2.0     PROJECT DETAILS

2.1    Description

The development site is located at 28 Eenie Creek Road, Noosaville and is described as
Lot 3 on SP246584. This CMP covers traffic management, safe pedestrian access, water
quality management and erosion and sediment control, works programme and protection
of existing infrastructure in and around the Noosa Civic centre.


2.2      Extent of Works

Works are to be constructed in accordance with the following documents and
specifications:

         ·       Reconfiguration of Lot Application Noosa Council reference (RAL18/0023).

         ·       Engineering Plans 1856-R30–R63, SW01-SW30, EW01-EW10
                 by Barlow Shelley Consulting Engineers

         ·       IECA Guidelines



2.3      Construction Timeline and Work Hours

The approved working hours are 6.30am to 6.30pm Monday to Saturday. Notification is to
be given to Development Assessment of any work that is to be undertaken outside of
normal business hours noted above, Strict approval must be sought from Council prior to
site/operational/building work commencing. No work is to occur on Public Holidays.


A likely exception to this will be spotter catcher clearing which is sometimes required to
occur at sunrise. During the summer months, this is before 6.30pm. As above, written
consent will be requested from Council by the Fauna Management contractor for
permission to carry out spotter catcher works before 6.30am.


A detailed program of works will be the responsibility of the Contractor and shall be
distributed to all consultants and other parties involved in the construction phase of the
project. The program will need to incorporate the following:
             ·    Site establishment and ESC measures
             ·    Earthworks
             ·    Drainage works
             ·    Driveway access
             ·    Landscaping

Preliminary Construction Management Plan                                               5
August 2020
Log in to download the original file

1856-CMP-01 [Prelim] August 2020.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.