PCA-WI-001
p C A Work Instruction - Micropiling

AONGROUND ENGINEERING Yay Revision Nad Issue Date: 5/02/16

 

 

 

 

All Printed Copies are Uncontrolled Page 6 of 7

 

4.2 Proof Load Testing

Onepile will be proof load tested in tension in accordance with AS2159 A2 Method

(Tension), the test procedure to be as follows;

I.

Il.
II.

Vi.
VIL.

VIN.

Level the ground either side of the test pile to ensure the reaction system can
lay flat and the test beam can be installed at the required levels.

Allow the test pile to cure insitu for a minimum of 72 hours.

Install the test rig such that it is positioned centrally over the test pile and
supported on a reaction system that is a minimum of 3 pile diameters from the
test pile. The test beam is to be installed such that the load can be applied
axially to the pile. This is done by ensuring the test beam is level and the
appropriate shims are used between the test beam and the reaction beams to
match the angle of the test pile.

Measurements of deflection will be taken by using two LVDT Macro Sensors
fixed to an independent reference beam. The macro sensors have a deflection
range of 100mm and are accurate to within 0.01mm. The Macro Sensors will be
positioned on both sides of the jacking plate which is positioned on top of the
jack and is at the pile head.

Measurements of load will be taken using a calibrated pressure sensor which
measures the applied load by the jack. Alternatively, a load cell may be used to
measure the applied load.

The jack will be a hydraulic jack capable of producing the required test load.
Both the deflection and load will be recorded on an electronic data logger
capable of taking 10 readings per second. Deflection and load data will be
displayed in real time and all data stored on a memory card for later analysis.

A load test report including graphs of applied load versus deflection will be
provided to PCA’s Engineering Manager for review upon completion of the test.
lt is anticipated that each test will take a minimum of 4 hours to complete and
will follow the loading plan on the load test record sheet.

 

Used in these records

About this file

File size
26.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW17-0561.pdf · 26.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.