Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Amended Plans for approval - Bunnings Warehouse · OPW11/0131

of 45

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (57.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
        BLACKLAW                 Erosion and Sediment Controls                 Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                       Fax: 07 5442 3399
                                             QMS 072                                  Email:

     100 Sandalwood Lane                Stockpiles                         [email protected]
                                                                                 ABN 77 106 750 724
    Forest Glen QLD 4556

Purpose:
  Provide a standard procedure for the placement and protection of stockpiles of topsoil,
  spoil and other material (eg: Sand, gravel, rock etc)

Materials Required
•   Commercial sediment fence;
n   Wooden stakes, staple gun and staples or star pickets & caps, wire and wire cutters;
•   Mallet or pole driver; and
•   Shovel


Procedure:                                          On flat surfaces, place sand bags or
                                                    geofabric bags filled with gravel around
Stockpiles                                          stockpile (figure 2)

Locate stockpiles as directed by Contract.          Seed or cover as directed by Contract.
If no position advised, locate on clear,
even, firm, well drained ground, with a                                                Sandbags placed
                                                                                       to divert Ilow of
separate pile for each material type.                                                  water


Do not place stockpiles in natural                           Kerb
                                                                           Stockpile
drainage lines

Place stockpiles outside drip line of trees
to prevent damage to the branches or
trunk (by machinery) and damage to roots
(by soil compaction)                                       Figure 2 Stockpile on Flat Surface

If stockpile has to be located on a slope,          Maintenance
construct diversion drain or bund on the
upslope side to divert run off around the           Sediment fences should be inspected
stockpile. Place a sediment fence 1-2m              regularly (especially after rainfall events)
down slope o f the stockpile (figure 1)             and cleaned out as required.

                                                    Safety

                                                    Cap all Star Pickets (if used)

                                                    Ensure stockpile poses no public safety
                                                    threat (no vertical faces over 1.5m), not
                                                    located in pathway or road reserve.




         Figure 1. Stockpile on Slope
    Stockpiles                                Document Number         I                      Page 1 of 1
    Issue Number 1 July 2008                     QMS 072                  Authonsed by: C. Gursanscky

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.