Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
NOTE: NOTE: NO CONCRETE IS TO BE PLACED 1. THIS DRAWING TO BE IN CONJUNCTION WITH UNTIL THE INSPECTOR OR ENGINEER HAS INSPECTED THE FOLLOWING: AND APPROVED THE EXCAVATIONS & REINFORCEMENT IN PLACE. THE CONTRACTOR (6) FOOTINGS AS DETALED INSPECT AND CONFIRM EXCAVATIONS PRIOR (b) SITE INVESTIGATION REPORT (S TO CAREFULLY READ THE DESIGN DRAWINGS TO THE PLACEMENT OF ANY CONCRETE. . (c) ARCHITECTURAL DRAWINGS AND ENSURE ALL CONSTRUCTION IS IN ACCORDANCE CON ! [—~—— REFER TO TYPICAL BLOCK I le Y INDICATES 800 LONG BACKHOE PIERS Ws @ 2400 CRS. FOUND MIN 2000 BELOW FINISHED SURFACE LEVEL. INTO MEDIUM DENSE LIGHT GREY SAND. ENGINEER TO i FENCE DETAILS (d) APPROVED COUNCIL PLANS WITH THE DETAILS INDICATED. (0) CSIRO BTF $8 GUIDE : B1 2, SHOULD THE SUB-SURFACE SOIL PROFILE VARY Wy FROM THAT SHOWN IN THE SITE INVESTIGATION Yi. LLL. LYL. — FZ Ut. i REPORT, NOTIFY THE ENGINEER IMMEDIATELY, | DO NOT POUR ANY CONCRETE. | 3. CC DENOTES CRACK CONTROL JOINT LOCATIONS, i | CUT EVERY SECOND STRAND OF FABRIC CROSSING BRITTLE FLOOR COVERINGS (ie TILES) i| 400mm THICK SLAB JOINT. PROVIDE TOOLED JOINT WHILE CONCRETE IS Note: AS2870-1986 CLAUSE 5.3.7 REQUIRES STILL GREEN. THAT WHERE BRITTLE FLOOR COVERINGS ARE $L82 FABRIC 30mm MIN TOP COVER \ . TO BE USED THE AMOUNT OF REINFORCMENT -N n No 4, SLABS LOCATED ON UNCONTROLLED (UNCOMPACTED) WITHIN THE SLAB SHALL BE INCREASED TO a N FILL TO HAVE MASS CONCRETE PIER FOOTINGS S192 OR AN APPROPRIATE FLEXIBABLE BEDDING LOCATED UNDER BOTH INTERNAL & EXTERNAL BEAMS. REFER ENGINEER FOR PIER LOCATIONS. 5. ALL EARTHWORKS TO BE COMPACTED TO 95% (STANDARD) OF ITS RELATIVE DRY DENSITY SYSTEM SHALL BE USED OR A MINIMUM PERIOD OF THREE-MONTHS SHALL ELAPSE FROM THE TIME OF CASTING TO THE PLACEMENT OF THE TILES, THE CONTRACTOR IS TO CONFIRM WITH THE OWNER SUCH AREAS. REFER SITE INVESTIGATION REPORT 6 UM CONCRETE STRENGTH fc = 20MPa . NAL SLUMP 80mm 7. LAP ALL REINFORCEMENT 40xNOMINAL BAR DIA. 8.. LAP ALL REINFORCEMENT AROUND CORNERS 40x BAR DIA. 9. VIBRATE ALL CONCRETE 10. BAR CHAIRS SUPPORTING SLAB FABRIC TO BE NO MORE THAN 800MM APART. (AT LAPS 400mm) 41. NOTIFY ENGINEER IMMEDIATELY OF ANY DICREPENCES. 42, BRICKWORK IS TO HAVE CONTROL JOINTS LOCATED AS PER THE FOLLOWING SCHEDULE: REQUIRED CENTRES} SITE CLASSIFICATION 8m CENTRES 'S & 'W’ 6m CENTRES ‘W TO BE ASSESSED e : | L JOINTS ARE TO BE CONSTRUCTED IN ACCORDANCE . | | IE RECOMENDATIONS OF TN&1 OF THE CEMENT AND No Ae TIE Wiz Zr THIS DRAWNG IS TO BE READ IN CONJUNCTION WITH THE GEOTECHNICAL AND SITE INVESTIGATION REPORT PREPARED BY JTC CONSULTING ENGINEERS REF. 207196 DATED 03/12/07. SITE CLASSIFICATION *P* SS Z YW lL B1 CONCRETE ASSOCIATION OF AUSTRALIA. CONCRETE CURING: B1 ADEQUATE PERFORMANCE OF CONCRETE DEPENDS ON : PROPER CURING TO CONCRETE: 4/ FOR FINISHING LARGE SLABS AND SLABS POURED -oN (N RAPID DRYING CONDITIONS SUCH AS HIGH DRIVEWAY - 32MPa CONC. / \ USE CONFI EVAPORATON RETAROENT AND) 400mm THICK. SL82 FABRIC \ USE "CONFILM” EVAPORATION RETARDENT AND \ FINISHING AS IN ACCORDANCE WITH THE TO DRIVEWAY TYPICAL \ 30 ISAs ceecirEn \——7 —\REFER UNDERGROUND TANK FINISH MANUFACTURERS SPECIFICATIONS MANUFACTURERS SPECIFICATION. 2/ COVER CONCRETE INCLUDING SIDES WITH PLASTIC OR ACRYLIC CURING COMPOUND AS SOON AS THE ‘SLAB CAN STAND TRAFFIC LOADS. FOOTING BEAM LAYOUT NTS. FAGURED DIMENSIONS TO TAKE PRECEDENCE oveR| APPROVED 207196 PROPOSED DUPLEX 4 Easton Street (Cnr Maud Street), KJ CONSTRUCTIONS SCALED MEASUREMENTS. VERY ALL ON STE [pau SCALE 1: 100 UNO O Maroochydore QLD 4558 23 EDWARD STREET DIMENSIONS AND LEVELS PRIOR TO THE we [DATE OCT 2007 Telephone (07) 5443 6585 IENCEMENT OF ANY CONSTRUCTION. CoM EN DRAWN MT NOOSAVILLE - Facsimile (07) 5479 1754 Postal Address PO Box 5960 Maroochydore BC OLD 4558 ! A_[15/10/07 | WORKING DRAWING COAT REPENS, ! ISSUE| DATE EVENT. CONTRACTOR TO NOTIFY ENGINEER IMMEDIATELY crs SHEET 001 CONSULTING ENGINEERS [email protected] adgsuncoast.com Web 5 Email CLIENT JOB DESCRIPTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.