3.00 GEOLOGY & LABORATORY TESTING
3.01 SUBSURFACE CONDITIONS

The sub-surface profile at borehole 1 located 7m from the front boundary and 1.5m from the
RHS northern boundary indicated 0.70m of very loose grey/yellow grading to white Sand
overlying a thin layer of black Silty Sand between 0.70-0.95m depth. Below 0.95m the naturally
occurring Sand was loose to medium dense with depth. Between 3.3-4.1m the Sand was weakly
cemented and dense/very dense. Below 4.10m depth loose “marine” Clayey Sand was logged to
termination depth at 4.4m.

3.02 ALLOWABLE BEARING CAPACITY

Based on drilling rates and with reference to the Dynamic Cone Penetrometer tests a safe
presumptive bearing capacity in excess of 100kPa would be available within the medium dense
Sand below 1.0m depth.

3.03 SITE CLASSIFICATION

Based on the findings of the Site Investigation and in accordance with Australian Standard
AS2870-1990 "RESIDENTIAL SLABS & FOOTINGS" the site may be classified as: "P"

The “P” classification is attracted due to the presence of up to 0.7m of loose Sand Fill located
over the naturally occurring Sand.

4.00 ENGINEERING ASSESSMENT & RECOMMENDATIONS
4.01 FOOTING DESIGN

Based on the above we would recommend that all load bearing footings and slab on ground be
supported on a grid of either 450 dia bored concrete piers, 600 long backhoe piers or steel screw
piers found to a minimum depth of 1.2m below the existing surface level into the medium dense
Sand.

4.02 SITE PREPARATION

The confines of the building site shall be stripped of all topsoil containing vegetable and other
organic materials.

On sites where cutting and filling is to be executed the fill material and also the top 150mm of
natural material in the cut section shall be compacted in accordance with AS2870-1990
SECTION 6 Construction requirements as follows.

Civil & Structural ¢ Design & Drafting « Residential ¢ Commercial « Subdivisions

John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the
JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.