Skip to the record
The only place to find full transcripts.

Council archive · source document

Operational Works Application OPW17-0561 · OPW17/0561

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

PROPOSED NEW TERRACE AT 12 PARK ROAD, NOOSA HEADS

AMENDED “CONSTRUCTION MANAGEMENT PLAN” 26 Sep 2017

1. CONSTRUCTION MANAGEMENT PLAN

This report considers the Construction Management Plan for the proposed
new suspended steel and timber terrace together with access requirements,
materials handling, clearing, worker parking, and environmental considerations.

It is proposed to utilize predominantly manual material handling to construct
the footings, steel and timber terrace and install landscaping.

All conditions of the approval are to be complied with to the reasonable
satisfaction of the Noosa Council.

SUBMISSION BY BUILDER

The Builder is to submit written acknowledgement that the building works
shall be in compliance with the 9 tonne load limit applicable to Park Road.

The Builder is to submit written acknowledgement that no vehicle greater
than 6.0m in length will be used for the removal of excavated material and
that no more than one vehicle will be allowed to stand in Park Road at any
time.

The Builder is to submit written acknowledgement that most workers vehicles
are to be parked in Allambi Rise or in the existing driveway and carport.

The Builder is to submit written acknowledgement that all the works will be
carried out in accordance with the Construction Management Plan , and the
conditions of approval to the reasonable satisfaction of the Noosa Council.

STORMWATER DRAINAGE

Stormwater will be collected by a conventional arrangement of gutters, slatted
field drains and downpipes and piped through to the Council stormwater
main in Park road. The stormwater will connect to the Council main gulley
pit to limit surcharge.

Used in these records

About this file

File size
26.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW17-0561.pdf · 26.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.