ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Pre-works phase
Ensure that on-site spill containment equipment/kits are available at
construction work sites where materials such as fuels, chemicals, paints or any
other liquids are used.
Ensure relevant Material Safety Data Sheets (MSDS) are available on-site for
all chemicals used or stored on site.
Works phase
In the event of spillage of hydrocarbon products such as fuels and/or
chemicals, on-site spill containment equipment/kits should be used to contain
spills and cleaned in accordance with the MSDS requirements.
All nearby drainage channels will be protected with sandbags
All incidents will be immediately notified to the client's Project Manager and
Environmental Manager.
Post-works phase
Nil
Document No: OMS-EMP.: Authorised by Blackiaw C:v,l Contractors Head Office Telephone 544_ 32Cc
Date ary 2011 ge-^ rr Fans Par,ri AEN 77 106 750 724 100 Sandalwood Lane Facsimile
Version Author Forest Glen QLD 4556 office®blacklawcrvil.com.au
Next Review ; v, ,.vy 20' a;q Ne•2a1
Page 10 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.