1856-CMP-01 [Prelim] August 2020
4.8 Protection of Existing Infrastructure All existing infrastructure, e.g. road pavement, drainage pipes, conduits, etc. is to be protected and maintained during the construction period. Any damage caused by the Contractor is to be rectified at the Contractor’s expense. It is recommended that photographic evidence of the site and surrounds be collected prior to the commencement of works. It is the Contractor’s responsibility to locate all existing services prior to commencement of works and protect and maintain these services for the duration of the works. 4.9 Existing Services It is the Contractor’s responsibility to locate all existing services (including electrical & communications) prior to commencement of works and project and maintain these services for the duration of the works. Should any services require relocation as part of the works, this shall be carried out by an approved contractor for each relevant asset owner. 4.10 Protection of Adjacent Properties All adjacent properties are to be protected for the duration of the works. No works are to encroach on adjacent properties unless the necessary approvals and the land owners’ consent have been obtained. All existing boundary fencing must be maintained. Any damage caused by the Contractor is to be rectified at the Contractor’s expense. It is recommended that photographic evidence of the site and surrounds be collected prior to the commencement of works. 4.11 Workplace Health and Safety It is the contractors’ responsibility to ensure that the site is maintained to a suitable standard to ensure the safety of all workers and site visitors. Adequate safety signage is to be installed in accordance with the relevant legislation. All site visitors are to hold a minimum General Safety Induction White Card or equivalent. 4.12 Public Relations & Complaint Management Signage shall be erected at the site with contact details of the Principal Contractor and Site Foreman. The site supervisor shall make a record of all complaints. Any disputes are firstly to be resolved where possible by the Principal Contractor, else, report them to the Project Preliminary Construction Management Plan 11 August 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.