ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Pre-works phase
Site works will not start until the erosion and sediment control works outlined
below, are installed and functional;
• Measures are in place; appropriate to the works being completed (Silt
socks in kerb/gutter, silt fencing etc)
• The entry to and departure of vehicles from the site will be confined to
existing established beach access points. No new access points shall
be formed.
Works phase
Discharge waters from the site should not contain more than 50 milligrams per
litre of total suspended solids in the design rainfall event or more than 75 NTU
turbidity. All practical measures must still be taken in beyond-design
events, including chemical dosing, and maintain catch and diversion drains as
required.
All erosion and sediment controls will be checked at least weekly and after rain
to ensure they are maintained in a fully functional condition.
Post-works phase
Any temporary sedimentation control structures will be removed at the end of
the project.
Document No V -EMP • Authorised by Blacklaw Civil Contractors Head Office Telephone
Date a I V i ; a art (Hans Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile
Version ' Author Forest Glen OLD 4556 officeiblacklawcivil com.au
Next Review v arv 2r,'- a,g Warren)
Page 18 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.