Council archive · source document
Amended Plans for approval - Bunnings Warehouse · OPW11/0131
Plans and drawings: the text below has words only, no drawings.
Very large file (57.8 MB): may take a few minutes to open.
BLACKLAW
14:0 CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Ch u;
Works phase
Materials transported in open trucks will be covered to prevent generation of
dust.
The tailgates of all vehicles transporting material from the site will be securely
fixed prior to loading and immediately after unloading.
Exhaust systems and engines for plant/equipment will be maintained
according to the manufacturers' specifications and regularly monitored to
ensure that exhaust emission are satisfactory (smoke for no longer than 10
seconds). Periodic visual checks will be made on exhaust system emissions.
Post-works phase
Nil
Document No: DMS-EMP.O' Authonsed by Blacklaw Drvll Contractors Head Office Telephone C' 5442 3300
Date a'-.a'y 201 . a-i;e-- . a••s Raun) ABN 77 106750724 100 Sandalwood Lane Facsimile '' 5442 3;59
Version ' Author Forest Glen OLD 4556 of6ce@blacklawuvIl com.au
Next Review - ary 20': en)
Page 19 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.