        BLACKLAW               Erosion and Sediment Controls                     Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                         Fax: 07 5442 3399
                                            QMS 076                                       Email:
                                                                              [email protected]
     100 Sandalwood Lane         Sccfiillcilt Basins                                ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  provide a temporary settling pond with a controlled storm water release structure used
  to collect and store sediment produced by construction activities before runoff is
  discharged.

Materials Required
•   Outlet pipe with riser          n   Geo-textile
n   Rock - 75 - 150 spalls          above materials may be required dependant upon site conditions




Procedure:

Installation

Construct excavation or embankment to
create dam wall, primary outlet and
emergency spillway to contract
specifications.

Locate as directed by contract ensuring
that the basin is constructed before
clearing and grading work begins (when                                     Figure 1.
feasible) and only water polluted by site
activities enters the basin.                          Maintenance

The size of a sediment basin will vary                Inspect basin prior to forecast rain, daily
depending upon the needs of the site, but             during extended rain events. after rain
will generally conform to the minimum                 events and fortnightly during the dry
length/width ratio of 3:1.                            season.

Remove all vegetation and topsoil from                Check for seepage and structural
within the storage area and from under                soundness.
the dam wall location.
                                                      Check inlet and outlet area for erosion
Securely anchor the outlet pipe/riser and             and stabilise if required
construct emergency spillway.
                                                      Sediment should be removed when
                                                      accumulation reaches one half the
If seepage is a considered a problem, line
                                                      designated sediment storage volume.
basin with geo-textile.
                                                      Remove accumulation of live and dead
                                                      floating vegetation.




    Sediment Basins                            Document Number                               Page 1 of 1
    Issue Number 1 July 2008                       QMS 076                  Authorised by: C. Gursanscky j

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.