Council archive · source document
Amended Plans for approval - Bunnings Warehouse · OPW11/0131
Plans and drawings: the text below has words only, no drawings.
Very large file (57.8 MB): may take a few minutes to open.
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
QMS 075 Email:
[email protected]
100 Sandalwood Lane Erosion Matting ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation erosion matting to prevent erosion by
absorbing the impact of rainfall and reducing runoff velocities.
Materials Required
• Jute Matting or other designated geo-fabric
• Staples
Procedure:
Installation Dirett^on
Before placement ensure surface is
smooth, uniform and free from stones,
tree roots or other debris. Ph
Place mesh according to site plans.
Figure 1. Erosion Mat
Roll the mesh out in direction of flow
unless otherwise instructed.
Anchor the mesh in a 150mm trench to
start.
Overlap adjacent strips and ends by at
least 150mm
Do not stretch mesh; lay it evenly but
loosely on soil surface.
Staple along each edge of the matting;
spacing not greater than 1.2m. Staple
rows through the middle as required,
alternating each row of staples from the Figure 2 Staple layout guide
row above it.
Rock Filter Dams Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 074 Authorised by: C. Gursanscky
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.