Original source · versioned page text
Approved Plans - RAL21-0028
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
APPROVED PLAN
RAL21/0028
NOOSA COUNCIL
25 MARCH 2022
Lot 1 Lot 2
Document Set ID: 21713940
Version: 1, Version Date: 26/11/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
GENERAL NOTES
1500 1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS
DRAWINGS AND SPECIFICATIONS. 2. BEFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES
1500
IN THE CONTRACT DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.
3000
3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!
PROPOSED 100MM UPVC SEWER LINE 23930MM 4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND LEVELS
5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE (INCLUDING
UNITY WATER ASSET THE QUEENSLAND SUPPLEMENT), THE QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND
PROPOSED MANHOLE 6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO
MANHOLE 1050 7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE uPVC
EXISTING BLOCKWORK MANHOLE 1050 ASSET ID - 2663533 8. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND
RETAINING WALL 1M ASSET ID - TBA S.L - 11.17 9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH LINDSAY CONSULTING PTY LTD
APPROX THROUGHOUT S.L - 14.00 I.L - 8.56 COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION
SEWER EASEMENT LINDSAY CONSULTING PTY
I.L - 8.56 10.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD LTD
PROPOSED HCB TO ALLOW DRAWING AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD
FOR 1% MIN GRADE FROM 11. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY WITH
THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
INTERNAL SEWER LINE. RPEQ 4928
MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT". COUNCIL DOES NOT
DRIVEWAY ESTIMATED IL - 13.184 APPROVE OF BLACKING OUT OF EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT ROAD CROSSINGS AS
APPLICABLE. THIS DRAWING REMAINS THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
EXISTING INDUSTRIAL SHED
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
STORMWATER DRAINAGE NOTES
1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO CARRYING OUT
OF THE WORKS
CLIENT AND PROJECT DESCRIPTION
EXISTING SEWER
2.ALL LEVELS TO AHD.
3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
4.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE BEFORE WORK COMMENCES.
GE & LK GRAMS
LINE FROM INDUSTRIAL
SHEDS TO MANHOLE.
LINE TO BE DISCONTINED/
5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING.
6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS PROPOSED SUBDIVISION
53-57 RENE ST
7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE VERIFIED ON SITE WITH THE
MADE REDUNDANT REVLEVANT AUTHORITY PRIOR TO THE COMMENCEMENT OF WORKS
1500 SHORT OF PROPOSED 8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE
DRIVEWAY
BOUNDARY AND DIRECTED
TO PROPOSED HCB
PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE
LOCAL AUTHORITY.
9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITIES
NOOSAVILLE
SPECIFICATIONS AND STANDARDS.
10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES
AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING
SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE FOOTPATHS
AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION.
11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND DRAINAGE OUTLETS FROM THE
KERB AND CHANNEL INCLUDING ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE DRAWING TITLE
EXISTING BLOCKWORK REMOVED AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO THE LOCAL
RETAINING WALL 1M AUTHORITIES CURRENT SPECIFICATIONS AND OR STANDARDS
12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF THE WORKPLACE
OPERATIONAL WORKS
APPROX THROUGHOUT
HEALTH AND SAFETY ACT 1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS
ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE THE REQUIREMENTS OF THIS
WATER AND SEWER
SPECIFICATION WITH REGARD TO 'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE
FULFILLED.
1
13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH FINISHED SURFACE, AND PIPES
2
SHALL NOT PROJECT INSIDE THE SHAFT OF THE PIT.
43
EXISTING INDUSTRIAL SHED 14.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE (MINIMUM SEWER CLASS SN8) TO AS
14. 1260 OR APPROVED EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE 50mm
EXCEPT WHERE REDUCED COVER IS REQUIRED TO DISCHARGE TO THE KERB AND CHANNEL.
SCALES
0
15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3: PIPES SHALL COMPLY WITH
P1
- 1.0% (MIN) GRADE FOR PIPES < 150 DIA.
- 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.
nS A1 - 1:200
16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE CONSTRUCTED WITH 32 MPa
DRIVEWAY 17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE LAYOUTS.
18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS AND PARKING AREAS SHALL BE
(i) 75% MINIMUM DENSITY FOR COHESIONLESS MATERIAL (AS 1289 E5.1) AND
1o
(ii) 90% RELATIVE DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)
T 28
LO
Expansion joints:
Types 1 and 2 at 16.0m centres
Types 3 at 6.0m centres
SURVEY DATUM
Type 1. 10 thick, full depth closed cell cross linked
polyethylene foam (85-150kg/m )
.
Type 2. 10 thick compressed granulated cork board
Type 3. Connolly Key Joint with 100mm thick concrete
Installation to manufacturers' instructions B
MATCH EXISTING
EXISTING CARPARK AND DRIVEWAY C C
ASSOCIATED CONSULTANTS
Contraction joints at 2.0m centres:
B
25 deep x 6 wide recess, saw cut, PLAN
100 or as specified
or crack inducer 25 deep.
refer note 5
F72 Fabric (CENTRAL)
EXISTING BLOCKWORK
RETAINING WALL 1M PROPOSED BOUNDARY Contraction joint Compacted sub-grade
Expansion Joint
APPROX THROUGHOUT SECTION C - C
1450
TO BE CONFIRMED ON-SITE
1200
-
APPROVED PLAN
EXISTING BLOCKWORK
RETAINING WALL REDUCING FOOTPATH NOTES
TO APPROX 300MM 1. Concrete N25 in accordance with AS 1379 and AS 3600. 6. Concrete footpaths, adjoining existing driveways are to be
2. All concrete to be broom finished. transitioned over a minimum 5.0m length.
RAL21/0028
SECTION B-B 3. Contraction/expansion joints, 2m MAX spacing. 7. A street opening permit must be obtained from Council, seek
4. Finished surface tolerance to be maximum +6mm -0mm relative approval of location and levels prior to excavation.
to kerb level and crossfall specified. 8. All dimensions in millimetres.
5. Thickness to be increased to 125mm at residential vehicular
NOOSA COUNCIL
GRASS/LANDSCAPINGPROPOSED 600 X 600 crossings. Reinforce with F72 MIN fabric, 50mm top and edge
cover. Provide a contraction or expansion joint at both ends
STORMWATER PIT. ALL of thickened section.
GRASS/LANDSCAPING
INTERAL STORMWATER
TO BE DIRECTED TO 225 UPVC- MIN GRADE 1%
- 24045 NOM. 900X900 FEILD INLET
FOOTPATH DETAIL - IF REQUIRED
Not to scale 25 MARCH 2022
THIS PIT FOR DISCHARGE ALL LEVELS TO BE
TO COUNCIL NETWORK 1000 CONFIRMED ONSITE
(375mm discharge) TO
1500
BE RELOCATED AS SHOWN
750
DANLEY KEY JOINT WITH 20 X 40 JOINT SEALANT
DRIVEWAY CROSSOVER TO
750
1500
COMPLY WITH RS-051 STORMWATER EASEMENT R12 DOWELS AT 300CRS
Provide 1 No 40mm EXISTING 150MM
Water Meter in accordance WATERMAIN - TYPICAL KEY JOINT
Not to scale
with drawings SCW350, 355 and ASSET ID - 203369 CUT EVERY SECOND WIRE DIRECTLY
6000
360 UNDER JOINT AND DEPRESS FABRIC LOCALLY
EXTEND EXISTING 150MM VEGETATION PROTECTION NOTES REVISION LIST
WATER MAIN TO SERVICE 1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIORTO A ORIGINAL ISSUE 11/02/22
CONSTRUCTION, OR REPLACED IF DESTROYED.
PROPOSED WATER METER SAW CUT - (SC)
2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
FOR EXISTING INDUSTRIAL CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
Not to Scale
LOCATION OF DRIVEWAY CROSSOVER SAW CUTS (USING A SOFT CUT SAW)
SHEDS GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND SHALL BE INSTALLED WITHING 8HRS
EXISTING 40MM WATER SHOWN FOR APPROVAL PURPOSES TO OF CONCRETE PLACEMENT. WHERE AMBIENT
REMAIN UNTIL COMPLETION. TEMP IS GREATER THAN 32 DEGREES
33498 METER CURRENTLY BEING A CODE COMPLIANT DRIVEWAY IS POSSIBLE. 3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE THIS TIME SHALL BE REDUCED TO 4 HOURS
USED BY EXISTING PROPOSED LOT DEVELOPER REQUIRED SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT SL82 FABRIC (CENTRAL)
INDUSTRIAL SHEDS. TO BE TO PROVIDE COUNCIL WITH DRIVEWAY RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
DISCONNECTED FROM CROSSOVER LOCATION 4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.
OPERATIONAL WORKS SHEDS AND MADE
AVAILABLE TO PROPOSED PAVEMENT DESIGN
Not to Scale
LOT
150
Protect your
KEY JOINT
PERSONAL
INTERESTS.
HEAD
SAW JOINT
EYES
EARS
BODY
It is the responsibility of the All proposed operational works shall be constructed
NOTE Foreman to contact the
HANDS
THE ENGINEER MUST BE NOTIFIED OF relevant service authorities to in accordance with Council's Operational Works approval Computer File
PROPOSED EASEMENT FEET
CHANGES PLANS. IF NOT, AS
CONSTRUCTED DRAWINGS WILL NOT BE
ISSUED
ascertain the exact location of
services prior to construction.
letter and Council's Decision Notice - Development Permit. PAVEMENT DETAILS - CONCRETE SURFACE
Not to scale
031159CP.DWG
DRAWING NUMBER SHEET REV.
03-1159-C1 1 A
Document Set ID: 21825014
Version: 1, Version Date: 17/02/2022
Page 3
EROSION AND SEDIMENTATION MANAGEMENT PLAN ENVIRONMENTAL DIARY CONSTRUCTION MANAGEMENT PLAN
Sediment Control Weekly Visual Inspection or After Rainfall Event
Project:- Operational Works Performance
Indicators
Item Performance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY
Principal:-
Contractor:- GE & LK GRAMS
Objective Comply with all statutory regulations and maintain erosion and sedimentation 1. Vegetation No disturbance of soil below retained vegetation due to construction Weekly Visual Inspection or After Rainfall Event
Location:- 53-57 RENE ST, NOOSAVILLE
controls throughout the duration of construction. Comply with the intent of the activities.
Job Ref. 03-1129OW Project:- Operational Works
sedimentation management plan shown on sheet 29 of the drawings prepared
No:- No work conducted outside specified hours without satisfactory evidence Principal:-
by Noel Covey & Associates, and other measures as deemed necessary to Date:- Regular Monitoring (Weekly) 2. Hours of Work
LINDSAY CONSULTING PTY LTD
control erosion and minimise sediment transport. of measures taken to suppress noise and other emissions / dust. Contractor:- GE & LK GRAMS LINDSAY CONSULTING PTY
Approx Time:- am/pm Special Event Monitoring (briefly describe event) Location:-
LTD
53-57 RENE ST, NOOSAVILLE
Date Condition Corrective 3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 03-1129OW Council File Ref. No.
Management Strategy Site Foreman to identify direction of stormwater land flows and flows resulting Item Control Acceptable Action Corrective Action Taken
from construction, and provide sediment fences, rock filter dams, turf strips, Monitored Measure Required (Describe) Date:- Regular Monitoring (Weekly) RPEQ 4928
stormwater pit entry filters, and other measures as shown on the plan or as Installed ü û 4. Existing Roads No abutting public roads contain soil, gravel, clay or other such
materials originating from onsite construction activities. Approx Time:- am/pm Special Event Monitoring (briefly describe event) OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
deemed necessary to prevent uncontrolled stormwater flows over unprotected
areas, and avoid sediment transport to waterways and stormwater pits. Sediment
Fences 5. Signage No observed or reported incidents due to inadequacy or absence of Date Control
Condition C orrective Action
Corrective Action Taken
THIS DRAWING REMAINS THE PROPERTY OF
signage or other control measures. Item Monitored
Measure Installed
Acceptable Required
(Describe) LINDSAY CONSULTING PTY LTD AND IS FOR
Tasks and Actions Erect sediment barriers required, and at other locations as deemed necessary by THE SOLE USE OF THE CLIENT. NO PART
ü
Rock
û
6. Waste Control No complaints from local residents and site is kept tidy at all time
Required visual inspection. Temporary rock filter dams are to be placed at all
concentrated stormwater flow outlet locations and maintained with fresh filter
Filter
Dams Retained Vegetation MAY BE USED IN PART OR WHOLE WITHOUT
screenings throughout the duration of construction. All earthworks areas to be 7. Waste Minimisation No occurrence of illegal dumping onsite and all materials where possible PRIOR EXPRESS WRITTEN CONSENT OF
topsoiled and seeded or hydromulched upon completion of profiling. All footpath
areas to be provided with a minimum 4m wide turf strip behind kerb and
Stormwater
have been appropriately recycled. Air Emissions
LINDSAY CONSULTING PTY LTD
Outlets
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
channel immediately after footpath area construction and topsoil profiling is
completed. Strategically place filters around all stormwater pits.
Noise
CLIENT AND PROJECT DESCRIPTION
Catchpit 9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
Areas
GE & LK GRAMS
Security Lighting
No works are carried out without implementation of the approved Traffic
PROPOSED SUBDIVISION
Performance Indicators Site Foreman to - 10. Traffic Management Vibrations
check for erosion and sediment flows at base of all embankments Pavement Management Plan.
Areas
·
and other
53-57 RENE ST
11. Existing Infrastructure Existing Utilities, Roads & Drainage Infrastructure
exposed areas after rain; No unplanned damage to existing utilities and infrastructure.
check that rock filter dams are working during rain periods; Bottom
NOOSAVILLE
·
check that all sediment fences and other erosion control of 12. Non Conformances Construction Traffic & Parking
·
Embankment All non conformances have been reported and rectified
mechanisms are
working during rain periods; and Humeceptors/ The site foreman is to monitor the performance of all construction activities and any departure from the Waste Minimisation & Recycling
clean and maintain filter fabric covers to pits after rain periods. Gross Monitoring Construction Management Plan control measures is to be immediately rectified.
·
Pollutant
Traps Erosion & Sedimentation Control (Environmental Diary)
Monitoring Site Foreman to monitor performance of all sediment controls on a
regular weekly basis and after every rainfall event. Any damaged Detention Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management
Basin
Other
sediment control item is to be rectified, and trapped silt removed and Person Plan.
deposited in an area not prone to erosion.
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for
DRAWING TITLE
CONSTRUCTION M'MENT PLAN
Item Monitored
Other sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
Responsible Person Site Foreman to be responsible for all inspections and maintenance of sediment causes site runoff) or other special event affecting the site or any watercourses traversing the site.
control measures. Any Special Comments:-
Signed:-
Reporting The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed
and delivered to the Superintendent for record and audit purposes with each progress claim for the
Any Special Comments:- STREET PARKING
Reporting Site Foreman is to complete the Environmental Diary for sediment control on a construction works.
weekly basis as a minimum, but also after every significant rainfall event or other
special event affecting the sediment control measures. The Environmental Diary
shall be completed and delivered to the Superintendent for record and audit The site foreman is to arrange all corrective actions, controls and rectification activities, and report on Signed:-
Corrective
purposes with each progress claim for the construction works.
Actions all measures taken in the Construction Management Plan Diary. SCALES
Corrective Actions The Site Foreman to arrange for installation of additional sediment
controls and/or improve maintenance controls and replacement of
screenings to filter dams as required, and report on measures taken in
the Environmental Diary.
CONSTRUCTION MANAGEMENT PLAN
Objective To comply with all statutory regulations and relevant policies, and minimise the impact on the Construction 11. Implement the erosion and sedimentation control measures and associated management plan contained
environment whilst carrying out construction activities in a safe and sustainable manner. Management in the approved plans.
Tasks and Actions
Required 12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to SURVEY DATUM
minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
stormwater system.
Management
Strategy
To minimise the environmental and amenity impact of construction activities through onsite proactive
approach to construction processes and consequences (cause and effect). Successful integration of
13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted
soil from leaving the site via vehicle tyres.
.
activities will achieve ecological sustainability which is recognised as a balance that integrates the 14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
protection of ecological processes and natural systems, economic development, and maintenance of point.
cultural, economic, physical and social wellbeing of people in communities. 15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
or whenever inspection shows signs of soil / pavement construction material on an abutting road or
ASSOCIATED CONSULTANTS
at the nominated site entrance.
Construction The following schedule of management strategies, tasks and actions for construction works forms the
Management 16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
basis of sustainable management of site construction issues. Irrespective of whether or not an item is
Tasks and Actions not attracted to poorly disposed of materials. Any waste or materials that have
Required included in the following schedule however, the Contractor shall employ best practice measures to
been illegally dumped on site shall be removed.
achieve sustainable outcomes at all times.
17. The Contractor shall provide bins for staff and sub contractors at locations
Management Strategy / Action where food is consumed and shall ensure that such bins are used and emptied at
regular intervals.
1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
18. All materials, be they construction materials or used containers, shall either be
impacts and required minimum environmental control measures and responsibilities before
recycled onsite or alternatively transported to a Council approved recycling station -
commencement of any site works.
or disposal point.
2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise 19. Any distillate or other petroleum products or dangerous goods stored onsite are APPROVED PLAN
minimised in accordance with the approved plans. to be in bunded areas, located well clear of any watercourse. Appropriate spill
3. No dust emissions shall extend beyond the boundary of the site. control kits for any chemicals or stored fuels shall also be provided onsite. RAL21/0028
NOOSA COUNCIL
20. Best practice management techniques shall be employed to control erosion and
4. No odour emissions are detectable beyond the boundary of the site. minimise sediment transport onsite, including those details contained in the
25 MARCH 2022
5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the approved plans and the Erosion and Sedimentation Management Plan.
hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by 21. The Contractor shall prepare and implement an approved Traffic Management
EXISTING neighbouring residents if any work activity with the potential to emit excessive noise is to be Plan for site construction activities. The Traffic Management Plan shall be
DRIVEWAY undertaken outside the above mentioned hours, and even with such consent, such activities are to be provided to the Council inspector and the Supervising Engineer at the prestart
PROPOSED
minimised. meeting.
22. Comply with any conditions of Council's operational works approval applicable to
DRIVEWAY
6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
the works.
that equipment does not create environmental harm or excessive noise.
23. All public complaints received by the Contractor must be recorded in writing,
7.Temporary security lighting for the site must be designed and located to ensure that its effects are including any investigations undertaken, conclusions reached and actions taken as
not obtrusive and direct light spill does not alter the amenity of adjacent properties. a result of same. This complaints record is to be made available to the
administering authority on request.
8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
protected and maintained at all times, with the cost of any damage to such infrastructure to be
24. All site personnel are to report any significant non-conformances to the site REVISION LIST
met by the Contractor.
manager as soon as practical and within 1 hour of the occurrence of, or A ORIGINAL ISSUE 11/02/22
observance of same.
9. Any areas of high risk / danger on the site are to be adequately signposted. 25. The contractor shall prepare an informative letter to be dropped to
10. Vibration beyond the site boundary from construction activities is to be minimised and where there is residents/businesses adjacent to the development. The letter is to advise contact
a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the details for communications for the site manager, working hours, projected timing
property owner shall be advised accordingly. of works and any other information the contractor sees relevant.
PARKIN
G LAYO
ON ST UT SH
REET OWING
CAR PA THE LO
RKING SS OF
OF TH PLACES TWO
E PROP AS A
OSED RESULT
DRIVEW
AY
Computer File
031159CP.DWG
DRAWING NUMBER SHEET REV.
03-1159-C2 2 A
Document Set ID: 21825014
Version: 1, Version Date: 17/02/2022