Original source · versioned page text
Attachment 4 - Revised Architectural Plans_LR
Plans and drawings: the text below has words only, no drawings.
Rev Description Date
1 2 3 4 5 6 1 Preliminary Issue 10/07/24
10930 4650 6150 6150 6000
600 2000 8930 16950 1200 3600 1200
150 1850 150 8780 150 16650 150
2000 150 64 4010 92 2518 92 1940 64
3400
Washdown bund
Hc Bol Bol Bol Bol
A
150
150
1500 D D Dp
W1 1500 G.15 G.16
2100
Exit
D
3700
G.17
Gate
3700
3550
MSB
2400
W
150
150
G.01 A/C A
B
150
WD08
Dp
64
64
W2 Wc Wc Wc
Store
W1
Wc Mv
W
3636
G.02
W3 Mv
W3 U
F-Wc M-Wc
Dp
6240
6090
Til
Chainwire
Meeting
6148
FRL: 90/90/90
D Til
92
Cpt V G.07 U
W
W3
Workshop
1120
D Epo
Comms
G.03 V
G.06
Entry D Washbay
18000
Con G.08
92
Mv Wc Con
15000
V
D D (bunded area)
Areas
2350
G.01 G.02
Pwd Sh 2300 92
150
Lockers
92
Dp Exit
W3 D Til FFL: 4.35m Name Area
14600
W1
92
G.05 Ews Workshop 273.9 m²
W4
92
Office 182.6 m²
D W3 Store
2200
Washbay 110.5 m²
Exit
3820
W
G.04 Waiting G.03 S
Epo Alfresco 24.8 m²
Vin W2 D Parts Dp
Entry 4.1 m²
G.11 wash
92
595.9 m²
W
W4 G.10 Do not scale drawings. Use written dimensions only
1720
Exit
8060
8360
92
D
Exit
Contractor to verify all dimensions & levels on site prior
D G.10 to commencing any work or making any shop drawings
6790
G.04 Wt
W2 Pit
Lunch
92
D
Vin G.12 W4
W3
4020
W
G.05 Operations W
B
3200
Cpt G.09
Office WD09
Vin call 0411 125 425
Hc email [email protected]
1200
W2 D Exit D D
64
64
G.09 G.13 G.14 post box 5337 maroochydore qld
Dp
C
150
150
qbcc lic. 1070982
W W W Dp abn 33 080 662 473
150
1000
150
Hc W1
G.06 G.07 G.08 Project
92 640 1120 92 2698 64 150
Legend Noosa Bus Depot
150 64 6010 92 4550 64 150 4500 92
Exit- Emergency Exit
Alfresco 5-13 Production Street
Mv - Mechanical Vent
3000
Con Con - Concrete Floor Noosavile, Qld.
Title
50 3050 3050 50 Cpt - Carpet Tiles
Dp - Down Pipe Floor Plan - Ground
Dp Epo - Epoxy Coating
Ews - Eye Wash & Shower
Hc - Hose Cock
6200 3056
Hw - Hot Water Unit Client
Wall Legend
Ref - Refrigerator
Integral Construction
Floor Pan Sh - Shower
Issue
G Scale 1 : 125
Sk - Sink
3 W1 Concrete tilt panel. Natural finish (unless noted otherwise) Til - Tiles Preliminary
V - Vanity Dwn North Point
R2.5 64mm metal stud wall with 13mm plasterboard internal. Vin - Vinyl Sheet GT
2 4 W2 Install bulk insulation as noted. Paint finish. App
Wc - Water Closet
20kg/m³ 92mm metal stud wall with 13mm plasterboard to both sides. Wt - Wash Trough Scale North
W3 Inslall sound insulation batts as noted. Paint finish
As indicated (at A3)
1 Date
10/07/2024 5:35:41 PM
92mm metal stud wall with 13mm plasterboard to both sides.
Elevations W4 Paint finish 0 1 2 3 4 5 6 Dwg No Rev
NOTE: 1:125 1580 - WD02 1
Replace 10mm plasterboard with 6mm villaboard in wet areas. © This drawing is Copyright and is owned by tyson design studio
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.