Skip to the record
Accept no imitations.

Council archive · source document

Amended Plans for approval - Bunnings Warehouse · OPW11/0131

of 45

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (57.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                        BLACKLAW
                                                                                                         CIVIL CONTRACTORS
              ENVIRONMENTAL MANAGEMENT PLAN (EMP)
              Noosa Bunnings


              3.6           ENVIRONMENTAL TRAINING

              All project personnel (including subcontractors) receive site induction training which covers;

                    •       Emergency and response procedures on site;
                    •       Environmental Awareness of their environmental protection responsibilities and
                            measures to minimise environmental impacts;
                    •       Environmental protection requirements of the site as set out in this EMP.

             Informal training through toolbox meetings is also delivered when required in topic such as
             erosion and sedimentation control, protection of heritage items, protection of native
             vegetation and other environment issues relevant to the site.

              3.7           ENVIRONMENTAL PERFORMANCE MONITORING

             To demonstrate compliance with the EMP, the Works Supervisor conducts weekly and after
             rain environmental controls implemented on site. Any actions resulting from the inspections
             are promptly resolved.

             The Project Manager ensures that environmental performance is evaluated on a regular
             basis and includes a review of inspections records, complaints/enquires received, waste
             generated/disposed, incidents and other environmental issues.




Document No: OMS-EMP-             Authorised by              Blacklaw Civil Contractors   Head Office             Telephone      5-1, 33^0
Date .ar.,arv 2011                    a,e e t -a •s Raun.)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile            33"+9
Version '                         Author                                                  Forest Gien OLD 4556    office@blacklawcnnl com au
Next Review       arv 20'              .=     a `Aa-renl
                                                                                                                                 Page 7 of 20

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.