Original source · versioned page text
Reference Document Ecological Assessment Report - Urban Catalyst 3 18 July 2025
NOTES
These notes are to be read in conjunction
with sheet: 002 GENERAL NOTES
005 WHS REQUIREMENTS
006 WHS REQUIREMENTS CON.
Lot subject to bushfire attack assessment. A 8.5 m MAXIMUM BUILDING HEIGHT
Refer AS3959-2018 for construction details.
BAL: REFER REPORT 400
Prepared By: BUSHFIRE RISK REDUCERS
Report No: 015.06.21 COLORBOND CUSTOM ORB STEEL
Date: 30/06/2021 ROOFING
All measurements are in millimetres 25° LYSAGHT HALF-ROUND 150 STEEL
unless noted otherwise. Do not scale off GUTTER WITH INTERNAL BRACKET
drawings, use written dimensions only.
These plans are to be read in conjunction FRAME HEIGHT
10°
with any structural or civil engineering
drawings; and all other consultants RL: 123.040m
118.340m
drawings / details and with any other
written instructions issued.
JOINERY (UNO)
FRAME
3040
Refer to window & door manufacturers
2400
2x 900 ALD 2x 900 ALD 920+SL 2x 900 ALD 2x 900 ALD 2x 900 ALD
specifications / schedules for details
and dimensions.
Protection of openable windows in FLOOR PLAN - GROUND
bedrooms must be provided where the RL: 120.000m
115.300m
floor below the window is 2 m or more
above the surface beneath and must ALUMINIUM FRAMED HINGED ENTRY DOOR -
comply with NCC Part 3.9.2.6. CLEAR GLASS - POWEDERCOAT FINISH
Protection of openable windows in N ELEVATION - NORTH A
JAMES HARDIE SCYON LINEA WEATHERBOARD
180mm - PAINT FINISH
rooms other than bedrooms must be 300 SCALE 1 : 100
provided where the floor below the 400
90mm x 90mm F/J MERBAU TIMBER
window is 4m or more above the POST - STAIN FINISH
surface beneath and must comply
with NCC Part 3.9.2.7.
Refer builders specifications / schedule
of works for materials & details of finish.
8.5 m MAXIMUM BUILDING HEIGHT
These plans shall be read in conjunction
with any House Energy Rating (HERS)
report and shall be constructed in
accordance with the stamped plans COLORBOND CUSTOM ORB STEEL
endorsed by the accredited Thermal ROOFING
25°
Performance Assessor without alteration.
LYSAGHT NOVALINE 185 STEEL
FASCIA
Refer to HERS Report for nomination of
all insulation. LYSAGHT HALF-ROUND 150 STEEL FRAME HEIGHT
10° GUTTER WITH INTERNAL BRACKET
RL: 118.340m
123.040m
140mm x 140mm F/J MERBAU
TIMBER POST - STAIN FINISH
JOINERY (UNO)
12/06 ADH
FRAME
3040
OBSCURE
JAMES HARDIE SCYON LINEA
2400
850 ALD WEATHERBOARD 180mm - PAINT
FINISH
ALUMINIUM FRAMED HINGED ENTRY DOOR - 90mm x 90mm F/J MERBAU TIMBER
CLEAR GLASS - POWEDERCOAT FINISH POST - STAIN FINISH FLOOR PLAN - GROUND
RL: 115.300m
120.000m
ALUMINIUM FRAMED DOUBLE HUNG GLASS
WINDOWS - POWEDERCOAT FINISH
W ELEVATION - WEST
300 SCALE 1 : 100
NOT FOR CONSTRUCTION
© COPYRIGHT The design illustrated and these documents remain the exclusive property of VERS DEVELOPMENT PTY LTD as trustee for VAN SLYKE
TRUST trading as DRAFTROOM and may not be reproduced or used in part or in whole without the expressed written permission of DRAFTROOM
Issue Description Date By Project Address Sheet Title Project Number
draftroom.com.au
E
F
CLIENT CHANGES
SHED LOCATIONS
06/02/2024
18/04/2024
ALC
LVS
Lot 2 (#555) Louis Bazzo Drive Elevations - Dwelling DR23-0301
G OVERLAY AREAS 02/10/2024 LVS POMONA QLD 4568 Sheet
H
I
SITE 2 AMENDMENTS
PROTECTED PLANTS OVERLAY
22/11/2024
28/11/2024
LVS
LVS
QBCC 15380229 | BDQ 2494
PO Box 959 Caloundra QLD 4551 Author Laurence van Slyke
300
J SHED AMENDMENTS 08/07/2025 LVS Client Date Issue
0431 412 485 18/07/2025
K AMENDMENTS 18/07/2025 LVS [email protected] Tim OLAH Scale 1 : 100 @ A3 K
I
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.