ENVIRONMENTAL MANAGEMENT PLAN (EMP) 141
Noosa Bunnings
APPENDIX B: ENVIRONMENTAL PROTECTION MEASURES
Note: 'Evidence of action' means records of the implementation of safeguards: where
appropriate refer to other checklists or documents. For simple, once-only actions, the
Evidence column may be initialled and dated
sar^r-PSC am anagement
Pre-works phase
The directly affected residents will be informed of temporary vehicle access
arrangements, at least five (5) days in advance where practical to do so.
Temporary advisory signs will be erected to inform gym & industrial access
users of changed conditions.
Works phase
Alternative access will be maintained at all times to existing beach users and
any affected businesses.
Post-works phase
All temporary traffic signs will be removes and, where appropriate, new
permanent signs erected.
Document No: OMS-EMP-:;' Authorised by Blackiaw Civil Contractors Head Office Telephone : ' i 5442 3300
Date . i .,ar; 201, a .:;e ^.r l ^a•s Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile 5442 3399
Version ' Author Forest Glen OLD 4556 [email protected]
Next Review: 1ar.:ary 201 C a q'tia,ren)
Page 9o120
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.