Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
PCA-WI-001 Co CA Work Instruction - Micropiling AUTEGROUND ENGINEERING Ui Revision No: 4 Issue Date: 5/02/16 All Printed Copies are Uncontrolled Page 3 of 7 4.1.2 Drill bit selection Drilling will be carried out using a 90mm EXxX drill bit using a rotary top hammer for installation. 4.1.3 Installation Records The installation records for production piles will divided into two individual sets and will include a minimum of the following information; 88.9x6mm Casing Installation e Site location e@ Names and positions of each piling crew member e Date of installation of each casing e Drill bit type ° Type of casing used e Start time of each casing e Completion time of each casing e Length of casing including; © Total length of casing o Length of casing above ground o Length of casing below ground e Installed casing angle e Pile number e Drawing number e@ Project number e General comments Hollow Bar Installation e Site location e Names and positions of each piling crew member © Date of installation of each casing © Drill bit type e Start time of drilling the bond length © Completion time of grouting the pile
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.