Reference Document Ecological Assessment Report - Urban Catalyst 3 18 July 2025
NOTES
These notes are to be read in conjunction
with sheet: 002 GENERAL NOTES
005 WHS REQUIREMENTS
006 WHS REQUIREMENTS CON.
Lot subject to bushfire attack assessment. A 8.5 m MAXIMUM BUILDING HEIGHT
Refer AS3959-2018 for construction details.
BAL: REFER REPORT 400
COLORBOND CUSTOM ORB STEEL
Prepared By: BUSHFIRE RISK REDUCERS ROOFING
Report No: 015.06.21
Date: 30/06/2021 LYSAGHT HALF-ROUND 150 STEEL
GUTTER WITH INTERNAL BRACKET
25°
All measurements are in millimetres
unless noted otherwise. Do not scale off
drawings, use written dimensions only.
CUSTOM CUSTOM
These plans are to be read in conjunction FRAME HEIGHT
10°
with any structural or civil engineering
drawings; and all other consultants RL: 118.340m
123.040m
drawings / details and with any other
JOINERY (LIVING)
written instructions issued.
JOINERY (UNO)
AAW15/21 GAS
FRAME
15/15 ASW
STRUT
3040
OBSCURE 27/60 AST-6
2700
Refer to window & door manufacturers 24/42 ASD-4
2400
specifications / schedules for details
and dimensions.
Protection of openable windows in FLOOR PLAN - GROUND
bedrooms must be provided where the RL: 115.300m
120.000m
floor below the window is 2 m or more
above the surface beneath and must 90mm x 90mm F/J MERBAU TIMBER JAMES HARDIE SCYON LINEA WEATHERBOARD ALUMINIUM FRAMED SLIDING GLASS DOORS -
POST - STAIN FINISH 180mm - PAINT FINISH POWDERCOAT FINISH
comply with NCC Part 3.9.2.6.
Protection of openable windows in S ELEVATION - SOUTH A
140mm x 140mm F/J MERBAU
TIMBER POST - STAIN FINISH
rooms other than bedrooms must be 301 SCALE 1 : 100
provided where the floor below the 400
window is 4m or more above the
surface beneath and must comply
with NCC Part 3.9.2.7.
Refer builders specifications / schedule
of works for materials & details of finish.
These plans shall be read in conjunction 8.5 m MAXIMUM BUILDING HEIGHT
with any House Energy Rating (HERS)
report and shall be constructed in
accordance with the stamped plans COLORBOND CUSTOM ORB STEEL
ROOFING
endorsed by the accredited Thermal 25°
Performance Assessor without alteration.
Refer to HERS Report for nomination of LYSAGHT NOVALINE 185 STEEL
FASCIA
all insulation.
10° FRAME HEIGHT
LYSAGHT HALF-ROUND 150 STEEL RL: 118.340m
123.040m
GUTTER WITH INTERNAL BRACKET
JOINERY (UNO)
FRAME
15/06 ADH JAMES HARDIE SCYON LINEA
3040
OBSCURE
21/21 ADH 21/09 ADH WEATHERBOARD 180mm - PAINT
2400
FINISH
140mm x 140mm F/J MERBAU
TIMBER POST - STAIN FINISH 90mm x 90mm F/J MERBAU TIMBER
POST - STAIN FINISH FLOOR PLAN - GROUND
RL: 115.300m
120.000m
ALUMINIUM FRAMED DOUBLE HUNG GLASS
WINDOWS - POWEDERCOAT FINISH
E ELEVATION - EAST
301 SCALE 1 : 100
NOT FOR CONSTRUCTION
© COPYRIGHT The design illustrated and these documents remain the exclusive property of VERS DEVELOPMENT PTY LTD as trustee for VAN SLYKE
TRUST trading as DRAFTROOM and may not be reproduced or used in part or in whole without the expressed written permission of DRAFTROOM
Issue Description Date By Project Address Sheet Title Project Number
draftroom.com.au
E
F
CLIENT CHANGES
SHED LOCATIONS
06/02/2024
18/04/2024
ALC
LVS
Lot 2 (#555) Louis Bazzo Drive Elevations - Dwelling DR23-0301
G OVERLAY AREAS 02/10/2024 LVS POMONA QLD 4568 Sheet
H
I
SITE 2 AMENDMENTS
PROTECTED PLANTS OVERLAY
22/11/2024
28/11/2024
LVS
LVS
QBCC 15380229 | BDQ 2494
PO Box 959 Caloundra QLD 4551 Author Laurence van Slyke
301
J SHED AMENDMENTS 08/07/2025 LVS Client Date Issue
0431 412 485 18/07/2025
K AMENDMENTS 18/07/2025 LVS [email protected] Tim OLAH Scale 1 : 100 @ A3 K