Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
579411129 Buipung BSOON Aa
INTEGRATED PLANNING ACT 1997
Sheers Se
AYeye
Part A
Common details
Identification of the premises the subject of the application
1. Can any part of the premises be identified by a street address or lot on pian description?
[1 No - Answer Q1(a)
1{a) Does the application only involve a mobile and temporary environmentally relevant activity (ERA)?
CO) No-Gotoa2
C1 Yes- Complete Table A staling each local govemment area in which the mobile and temporary ERA is proposed to aperate. Then go
to Q9
Table A
Name of each focal government
(1.
O Yes ~ Complete Table 8 and answer Q1(b) and Q1{c)
Table B
Lot on plan description
mater re Street name ‘onatty one port = eer — ine separie om) Local government area
number | fag. mS Plan number
lt. 23 | Eerie NGGSAV LUE LN 2 1CTP 451 BISSF4 N@OSA, COOL
TOSS RISS4
1(b) Can the address be further described by shop/tenancy number or storey/level?
WY No
CD Yes- Complete Table C
Table
Shop/tenancy number Storey/level
ft.
1(c)_ Is any part of the premises strategic port land under the Transport Infrastructure Act 1994?
No
C2. Yes - Complete Tabie 0
Table D
Lot on plan description Port authority for the lot
fr
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.