Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013

of 105

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

     Bioretention Devices - Education
115. The development shall be provided with approved permanent signage that is
     deigned in accordance with Noosa’s Look and Feel document to educate the
     public on the function of the bioretention basin. The wording for the signage for
     each bioretention basin is to include: “BIORETENTION BASIN - This bioretention
     basin reduces the pollution of our waterways by reducing the amount of heavy
     metals, litter, suspended solids, and nutrients discharged to Lake Doonella”.
FOLLOWING CONSTRUCTION / PRIOR TO THE ON-MAINTENANCE INSPECTION
Certification
116. Upon completion of the work a certificate must be issued by an RPEQ certifying
     that the works have been constructed in accordance with the Operational Works
     permit.
117. A condition report of the drainage system must be completed for agreement prior
     to requesting the works to be accepted On-Maintenance. The condition report is
     to include a CCTV inspection of the existing pipe and must include at least 50m
     upstream and downstream of all works.
As Constructed Plans and ADAC XML Files (Council)
118. Prior to acceptance of civil works to become Council assets “On Maintenance”,
     satisfactory “As-Constructed” records must be submitted to Council. The bundle
     of “As Constructed” information must include:
     v.    As-Constructed Engineering Drawings. Data is to be submitted in an
           electronic drawing file format (.dwg), with all plans clearly endorsed “As-
           Constructed”, along with the accompanying hardcopies (PDFs of the As-
           Constructed .dwg drawing files), and;
     c.    ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
           Constructed) prepared in accordance with industry standards and recorded
           in “MGA - UTM56 / GDA94” projection.
     d.    Please Note: Further information and advice relating to the as-constructed
           drawing presentation, as-constructed survey capture and associated
           guidelines for preparation of a compliant ADAC XML digital file are available
           on the webpage titled “As-Constructed Guidelines” and accessible at the
           Noosa Council Website: Planning & Development / Development Tools &
           Guidelines / As-Constructed Guidelines.
     e.    The “As-Constructed” drawings will require certification by a:
                 i.    Qualified experienced Civil Engineer (RPEQ) confirming design
                       intent and conformance with applicable standards and
                       specifications, along with the relevant descriptions of assets,
                       services and structures and;
                 ii.   Licensed Surveyor in regard to the cadastral and locational
                       information, levels and applicable survey datum.
     f.    The data must be in accordance with Council’s “Planning Scheme Policy 6
           – Engineering Design Standards”, and fully detail the levels for all
           engineering works including but not limited to the drainage network and
           structures, finished ground and pavement surface levels.




                                      17

Log in to download the original (Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.