ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Mn1 d"U
Works phase
All plant/equipment operators and employees will be instructed to confine
operations to within the clearly marked area of site operations
All machinery will be secured against vandalism outside of working hours
All plant/equipment will be inspected daily to avoid leakage of fuel, oil or
hydraulic fluid to the worksite. Machinery found to be leaking should be
repaired or replaced.
Post-works phase
Nil
Document No: QMS-EMP-C Authorised by Biack!aw Civil Contractors read Office Telephone 5442 3 0
Date w.,ary 201' Mr i.,qe rent (Hans Raun) ABN 77 '06 750 7,14 1 0,1, Sandalwood Lane Facsimile 442 3
Version I Author - :•est Glen OLD 4556 office@blacklawcivil com au
R
Nex t evi ew: J anuary 20 ' : ' ; - aiq W arren)
Page 15 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.