Original source · versioned page text
Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
62. A condition report including photographs of the frontage of the site must be completed
and submitted to council prior to the prestart meeting.
63. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council prior to the prestart meeting.
64. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500.
The pre-start meeting must include the relevant parties for the following aspects of the
works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
65. A Construction Management Plan must be submitted to Council prior to the pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased;
iii. Proposed fencing to the site during the construction phase of the
development;
iv. Adequate parking arrangements for construction workers;
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures;
c. Provision for safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
d. Works programme identifying key components of the works and their respective
durations;
e. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues;
f. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
g. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details;
h. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures;
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.