PCA-WI-001 p C A Work Instruction - Micropiling AONGROUND ENGINEERING Yay Revision Nad Issue Date: 5/02/16 All Printed Copies are Uncontrolled Page 6 of 7 4.2 Proof Load Testing Onepile will be proof load tested in tension in accordance with AS2159 A2 Method (Tension), the test procedure to be as follows; I. Il. II. Vi. VIL. VIN. Level the ground either side of the test pile to ensure the reaction system can lay flat and the test beam can be installed at the required levels. Allow the test pile to cure insitu for a minimum of 72 hours. Install the test rig such that it is positioned centrally over the test pile and supported on a reaction system that is a minimum of 3 pile diameters from the test pile. The test beam is to be installed such that the load can be applied axially to the pile. This is done by ensuring the test beam is level and the appropriate shims are used between the test beam and the reaction beams to match the angle of the test pile. Measurements of deflection will be taken by using two LVDT Macro Sensors fixed to an independent reference beam. The macro sensors have a deflection range of 100mm and are accurate to within 0.01mm. The Macro Sensors will be positioned on both sides of the jacking plate which is positioned on top of the jack and is at the pile head. Measurements of load will be taken using a calibrated pressure sensor which measures the applied load by the jack. Alternatively, a load cell may be used to measure the applied load. The jack will be a hydraulic jack capable of producing the required test load. Both the deflection and load will be recorded on an electronic data logger capable of taking 10 readings per second. Deflection and load data will be displayed in real time and all data stored on a memory card for later analysis. A load test report including graphs of applied load versus deflection will be provided to PCA’s Engineering Manager for review upon completion of the test. lt is anticipated that each test will take a minimum of 4 hours to complete and will follow the loading plan on the load test record sheet.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.