BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
noise ano v fora
Pre-works phase
The surrounding and adjoining facilities and businesses will be informed of
working hours and the level and duration of noise to be expected during
construction
Works phase
Construction noise is to be confined to 7am and 6pm Monday to Friday and
7am to 5pm on Saturdays. No work will be undertaken on Sundays or Public
Holidays
Noise mitigation measures if required will be implemented during construction
to ameliorate the effects of construction noise. Noise generated from
construction, maintenance or demolition of a building or other structure at an
airport should not exceed 75 dB(A), measure at the site of the nearest
sensitive receptor
Post-works phase
Nil
Document No CMS-EMP-01 Authonsed by Biack:an• Civ i Contractors Head Office Telephone _ ; 33^0
Date _ ..a ;: 3^,t a .rqr, --a - s Raun7 A8N '24 t00 Sandalwood Lane Facsimile
Version Author Forest Glen OLD 4556 office@blacklawcnnl com au
Next Review a^r 20,= -- a,c 1.3r•en)
Page 14 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.