mm H vents - painted steel mesh
to match garage or timber louvre.
CL
permeable P/C
Alumin. awnings
8
a 2000 H rendererd black wail
common fence
st = An or 7 U 0 = = pe
%] FL ye. . ff — pool sal safe gate & fence
i) rrr re |
3 _. je .
cL
3
@
NI
Fu
3
OR ee natural ground level ~ ~ ~
opening . . . i
downpipes with rainheads concrete in ground
connected to council <— swim pool shell
stormwater system paved courtyard
pic alumin. h’rail & balustrading between
low rendered block walls to balcony edge
SCALE 1: 100
permeable P/C
Alumin. awnings
2000 H rendered block
{ walt common fence
pool safe gate & fence
ee a a ee a ee ee a ee a a ee ee ee a ee ww ee ee
t
i
| SCALE 1: 100
| BUILDING APPROVAL
FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
DESIGN / DRAWN : BUILDER = 4 CONSTRUCTIONS | SCALED MEASUREMENTS, VERIFY ALL ON SITE (NOT FOR CONSTRUCTION )
ROBERT PATTERSON -
QBSA Lic.No. 21815 COPYRIGHT : No reproduction of all or part DIMENSIONS AND LEVELS PRIOR TO THE
QBSA Lic.No. 1095554 : - - - CONSTRUCTIONS PROPOSED DUPLEX LOTS 1 & 2 AT 23 EDWARDS
i be (ON 3449 1899 fax : (07) 5447 1714 of this djawing may be undertaken without the COMMENCEMENT OF ANY CONSTRUCTION. KJ one: Ca e207

  

 
    

OR TO NOTIFY DESIGNER IMMEDIATELY eHENT— ——_——-{@8-BESERIFHON———-
OF ANY DISCREPENCIES.

 

 

DESIGN to DETAML —™* O40 394 964 €  bkonstobigpond.net au ISSUE DESCRIPTION

   

Page 85

[—— neighbouring trees shown dashed

XN ,

 

    

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
  

  
 
 
  

  
 
  
 
   
 
    
 
  
  
  
    
  
  
 
 
 
 

 

 

 

 

   
 
    
 

 

 

 

 

 

 

 

 

 

 

 

 
  
  
  
  
  
   
 
  
  
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
    
  
  
   
 

 

 

 

 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

   

a 2x Tbebchina Stone 100. 2x Tibouchinaalstonile 100 LANDSCAPE PLAN SPECIFICATIONS AND GENERAL NOTES
See -5x Tibpuchina joules 300mm —~ 5x Tibouchipa joules 300mm SCALE 1:1000n At
Cycas revoluta 45L — 3x Cycaé revolwia 45L 1.Excavation and drainage. 7. General Planting.
| oa PROJECT DESCRIPTION Break up and remove any excess concrete slurry. Excavate ; |
2x Cassia Queenstandica 200L 3x Cassia colutecides 300mm ue ,——~ 3x Cassia colutesides 300mm — 2x Cassia Queensiandica site soil to a depth of 100mm, Break up subgrade to a depth Plants to be supplied by Owners or Landscapers Nursery choice.
] - of 100mm. Drainage to be incorporated in all garden areas Plant sizes 8 and Conditions are tobe approved by the
enclosed by hard edgings. or iscaper prior to planting.
| LOT NO.S 1 & 2 ON GTP 482 OR RP 81559 by ging Place plants according to plans & specifications,
PARISH OF NOOSA o Refer discmpencies_to Owner and Designer prior to planting.
/ = weld! 2. Garden soil supply. Ensure massed beds are placed & planted at equal
6x Beknum nidus 200mm 5 x= 2 et 6x Blekneum nidus 200mm COUNTY OF MARCH Gardens to be filled with premium grade organic garden soil. cetres unless otherwise noted.
(Fems) ‘ (Fems) i to al inage 3 All trees must be planted a min. of 1000mm from
LOCAL ORITY : NOOSA COUNCIL Soil to be mounded to allow good drainage (max 1:3 grade) a
trees Ashrubs 2m aiay hy x ~ Nhs AUTH : slow release fertifiser is to be incorporated al recommended radergoune senices. be confirmed on si
from manhole cover’ - ~ 4 TOTAL ALLOTMENT AREA: 613m Sq rates.upon planting. . nor to oxen? fmed on site by contractor,
1x Plumera obtusa 100L @ PAVED OR TURFED AREA Sela b . PAVED TURFED AREA 1x Ph btusa 100L Ensure silt-traps to council requirements have been instatled prior to excavation.
Frangipani Yellow / White i on 7igN 9x Bauhinnia corymbosa ges x Piumera ol fellow 1 Wei prier to soil delivery Double stake all trees over 1.5m high as per detail.
evergreen 9x Bauhinnia corymbosa 9x Clivja rpiniata Frangipanni Yelow / White evergreen Triple stake ail trees over 2m high as per detail.
Soak plants thoroughly before remaving from container.
Understorey : (ferns) SS Gina ca = ney i fem) —_ we Paved surfaces.” ~ Remove Carefully & inspect rootball, remave old matted
Polystichum ~~ ; Ctivia . . x ui Coiled roots to expose young roots.
bE 7x Bromeliad species 200mm 7x Bromeliad species 200mm Turfed & Garden Bed areas are edged by concrete pathways, Do not mix soil with mulch.
PLUNGE POOL steppers steppers PLUNGE POOL kerbing or treated hardwood edging as per detail. Fill hole with water & allow to drain before planting.
stone creek —. stone creek 27x Hymenocallis littoralis 150mm Ensure finished surface levels are flush with adjascent surfaces.
27x Hymenocallis littoralis 150mm water-feature on stone wall water-feature on stone wall tT Spider Lily Grade evenly & smoothly between finished surfaces. 8. Maintenance.
Spider Litty refer section B fefer section B . .
2x Eleocarpus eumundii 100 L I 7 — 2x Eleacarpus eumundii 100 L 4. Irrigation rodeo basic The woul nebvae weenie panmtzined on a
fe id di . it irements,
== A fully automated and programmable imrigation system is to be Rertpmance for pest and dise ‘evilising movin ana eaging.
provided to alll planted areas. The system should be installed Developer to specify a maintenance scehdule to council's approval.
30x Anigazanthos species 150mm 1 PAVED AREA TIRE rr rn nnn nn nnn nn € ‘ 4 as inconspicously as possible as so not to detract from the
(Kangaroo Paw) or wei LL PAVED AREA 5 eg 30x Anigozanthos species 150mm surroundings. The system should provide regulated water to
Strelia reginae bd a wt Q (Kangaroo Paw) all areas. 9, New Turfed areas
, wn
es] j t eo OD ly o Finished Turf grades / contours to be generally smocth undulating,
8 ' I 7 ! a 5. Mulch co-ordinate with developer to ensure ail levels are appproved
l 1 , . prior to spreading topsoil.
t All gardens to be mulched with hoop fines to a minimum depth A a ‘i
3x Raphis Excelsa 300mm i | \ ‘namo grass | af 75mm. Mulch to be graded away from garden edges and fi depressions, and provide tron fal,” Pin of *00mm.
i ( I tet plant stems. il from hole with mulch. Developer to supply selected turf as per plant schedule.
er | |___.__ Selected stane pavers 1 Understorey : 200mm }0 nat mix soil 0 mutcn. Water in well, maintain soil moisture until established.
qd x I t Crotons 6 ea. side / 12 ‘A Grade Wintergreen or Greenleas Park Couch Variety
i al 2x Dracena Marginata 45L | b Cordyline species 6 ea. side / 12 6. Outdoor Lighting.
Ral I Lomandra 12 ea. side / 24
‘|! t Selected Pool safe glass J (“3 The complex should be well fit but installed inconspicously
: I gate & 1200H glass fence t along paved access areas, seating and other feature
2x Raphis excelsa 300mm ——E7 Bae ! ! S| [> e€ garden areas. The lights to be installed as per developers
a i | specification and selection.
e| be
!
+ a) | w
RS! | 8
— Lx! Lo =
fo | P PLANT SCHEDULE
a BOTANICAL NAME COMMON NAME COMMENTS congaqer
3x Raphis Excelsa 300mm | i t 1 5x Syzigium Aussie Southem 100 L
I t
a | | P TREES AND PALMS AND LARGE SHRUBS
: | I ° . y o
s 3 Syzigium Aussie Southem { Lilly pilly 45L 5 |
fs ° rR Syzigium Aussie Southemn Lilly pilty 100L 5
™N N
; Selected impervious non-slip ° Border : Cassia queensianica Leichhardt bean Tree 200L
i pavers as selected by owners. PAVED . 12x Altemanthera dentata Rubra 150mm
PAVED AREA concrete slab i i
of 100mm compacted crusher dust ° Cupaniopsis anarchoides L Tuckeroo 100L 1
d| High Hedge : Delonix regia Poincianna 100L 2
5x Syzigium : ° &x Melaleuca Revolution Gold T tT
Aussie Southem 45L. ~q Eleaocarpus eumundii Quandong 45L 8
post tec soe Hs aff p-----------------+ = bx] Melaleuca quinquinarvia Weeping Paperbarks 400L 6
sx] mA aot ' | mA ae i Metrosiderous thomasii NZ Christmas bush 100L 2
~~ a“ - Ss ~ “7 : : .
Sec i | >< Plumera obtusa Frangipani Yellow / white / evergreen 100L 3
a 7 ~~ “7 ~ oo .
ao ~e thy “7 ~e t Plumera rubra Frangipani Rubra evergreen 100L 1
1x Metrasiderous thomasi 100L - ~S Leo ~s - na Natrasider pus thomast 100 L r
N2 Xmas bush . i mas bus! Randia fitzlani Randia 45L 6
s y | Oe Sirelzia reginate or Spathodea compandutata African Tulip Tree | 45L 2
" i. i ay —~ 12x Metrosiderous Fiji Fire 200mm
“i —~ | ° _ ot Hymenocaliis littoralis (Spider Lilly's) 4 Stenocarpus sinatus Qid Fire Wheel Tree | 100L 4
4x Stenocarpus sinatus 100 L », < FE ndii 100 L
Y inni: ax iS eumundii . 1 es x :
1x Plumera rubra 100L a £ 15x Callistemon ‘litte john’ vanegats 200% +. pus Tibouchina lepidota ‘Alsonville Alstonville Tibouchina 100L 4
Frangipanni red evergreen 200mm (Low Ginger) x E
e* |} Feature Tree: 100L on st SMALL - MEDIUM SHRUBS
Ea — x Cupartigpsis anarchoides 100 . e 33 1x Plumera abtusa 1001 Alpinnia variegata Dwarf Ginger 200mm 5
o 12x Callstemon ‘ite john uekeraa 12x Callistemon ‘little john’ 200 ©} Frangipani Yellow / White evergreen +
oH 2x Anigazanthos (Ka Pp 12x Anigozanthos (Kangaroo P: Caltistemon “little john” Bottlebrush 200mm 39
a igazanthos (Kangaroo Paw) PAVED DRIVE-WAY | 200mm ' ;
1x Spathodea compandulata He Cassia colutecides Cassia 300mm 6
, t _[ 1x Spathodea compandulata 4: — . t
3 3x Randia Fitzlani 45i. ee. Selected Motorized Slidin: NY wee 3x Randia Fitzlani 45L Cycas revoluta Cycad [ 45L 6
§ ple. atumin, fence 2mm H pete i . * pic alumi Gate 2mH Y . i Dracaena marginata Dracaena 45L 2
= y . 4 i, .
ef’ Box Melaleuca clare tps 200mm ! Melaleuca tops 200mm Melaleuca ‘Revolution Gold Myrtle 300mm 6
s 8 ‘9x syzigium Tiny Trey 200mm. . we syzigium Tiny Trev 200mm Melalueca "claret tops" Myrtle [ 200mm 18
© 1x Delonix regia (Pofjcianna) 100L S cv SK fee ‘44 Delonix regia (Poincianna) 100 L Metrosidarous ‘Fiji Fire’ Fiji Fire 200mm 12
6x Lomandra 200m: Lomandra 200 .
180d0' 20.117/m omat ™m Raphis excelsa Lady Palm | 300mm 40
Groundcovers - Groundcovers : Syzigium tiny trev Small Leaved Lilly Pilly 200mm 18
Evotvis pilosus - blue fi Evolvis pilosus - blue flower 6 ea. side / 12 , _ ee
Beuhinnia corymbosa Beauhinnia corymbosa - 6ea. side / 12 Tibouchina joules Tibouchina joules 300mm 10
Altemanthra dentata rubra aM aleuca guinguinervia 1004 kerb 3x eon pan quinquiner Altemanthra dentata rubra - 12 ea. side / 24 —T
ping Paperbar crossover falls & ing Weeping Paperbarks
tx Caesetpinnia ferea 200. to-counal requirements, | ti Cacealpinnia torrea 200L TUFTED PLANTS AND GROUNDCOVERS & CLIMBERS
Leopard Tree Leopard Tree Altemanthra dentata rubra Joy Weed 150mm 36
1,613 1,620 2.250 2.250 4,650 2.250 2.250 1.620 _ 161 Anigozanthos flavidus {__ Kangaroo Paw 150mm 60
#4 # a # +t # # #1620. 1.813
fence post centres Anigozanthos flavidus Kangaroo Paw 200mm 24
Bauhinnia corymbosa Phanera 200mm 30
Beknum nidus Cicad / Fem { 200mm 12
Bromeliad species Bromeliad 200mm 14
Clivia miniata Clivia L 200mm 12
Croton species | Croton 200mm 12
Cordyline species Cordyline 200mm 18
1
Evolvus Glomeratus ‘Pilosus' Evovlus biue flower groundcover 150mm 24
Hymenocallis littoralis Spider Lilly | 150mm 54
a i ete ee oe eee _ vee ne - ee ee ee ifoli - - ee MatRush: - ee mi T 36 _ _. ee a
TO ~~ ” _ Polystichum formisium Sword Fem 200mm 5
Strelizia reginate Bird of Paradise 150mm 5
Nomo grass Nomo
pn
. . FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
DESIGN / DRAWN : HORTICULTURALIST : BUILDER: i CONSTRUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE (NOT FOR CONSTRUCTION }

GREENSCAPES NURSERY & DESIGN
ROBERT PATTERSON DIMENSIONS AND LEVELS PRIOR TO THE

   

  

 

QESA Lic.No. 21815 . ‘,
Richard Leathers COPYRIGHT : No reproduction of al? or part
DID oe rabert@designtodetalcomau Cert. Horticuure fax: (071 5447 1714 of this drawing may be undertaken without the COMMENCEMENT OF ANY CONSTRUCTION. Kj CONSTRUCTIONS PROPOSED DUPLEX LOTS 1 & 2 AT 23 EDWARDS
m:0401 394 964 2: [email protected] m | 0409 471 714 express written permission of the author. CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY CLIENT JOB DESCRIPTION NOOSAVILLE [Revised issue | 10-01-08
DESIGN to DETAIL m : 0403 709 454 4 iWdconstblgpond.neta ‘OF ANY DISCREPENCIES, [ DESCRIPTION

        
  

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.