BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings 14 ike
Any incidents on site, which are likely to cause material harm to the environment, will be
immediately reported to the Client's Representative.
The DERM (Department of Environment and Resource Management) will be notified of
pollution incidents on or around the site which have occurred in the course of the works, in
the following instances;
• The actual or potential harm to the health or safety of human beings or ecosystem is
not trivial;
• The actual or potential loss or property damage (including clean up costs) associated
with a pollution incident exceeds $10,000.
Emergency contact numbers (refer to Appendix A) will be displayed at the work sites.
Procedure in case of any incident
• First check that you are not in danger yourself.
• Notify your works Supervisor or most senior management person on site immediately
• The works Supervisor or most senior management person handles the emergency
according to company procedures
Procedure in case of fire
• Warn & rescue any person in immediate danger - only if safe to do so!
• Call the Fire Brigade on 000
• Extinguish the fire using the right fire extinguisher if safe to do so
• Evacuate to the emergency assembly area if directed or in danger
• Remain at assembly area and ensure everybody is accounted for
Procedure in case of chemical spill
Spill on the worksite are most likely to be hydraulic oil or engine oil spilled from plant items. If
a spillage occurs the following procedure is to be followed:
• Immediately identify the spilled material and notify the works supervisor.
Subcontractors are to notify the Principal Contractors site representative.
• Contain the spill as soon as possible so it doesn't spread. Refer to MSDS for
personal protective clothing needed.
• If containment is required, contain using earth mound and/or absorbent socks/spill
kit. If you can't do this let your supervisor know.
• Use the relevant clean up procedure as instructed by the MSDS.
• Once the spill has been contained, your supervisor will arrange removal and disposal
as soon as possible. Dispose of material using a licensed contractor and keep
records of disposal on site.
• Complete and Incident Report Form and forward it to the Project Manager.
Document No: QMS-EMP !;' Authorised by: Biacklaw Civil Contractors Head Office Telephone ;av
Date ,:a r.,ary 2011 a ;,,1-•e1i (Hans Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile a
Version Author Forest Glen QLD 4556 office@blacklawcivil com au
Next Review:laci.rarv 201 1 --a n'Narrenl
Page 6 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.