            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings
                                                                                           141t
            3.4       COMMUNICATION AND COMPLAINTS PROCEDURE

                      3.4.1    COMMUNICATION

            The works Supervisor is the contact point to deal with all environmental issues and
            emergencies. He or she is responsible for ensureing all such issues are resolved. Work
            team members must notify the Work Supervisor of any environmental issues on site.

            The Works Supervisor has been nominated to be available to relevant external authorities on
            a 24-hour basis. He/she has the authority to take any action on site as directed by an
            authorised officer of any relevant external authority. (See Appendix A for the 24-hour contact
            numbers).

            All relevant authorities, affected property owners and others in the vicinity or affected by
            specific works will be informed of the project, activity and timeframes.

            Emerging environmental issues on site are discussed and consulted through regular Toolbox
            meetings. A suitable form for recording toolbox-meeting outcomes is provided in the
            appendices of this document. These records are retained as project records.

            Inquiries about the works from external parties will be recorded on the Communication
            Register.

                      3.4.2    COMPLAINTS MANAGEMENT

            Any complaints which concern any aspect of the project are recorded and investigated (form
            QMS-POL-10). A Complaints Report will be maintained. The Complaints Report shows the
            details and nature of the complaint, the complainant, the date and actions taken as a result
            of the investigation.

            If an environmental complaint (such as a complaint regarding noise or pollution) is received,
            a written report will be prepared and given to the clients' representative within one working
            day. This report includes details of the complaint, action taken to correct the problem and
            proposed measures to prevent the occurrence of a similar incident.

            3.5        EMERGENCY RESPONSE PROCEDURES

            All environmental incidents are dealt with promptly to minimise any potential impacts.
            Unexpected or accidental environmental incidents will be managed in accordance with the
            sites' incident response and reporting procedures. All environmental incidents are reported
            using the relevant form.

            Likely emergencies and incidents may involve;

                  •    Fuel or chemical spills;
                  •    Unlicensed discharge of pollutants to environment (air, water, noise, soil);
                  •    Dumping of waste to an unauthorised site.

            The Works Supervisor on site is responsible for undertaking the incident response according
            to the procedure.
Document No: OMS-EMP 0'       Authorised by              Blacklaw Civil Contractors   Head Office             Telephone      5 =3   ; :;r
Date ^a ..a^                   1arager ?n    are Raun)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile
Version:                      Author:                                                 Forest Glen OLD 4555    [email protected] au
Next Review ...':ar1 2012              Cray, r\er'ent
                                                                                                                              Page 5 of 20

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.