Attachment 4 - Revised Architectural Plans_LR
Plans and drawings: the text below has words only, no drawings.
Rev Description Date
1 Preliminary Issue
1 2 3 4 5
10930 4650 6150 6150
A
3700
Grid Setout 300
Grid Setout Grid Setout 300
B
Grid Setout 600
Grid Setout
C1 C1
C2
Grid Setout
C1
14600
C3 C4
Do not scale drawings. Use written dimensions only
Contractor to verify all dimensions & levels on site prior
C2 to commencing any work or making any shop drawings
C2
C4
Grid Setout
Grid Setout
call 0411 125 425
C email [email protected]
post box 5337 maroochydore qld
qbcc lic. 1070982
Grid Setout Grid Setout abn 33 080 662 473
Project
Noosa Bus Depot
Ceiling Finishes 5-13 Production Street
Rondo Duo exposed grid ceiling system with shadowline wall
Noosavile, Qld.
C1 angle. 10mm Gyprock 'Freshtone' ceiling tiles - 1200x600 Title
Reflected Ceiling Plan
C2
Rondo Duo exposed grid ceiling system with shadowline wall
angle. 15mm Knauf 'ClimaPlus' ceiling panels - 1200x600 - Ground
Rondo Xpress drywall grid ceiling system with shadowline wall Client
C3 angle. 13mm plasterboard sheet - paint finish
Integral Construction
Reflected Ceiling Plan - Gnd
G Scale 1 : 125
Issue
3 C4
Ceiling joists with 20mm metal ceiling battens at 600crs.
13mm plasterboard sheet - paint finish Preliminary
Dwn North Point
GT
2 4 C5
Roof purlins with 20mm metal ceiling battens at 600crs.
6mm Fibre Cement sheet with jointer strips - paint finish
App
Scale
As indicated (at A3)
1 Date
4/07/2024 3:58:56 PM
Elevations 0 1 2 3 4 5 6 Dwg No Rev
1:125 1580 - WD03 1
© This drawing is Copyright and is owned by tyson design studio
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.