ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
144
Works phase
Materials transported in open trucks will be covered to prevent generation of
dust.
The tailgates of all vehicles transporting material from the site will be securely
fixed prior to loading and immediately after unloading.
Exhaust systems and engines for plant/equipment will be maintained
according to the manufacturers' specifications and regularly monitored to
ensure that exhaust emission are satisfactory (smoke for no longer than 10
seconds). Periodic visual checks will be made on exhaust system emissions.
Post-works phase
Nil
Document No. QMS•EMP-0 Authorised by Blacklaw Evil Contractors Head OThce Telephone 300
Date ar ary 2011 ^t i ,x)e „e n r l-ar.s Raun) ABN 77 106 750 724 00 Sandalwood Lane Facsimile a' •;: `9
Version Author Forest Glen OLD 4555 [email protected] au
Next Review IN•Y L;vy 20 ':F- '' eic *arren)
Page 11 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.