           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings


           3.0       IMPLEMENTATION

           3.1       ENVIRONMENTAL PROTECTION REQUIREMENTS

           In general, all activities carried out on the site will comply with the relevant provisions of all
           legislation for the construction of this Project.

           The environmental issues identified as requiring planning and control measures during the
           delivery of the project construction are detailed in Appendix B. They cover three distinct
           phases of activity in accordance with the sequence of operations. These are requirements;

                 •   Prior to construction;
                 •   During construction and
                 •   Post construction (but not including operation).

           3.2       WORKING HOURS

           Working hours shall be lam to 6pm Monday to Friday and lam to 5pm on Saturdays.

           Works outside these hours will require written approval from the Client and nearby residents
           and businesses will be advised of changed hours.

           3.3       NON-CONFORMANCE CONTROL, CORRECTIVE AND PREVENTIVE ACTION

           A non-conformance occurs when a procedure or environmental safeguard is not followed, or
           does not perform as required by this EMP. The Superintendent will monitor non-
           conformances to the EMP and initiate a corrective and preventative action where required.
           Non-conformance is reported in the relevant form.




Document No. QMS-EMP-J'     Authonsed by                B!acklaw Civil Contractors   Head Office             Telephone :     5447 33 CC
Date a .,aw 20t t                          a-s :?",I,   ^.FN '7 ?05' 5C -24          100 Sandalwood lane     Facsimile 5     ^443 3397
Version                     Author '                                                 Forest Glen OLD 4556    office@blacklawci%nl.com.au
NextRevew _ar„ary20'.
                                                                                                                             Page 4 of 20

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.