Capital Program 2024/2025 Delivery Status · Report

of 8

Text shows just the words. Original shows the document exactly as it was published.

SERVICES & ORGANISATION COMMITTEE MEETING                                     12 AUGUST 2025


•   Doonan, Noosaville/Eumundi Road Landfill Expansion of RRA
•   Kin Kin, Wahpunga (Trail 4) & Woondum (Trail 3) Trail Renewal - Trail Works, Civil Works and
    Fencing, Gates & Signposts
•   Noosa Heads, Cooyar Street, Stormwater Bio-basin Upgrade Detailed Design
Major Programs
The below summary provides an update on a selection of major programs within the 2024/25 Capital
Works Program.

Reseal Program
The Road Reseal Program has expended $5.1m of the $5.1m budget. The following roads on the
annual reseal program were undertaken during Q4 2024/25:
•   Cooran, Railway Road (to Coles Creek Road)
•   Noosaville, Elizabeth Street (Roundabout at James Street)
•   Noosaville, James Street (Gympie Terrace to Elizabeth Street)
•   Peregian Beach, David Low Way (from Lorikeet Drive heading south)
•   Sunrise Beach, Wollomia Way (from #35)
The following roads on the 2025/26 annual reseal program were undertaken during Q4 2024/25:
•   Noosaville, Eenie Creek Road (Reef Street to back of Sternlight Street)

Heavy Patching Program
The Road Heavy Patching Program has expended $1.4m of the $1.5m budget. The following roads
received patching during Q4 2024/25:
•   Black Mountain, Black Mountain Road

Pathway Program
The Shire Wide Pathway Program continued into Q4 of the 2024/25 financial year. Pathway
renewals completed during Q4 included:
•   Cooroy, Kauri Street
•   Noosaville, Quota Park
•   Noosa Heads, Seagull Park
•   Shire Wide - Pathway Renewal Program:
    1. Noosa Heads, Alex Dan Park
    2. Noosaville, Gympie Terrace
    3. Tewantin, Moorindil Street
The following pathways have had their design completed during Q4 2024/25 and have been
reprofiled for construction to be undertaken within the 2025/26 financial year.
•   Pomona, Summit Road
•   Shire Wide - Pathway Renewal Program
•   Cooran, Bridge Street
•   Cooroy, Diamond Street
•   Noosa Heads, Noosa Parade

Used in these records

About this file

File size
278 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Report.pdf · 278 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.