Original source · versioned page text
Attachment K - HSTP Design
Very large file (11.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
5.4 Separation Distance Requirements. One of the most important parameters to consider in the location of Land Application Areas is the separation distances, both vertical and horizontal. inappropriately selected ground may contribute to the pollution of surface water and groundwater, ponding and eutrification. Surface Horizontal Separation distance requirements Poorly or Feature Primary Secondary hod Permanent watercourses (lake/stream/river) 50m 30m 10m Intermittent watercourses (dams/channels/weirs) 50m 30m 10m Bore (human and or domestic consumption) 50m 30m 10m EMT boundary unlined/open stormwater drainage 50m 30m 10m Property boundaries/paths/walkways 4m downslope 2 m upslope boundary . 10 m spray 10 m spray Dwellings/play areas 15m 4m sub/cvrd | 4m sub/evrd Swimming pool (water edge) 6m 6m 6m Inground watertank 15m 6m 6m Vertical Separation distance requirements : , Advanced Depth of unsaturated soil to Primary | Secondary Sevoridary Permanent watertable 12m 0.6m 0.3 m Bedrock/hardpan 1.2m 0.6m 0.3m 5.5 Effluent Quality. Effluent quality requirements must be confirmed with the relevant local council before proceeding and when tested shall comply with the following; Effluent Quality Primary | Secondary . sain Biochemical Oxygen Demand (mg/It) 120-240 <20 <10 Total Suspended Solids (mg/It) 65-180 <30 <10 Total Nitrogen (mg/It) 36-45 <30 Total Phosphorous (mg/It) 6-10 <10 Thermotolerant Coliforms (organisms/100 mL) <200 <10 Unearthed Geotechnical P/L. 11 Design Report 023-038
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.