Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
JTC CONSULTING ENGINEERS (a) SANDS Density index of not less than 65% according to as 1289.E6.1 where compaction test is in accordance with AS1289.E5.1. Alternatively a satisfactory blow count of 7 or more per 300mm when tested in situ with a penetrometer to AS1289.F3.3. may be used. (b) CLAYS Dry density ratio according to AS1289.E4.1 of not less than 95% where the compaction test is in accordance with AS1289.E1.1. (standard) or 90% in accordance with AS1289.E2.1 (modified). Clay fill should be moist to allow compaction and reduce subsequent movement. 5.00 NOTES - SITE MANAGEMENT 5.01 SOIL MOISTURE VARIATION IN SUB SOILS Differential moisture under a structure due to extremes of wetting or drying is the major cause of movement in clay sites. To ensure the natural moisture content of the soil remains reasonably stable, gardens, trees, shrubs, hose points, and septic tanks should not be located within 3m of the residence. All downpipes should either be discharged directly into the street stormwater system via underground drainage or to spitters discharging a minimum of 3m away from footings.. Our recommended drainage requirements for residential construction are shown on Appendix A attached hereto. Reference should also be made to the "Guide to Home Owners on Foundation Maintenance and Footing Performance" published by the C.S.ILR.O which forms part of this report. 5.02 NON STRUCTURAL DISTRESS There are many factors that affect the performance of a structure. The two (2) most commonly occurring forms of house distress resulting from non-structural causes which are. 1. Direct tension slab cracking due to concrete shrinkage. 2. Growth cracking of brickwork. Concrete shrinkage is resisted by the restraint imposed by the beam embedment into the soil and the steel reinforcement. Civil & Structural + Design & Drafting « Residential ¢ Commercial ¢ Subdivisions John Titmus Consulting Engineers Pty Ltd ACN 083 070 651 as trustee of the JTC Consulting Engineers Trust ABN 34 832 895 535 trading as JTC Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.