ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
141t
3.4 COMMUNICATION AND COMPLAINTS PROCEDURE
3.4.1 COMMUNICATION
The works Supervisor is the contact point to deal with all environmental issues and
emergencies. He or she is responsible for ensureing all such issues are resolved. Work
team members must notify the Work Supervisor of any environmental issues on site.
The Works Supervisor has been nominated to be available to relevant external authorities on
a 24-hour basis. He/she has the authority to take any action on site as directed by an
authorised officer of any relevant external authority. (See Appendix A for the 24-hour contact
numbers).
All relevant authorities, affected property owners and others in the vicinity or affected by
specific works will be informed of the project, activity and timeframes.
Emerging environmental issues on site are discussed and consulted through regular Toolbox
meetings. A suitable form for recording toolbox-meeting outcomes is provided in the
appendices of this document. These records are retained as project records.
Inquiries about the works from external parties will be recorded on the Communication
Register.
3.4.2 COMPLAINTS MANAGEMENT
Any complaints which concern any aspect of the project are recorded and investigated (form
QMS-POL-10). A Complaints Report will be maintained. The Complaints Report shows the
details and nature of the complaint, the complainant, the date and actions taken as a result
of the investigation.
If an environmental complaint (such as a complaint regarding noise or pollution) is received,
a written report will be prepared and given to the clients' representative within one working
day. This report includes details of the complaint, action taken to correct the problem and
proposed measures to prevent the occurrence of a similar incident.
3.5 EMERGENCY RESPONSE PROCEDURES
All environmental incidents are dealt with promptly to minimise any potential impacts.
Unexpected or accidental environmental incidents will be managed in accordance with the
sites' incident response and reporting procedures. All environmental incidents are reported
using the relevant form.
Likely emergencies and incidents may involve;
• Fuel or chemical spills;
• Unlicensed discharge of pollutants to environment (air, water, noise, soil);
• Dumping of waste to an unauthorised site.
The Works Supervisor on site is responsible for undertaking the incident response according
to the procedure.
Document No: OMS-EMP 0' Authorised by Blacklaw Civil Contractors Head Office Telephone 5 =3 ; :;r
Date ^a ..a^ 1arager ?n are Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile
Version: Author: Forest Glen OLD 4555 [email protected] au
Next Review ...':ar1 2012 Cray, r\er'ent
Page 5 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.