Amended Plans for approval - Bunnings Warehouse · OPW11/0131
Plans and drawings: the text below has words only, no drawings.
Very large file (57.8 MB): may take a few minutes to open.
Protecting a sump-position kerb Protecting a Gully Pit
inlet
Place sand bags in a complete circle
Place bags in an arc around the curb around the gully pit - more than one
inlets that are in a sump position layer may be required due to amount
of run off
Sump Posmon Intel
Sand Bag' Gully pit
Sand Bags
Run-LII
Rein-otf
/1W Run., ,ff
k
Figure 3 Sump Position Kerb Inlet
Figure 4 Gully Pit
Safety
Place warning devices (such as Witches Hat) as appropriate to protect public safety.
Maintenance
Inspect and repair as needed, and remove any accumulated sediments after every storm
event
Kerb Inlet Protection Document Number Page 2 of 2
Issue Number 1 July 2008 QMS 071 Authonsed by: C. Gursanscky
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.