Applicant's response to Council Information Request - 10074-16541ms.ms - 30-32 Doonella Street (00016995)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
Applicants Comments
TOD Consulting Engineers have prepared a preliminary stormwater drainage
plan which is provided in Attachment E. The Plan is supported by supplementary
information prepared by TODS which is included in Attachment F. The additional
information demonstrates that the proposed development can incorporate the
water quality and quantity measures proposed in the proposed modelling.
6. Demonstrate how the proposed use will achieve the overall outcome of
reducing the need for mains water compared to the existing situation.
Applicants Comments
The stormwater management plan includes a 15kl rainwater tank in the
basement which will be used to collect rainwater from the roof. The tank water
will then be used to irrigate the landscape areas in order to reduce the demand
for water generated by the proposed development.
END OF INFORMATION REQUEST RESPONSE
The above response to the information request demonstrates that all of the
issues raised by Council can be adequately dealt with and that the proposed
development should be approved by Council subject to reasonable and
relevant conditions.
As this correspondence provides “all of the information requested”, we will now
initiate the public notification of the application. Should you have any queries
relating to this issue, please do not hesitate to contact the writer on 5443 5566.
Yours faithfully
DFS Group
Mick Sheppard
Director
Encl. Attachments
cc: Serina Pty Ltd by email
August 2015 Response to Council’s Information Request Page 4
Proposed Multiple Housing Type 4 – 30 -32 Doonella Street, Tewantin