4.0     CONSTRUCTION MANAGEMENT


4.1    Traffic Control & Parking

Detailed Traffic Management and Signage will be in accordance with the Contractor
supplied plan submitted to Council before works commence on site. A preliminary Traffic
Guidance Scheme (TGS) has been prepared to accompany this document as part of the
Operational Works submission to Council (refer appendix A).

4.2    Temporary Fencing & Pedestrian Movement

Detailed Temporary Fencing and Pedestrian movements will be in accordance with the
Contractor supplied plan prior to commencement of works on site.

4.3    Control of Emissions

All air, noise, vibration and light emissions are to be controlled and maintained within
acceptable limits in accordance with standard industry guidelines. Refer to Local Authority
Policy or the Environmental Protection Act (EPP Noise) for further detail.

4.4    Water Quality

All existing drainage lines are to be maintained and protected from sediment runoff from
the proposed work areas. Appropriate erosion and sediment control measures are to be
implemented to achieve acceptable water quality objectives, including groundwater from
excavations. Any water released from the site must meet the water quality objectives found
in Table A of the SPP Code: Water Quality, Appendix 3, Qld SPP (DSDIP, 2014).

4.5    Mud and Dust Control

Sprinkler or light water spray systems shall be in place during earthworks to control airborne
dust and pollutants if/as necessary. Any resultant mud from this process will be managed
via the Erosion & Sediment Control systems in place during site construction.


The egress of mud from the site should be controlled via the use of shaker grids at the site
entry, as necessary.




Preliminary Construction Management Plan                                                  9
August 2020
Log in to download the original file

1856-CMP-01 [Prelim] August 2020.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.