Original source · versioned page text
1856-CMP-01 [Prelim] August 2020
1.0 INTRODUCTION This Preliminary Construction Management Plan (CMP) has been commissioned by Stockwell Development Group Pty Ltd and compiled to generally satisfy Advisory Note 4 of the Reconfiguration of Lots Application (RAL18/0023). The CMP addresses traffic management, safe pedestrian access, fencing, water quality management and erosion and sediment control, works program and protection of existing infrastructure for the proposed development at Eenie Creek Road, Noosaville. This Preliminary CMP has been developed in accordance with the New Noosa Plan 2020, Planning Scheme Policy 06 Engineering Design Standards. The CMP addresses the construction phase procedures that are to be implemented by the principal construction Contractor and his subordinate contractors, to ensure that working areas are maintained to suitable standards generally in accordance with best management practices and regulatory requirements. Preliminary Construction Management Plan 4 August 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.