Council archive · source document
Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
TRAFFIC MANAGEMENT The first operation will be the installation of the micro piles and excavation of footings. During this stage the builder shall engage the services of a traffic management company to ensure there is no interference to the general traffic using Park Road. Traffic controllers will be required to be present to divert vehicles during the installation of micro piles and excavation of footings. Traffic controllers will divert all vehicle deliveries and departures to the site on Park Road. The timing of deliveries shall be such that they do not coincide with peak usage times in Park Road. Refer to Traffic Guidance Scheme prepared by Evolution Traffic Control for details of proposed traffic management. The builder warrants that using the procedures nominated above the elevated terrace can be safely constructed with minimal impact on the environment including the protected trees. Original Construction management plan produced by STEFAN PRYSTUPA, B.Eng (Civil); M.I.E.Aust; C.P.Eng; RPEQ Sep 2017 JOB NO, 17543
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.