Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013

of 105

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

       A6035/21/D01      E     Stormwater Layout Plan, prepared by Alta    25/05/2021
                               Engineering

       A6035/21/D02      E     Stormwater Drainage Details, prepared by    25/05/2021
                               Alta Engineering

       A6035/21/D03      B     Stormwater Drainage Setout Plan, prepared   25/05/2021
                               by Alta Engineering

       A6035/21/WQ01     E     Stormwater Treatment Catchment Plan,        25/05/2021
                               prepared by Alta Engineering

       A6035/21/WQ02     E     Stormwater Quality Layout Plan and Notes,   25/05/2021
                               prepared by Alta Engineering

       A6035/21/WQ03     E     Stormwater Quality Bio Basin Calculations   25/05/2021
                               and Details, prepared by Alta Engineering

             CD-001      J     Vegetation Management Plan, prepared by     2021.05.28
                               Project Urban

             CD-002      L     Landscape Plan – In Ground, prepared by     2021.05.28
                               Project Urban

             CD-003      K     Landscape Plan – In Ground, prepared by     2021.01.25
                               Project Urban

             CD-004      I     Landscape Plan – On Podium, prepared by     2021.01.25
                               Project Urban

             CD-005      I     Landscape Plan – Boundary        Fences,    2021.01.25
                               prepared by Project Urban

             CD-200      L     Construction Details, prepared by Project   2021.01.25
                               Urban

             CD-201      C     Planting Schedule, prepared by Project      2021.01.28
                               Urban

             CD-202      B     Planting Schedule, prepared by Project      2021.07.07
                               Urban

      CURRENCY PERIOD
59.   The Currency Period for this development approval lapses if the development has not
      substantially started by 17 February 2024, unless an application to extend the currency
      period is approved by Council.
      PRIOR TO COMMENCEMENT OF WORKS
      Engineering
60.   All necessary approvals from external service providers (e.g. Unitywater) and external
      parties on which the development works are proposed have been obtained and a copy
      supplied to Council.
61.   A condition report of the drainage system must be completed for agreement prior to the
      prestart meeting. The condition report is to include a CCTV inspection of the existing
      pipe and must include at least 50m upstream and downstream of all works.




                                             9

Log in to download the original (Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.