Approved Plans - RAL21-0028

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                     -
                                               APPROVED PLAN
                                                  RAL21/0028
                                               NOOSA COUNCIL
                                                25 MARCH 2022




                                       Lot 1      Lot 2




Document Set ID: 21713940
Version: 1, Version Date: 26/11/2021
Log in to download the original file

Approved Plans - RAL21-0028.pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

                                                                                                                                                                                                                                                                                                                                               GENERAL NOTES
                                                                                                                                                  1500                                                                                                                                                                                          1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS
                                                                                                                                                                                                                                                                                                                                                DRAWINGS AND SPECIFICATIONS. 2. BEFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES




                                                                                                                                   1500
                                                                                                                                                                                                                                                                                                                                                IN THE CONTRACT DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.




                                                                                                                            3000
                                                                                                                                                                                                                                                                                                                                                3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!
                                                                                                                                                                                           PROPOSED 100MM UPVC SEWER LINE 23930MM                                                                                                               4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND LEVELS
                                                                                                                                                                                                                                                                                                                                                5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE (INCLUDING
                                                                                                                                                                                                                                       UNITY WATER ASSET                                                                                        THE QUEENSLAND SUPPLEMENT), THE QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND
                                                                                                                                                                       PROPOSED MANHOLE                                                                                                                                                         6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO
                                                                                                                                                                                                                                       MANHOLE 1050                                                                                             7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE uPVC
                                                                                                                          EXISTING BLOCKWORK                           MANHOLE 1050                                                    ASSET ID - 2663533                                                                                       8. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND
                                                                                                                          RETAINING WALL 1M                            ASSET ID - TBA                                                  S.L - 11.17                                                                                              9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH                                                                                                                                                                                   LINDSAY CONSULTING PTY LTD




                                                                                                                          APPROX THROUGHOUT                            S.L - 14.00                                                     I.L - 8.56                                                                                               COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION
                                                                                                                                                                                                                                                                           SEWER EASEMENT                                                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY
                                                                                                                                                                       I.L - 8.56                                                                                                                                                               10.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD                                                                                                                                                                                                    LTD
                                                                                                                                                                       PROPOSED HCB TO ALLOW                                                                                                                                                    DRAWING AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD
                                                                                                                                                                       FOR 1% MIN GRADE FROM                                                                                                                                                    11. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY WITH
                                                                                                                                                                                                                                                                                                                                                THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
                                                                                                                                                                       INTERNAL SEWER LINE.                                                                                                                                                                                                                                                                                                                                                                                                                                                                   RPEQ 4928
                                                                                                                                                                                                                                                                                                                                                MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT". COUNCIL DOES NOT
                                                            DRIVEWAY                                                                                                   ESTIMATED IL - 13.184                                                                                                                                                    APPROVE OF BLACKING OUT OF EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED                                                                                                                                                                          OFF. 2C/82 PARKER STREET, MAROOCHYDORE            PH 54 792 118
                                                                                                                                                                                                                                                                                                                                                FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT ROAD CROSSINGS AS
                                                                                                                                                                                                                                                                                                                                                APPLICABLE.                                                                                                                                                                                                                                              THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         MAY BE USED IN PART OR WHOLE WITHOUT
                      EXISTING INDUSTRIAL SHED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LINDSAY CONSULTING PTY LTD
                                                                                                                                                                                                                                                                                                                                              STORMWATER DRAINAGE NOTES
                                                                                                                                                                                                                                                                                                                                               1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO CARRYING OUT
                                                                                                                                                                                                                                                                                                                                               OF THE WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CLIENT AND PROJECT DESCRIPTION
                                                                                                                                                                               EXISTING SEWER
                                                                                                                                                                                                                                                                                                                                               2.ALL LEVELS TO AHD.
                                                                                                                                                                                                                                                                                                                                               3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                                                                               4.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE BEFORE WORK COMMENCES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           GE & LK GRAMS
                                                                                                                                                                               LINE FROM INDUSTRIAL
                                                                                                                                                                               SHEDS TO MANHOLE.
                                                                                                                                                                               LINE TO BE DISCONTINED/
                                                                                                                                                                                                                                                                                                                                               5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING.
                                                                                                                                                                                                                                                                                                                                               6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS                                                                                                                                                                                                        PROPOSED SUBDIVISION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           53-57 RENE ST
                                                                                                                                                                                                                                                                                                                                               7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE VERIFIED ON SITE WITH THE
                                                                                                                                                                               MADE REDUNDANT                                                                                                                                                  REVLEVANT AUTHORITY PRIOR TO THE COMMENCEMENT OF WORKS
                                                                                                                                                                               1500 SHORT OF PROPOSED                                                                                                                                          8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE


                                                            DRIVEWAY
                                                                                                                                                                               BOUNDARY AND DIRECTED
                                                                                                                                                                               TO PROPOSED HCB
                                                                                                                                                                                                                                                                                                                                               PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE
                                                                                                                                                                                                                                                                                                                                               LOCAL AUTHORITY.
                                                                                                                                                                                                                                                                                                                                               9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITIES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           NOOSAVILLE
                                                                                                                                                                                                                                                                                                                                               SPECIFICATIONS AND STANDARDS.
                                                                                                                                                                                                                                                                                                                                               10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES
                                                                                                                                                                                                                                                                                                                                               AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING
                                                                                                                                                                                                                                                                                                                                               SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE FOOTPATHS
                                                                                                                                                                                                                                                                                                                                               AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION.
                                                                                                                                                                                                                                                                                                                                               11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND DRAINAGE OUTLETS FROM THE
                                                                                                                                                                                                                                                                                                                                               KERB AND CHANNEL INCLUDING ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE                                                                                                                                                                                 DRAWING TITLE
                                                                                                                         EXISTING BLOCKWORK                                                                                                                                                                                                    REMOVED AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO THE LOCAL
                                                                                                                         RETAINING WALL 1M                                                                                                                                                                                                     AUTHORITIES CURRENT SPECIFICATIONS AND OR STANDARDS
                                                                                                                                                                                                                                                                                                                                               12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF THE WORKPLACE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           OPERATIONAL WORKS
                                                                                                                         APPROX THROUGHOUT
                                                                                                                                                                                                                                                                                                                                               HEALTH AND SAFETY ACT 1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS
                                                                                                                                                                                                                                                                                                                                               ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE THE REQUIREMENTS OF THIS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           WATER AND SEWER
                                                                                                                                                                                                                                                                                                                                               SPECIFICATION WITH REGARD TO 'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE
                                                                                                                                                                                                                                                                                                                                               FULFILLED.




                                                                                                                                                                               1
                                                                                                                                                                                                                                                                                                                                               13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH FINISHED SURFACE, AND PIPES




                                                                                                                                                                        2
                                                                                                                                                                                                                                                                                                                                               SHALL NOT PROJECT INSIDE THE SHAFT OF THE PIT.




                                                                                                                                                                     43
                      EXISTING INDUSTRIAL SHED                                                                                                                                                                                                                                                                                                 14.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE (MINIMUM SEWER CLASS SN8) TO AS
                                                                                                                                                                                                                                                                                                                                               14. 1260 OR APPROVED EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE 50mm
                                                                                                                                                                                                                                                                                                                                               EXCEPT WHERE REDUCED COVER IS REQUIRED TO DISCHARGE TO THE KERB AND CHANNEL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SCALES




                                                                                                                                                            0
                                                                                                                                                                                                                                                                                                                                               15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3: PIPES SHALL COMPLY WITH




                                                                                                                                                         P1
                                                                                                                                                                                                                                                                                                                                                           - 1.0% (MIN) GRADE FOR PIPES < 150 DIA.
                                                                                                                                                                                                                                                                                                                                                           - 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.




                                                                                                                                                 nS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      A1 - 1:200
                                                                                                                                                                                                                                                                                                                                               16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE CONSTRUCTED WITH 32 MPa
                                                           DRIVEWAY                                                                                                                                                                                                                                                                            17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE LAYOUTS.
                                                                                                                                                                                                                                                                                                                                               18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS AND PARKING AREAS SHALL BE
                                                                                                                                                                                                                                                                                                                                                           (i) 75% MINIMUM DENSITY FOR COHESIONLESS MATERIAL (AS 1289 E5.1) AND
                                                                                                                           1o
                                                                                                                                                                                                                                                                                                                                                           (ii) 90% RELATIVE DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)
                                                                                                                T        28
                                                                                                             LO




                                                                                                                                                                                                                                                                                                                                                                                                                   Expansion joints:
                                                                                                                                                                                                                                                                                                                                                                                                        Types 1 and 2 at 16.0m centres
                                                                                                                                                                                                                                                                                                                                                                                                              Types 3 at 6.0m centres
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SURVEY DATUM
                                                                                                                                                                                                                                                                                                                                                                                   Type 1. 10 thick, full depth closed cell cross linked
                                                                                                                                                                                                                                                                                                                                                                                                         polyethylene foam (85-150kg/m )



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                                                                                                                                   Type 2. 10 thick compressed granulated cork board
                                                                                                                                                                                                                                                                                                                                                                                 Type 3. Connolly Key Joint with 100mm thick concrete
                                                                                                                                                                                                                                                                                                                                                                                          Installation to manufacturers' instructions                           B




                                                                                                                                                                                                                                                                                                                       MATCH EXISTING
                                         EXISTING CARPARK AND DRIVEWAY                                                                                                                                                                                                                                             C                                                                                                                                                                                                                             C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                                                                                                                         Contraction joints at 2.0m centres:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                B
                                                                                                                                                                                                                                                                                                                                                         25 deep x 6 wide recess, saw cut,                                         PLAN




                                                                                                                                                                                                                                                                                                                                                                                                     100 or as specified
                                                                                                                                                                                                                                                                                                                                                         or crack inducer 25 deep.




                                                                                                                                                                                                                                                                                                                                                                                                     refer note 5
                                                                                                                                                                                                                                                                                                                                                                                                                                                         F72 Fabric (CENTRAL)

                                                                                                                           EXISTING BLOCKWORK
                                                                                                                           RETAINING WALL 1M                                             PROPOSED BOUNDARY                                                                                                                                            Contraction joint                                                            Compacted sub-grade
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Expansion Joint
                                                                                                                           APPROX THROUGHOUT                                                                                                                                                                                                                                                                               SECTION C - C
                                                                                                                                                                                                                                                                                                                                              1450
                                                                                                                                                                                                                                                                                                                                        TO BE CONFIRMED ON-SITE
                                                                                                                                                                                                                                                                                                                                                                          1200
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          APPROVED PLAN
                     EXISTING BLOCKWORK
                     RETAINING WALL REDUCING                                                                                                                                                                                                                                                                                                                                                                                FOOTPATH NOTES
                     TO APPROX 300MM                                                                                                                                                                                                                                                                                                                                                                                        1. Concrete N25 in accordance with AS 1379 and AS 3600.            6. Concrete footpaths, adjoining existing driveways are to be
                                                                                                                                                                                                                                                                                                                                                                                                                            2. All concrete to be broom finished.                                 transitioned over a minimum 5.0m length.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             RAL21/0028
                                                                                                                                                                                                                                                                                                                                                              SECTION B-B                                                   3. Contraction/expansion joints, 2m MAX spacing.                   7. A street opening permit must be obtained from Council, seek
                                                                                                                                                                                                                                                                                                                                                                                                                            4. Finished surface tolerance to be maximum +6mm -0mm     relative    approval of location and levels prior to excavation.
                                                                                                                                                                                                                                                                                                                                                                                                                               to kerb level and crossfall specified.                          8. All dimensions in millimetres.
                                                                                                                                                                                                                                                                                                                                                                                                                            5. Thickness to be increased to 125mm at residential vehicular


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          NOOSA COUNCIL
                                                                         GRASS/LANDSCAPINGPROPOSED 600 X 600                                                                                                                                                                                                                                                                                                                   crossings. Reinforce with F72 MIN fabric, 50mm top and edge
                                                                                                                                                                                                                                                                                                                                                                                                                               cover. Provide a contraction or expansion joint at both ends

                                                                                                             STORMWATER PIT. ALL                                                                                                                                                                                                                                                                                               of thickened section.



                       GRASS/LANDSCAPING
                                                                                                             INTERAL STORMWATER
                                                                                                             TO BE DIRECTED TO                                                  225 UPVC- MIN GRADE 1%
                                                                                                                                                                                                                            - 24045 NOM.                            900X900 FEILD INLET
                                                                                                                                                                                                                                                                                                                                                                                                   FOOTPATH DETAIL - IF REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                           Not to scale                                                                                                                                                                                                    25 MARCH 2022
                                                                                                             THIS PIT FOR DISCHARGE                                                                                                                                 ALL LEVELS TO BE
                                                                                                             TO COUNCIL NETWORK                                  1000                                                                                               CONFIRMED ONSITE
                                                                                                                                                                                                                                                                    (375mm discharge) TO
                                                                                                                                          1500




                                                                                                                                                                                                                                                                    BE RELOCATED AS SHOWN
                                                                                                                                                                                                                                                              750




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        DANLEY KEY JOINT WITH                                                  20 X 40 JOINT SEALANT
                                                                                                                                                                                                                     DRIVEWAY CROSSOVER TO
                                                                                                                                                 750




                                                                                                                                                       1500
                                                                                                                                                                                                                     COMPLY WITH RS-051                                       STORMWATER EASEMENT                                                                                                                                                                                                       R12 DOWELS AT 300CRS

                                                                                       Provide 1 No 40mm                                                                                                                                                      EXISTING 150MM
                                                                                       Water Meter in accordance                                                                                                                                              WATERMAIN -                                                                                                                                                                                                                                                                          TYPICAL KEY JOINT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Not to scale
                                                                                       with drawings SCW350, 355 and                                                                                                                                          ASSET ID - 203369                                                                                                                                                                                                                                         CUT EVERY SECOND WIRE DIRECTLY
                                                                                                                                                                                                                                6000
                                                                                       360                                                                                                                                                                                                                                                                                                                                                                                                                              UNDER JOINT AND DEPRESS FABRIC LOCALLY
                                                                                                          EXTEND EXISTING 150MM                                                                                                                                                                VEGETATION            PROTECTION NOTES                                                                                                                                                                                                                                                                   REVISION LIST
                                                                                                          WATER MAIN TO SERVICE                                                                                                                                                                1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIORTO                                                                                                                                                                                                                                       A ORIGINAL ISSUE                                         11/02/22
                                                                                                                                                                                                                                                                                               CONSTRUCTION, OR REPLACED IF DESTROYED.
                                                                                                          PROPOSED WATER METER                                                                                                                                                                                                                                                                                                                                                                                                                            SAW CUT - (SC)
                                                                                                                                                                                                                                                                                               2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
                                                                                                          FOR EXISTING INDUSTRIAL                                                                                                                                                              CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Not to Scale

                                                                                                                                                                                                                                             LOCATION OF DRIVEWAY CROSSOVER                                                                                                                                                                                                                                                  SAW CUTS (USING A SOFT CUT SAW)
                                                                                                          SHEDS                                                                                                                                                                                GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND                                                                                                                                                    SHALL BE INSTALLED WITHING 8HRS
                                                                                                                           EXISTING 40MM WATER                                                                                               SHOWN FOR APPROVAL PURPOSES TO                                                                                                                                                                                                                                                  OF CONCRETE PLACEMENT. WHERE AMBIENT
                                                                                                                                                                                                                                                                                               REMAIN UNTIL COMPLETION.                                                                                                                                                                                                      TEMP IS GREATER THAN 32 DEGREES
                                                                                                         33498             METER CURRENTLY BEING                                                                                             A CODE COMPLIANT DRIVEWAY IS POSSIBLE.            3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE                                                                                                                                                     THIS TIME SHALL BE REDUCED TO 4 HOURS
                                                                                                                           USED BY EXISTING                                                                                                  PROPOSED LOT DEVELOPER REQUIRED                   SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT                                                                                                                                                                                                    SL82 FABRIC (CENTRAL)
                                                                                                                           INDUSTRIAL SHEDS. TO BE                                                                                           TO PROVIDE COUNCIL WITH DRIVEWAY                  RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                                                           DISCONNECTED FROM                                                                                                 CROSSOVER LOCATION                                4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.
                                                                                        OPERATIONAL WORKS                  SHEDS AND MADE
                                                                                                                           AVAILABLE TO PROPOSED                                                                                                                                                                                                                                                                                                                                                                                                      PAVEMENT DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Not to Scale
                                                                                                                           LOT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              150
                                                                                                   Protect   your




                     KEY JOINT
                                                                                                   PERSONAL

                                                                                                   INTERESTS.


                                                                                                     HEAD


                     SAW JOINT
                                                                                                   EYES
                                                                                                   EARS
                                                                                                              BODY
                                                                                                                                                              It is the responsibility of the                  All proposed operational works shall be constructed
                                                                                                                     NOTE                                     Foreman to contact the
                                                                                           HANDS
                                                                                                                     THE ENGINEER MUST BE NOTIFIED OF         relevant service authorities to                  in accordance with Council's Operational Works approval                                                                                                                                                                                                                                                                                                                                 Computer File
                     PROPOSED EASEMENT                                                         FEET
                                                                                                                     CHANGES PLANS. IF NOT, AS
                                                                                                                     CONSTRUCTED DRAWINGS WILL NOT BE
                                                                                                                     ISSUED
                                                                                                                                                              ascertain the exact location of
                                                                                                                                                              services prior to construction.
                                                                                                                                                                                                               letter and Council's Decision Notice - Development Permit.                                                                                                                                                                                                                                           PAVEMENT DETAILS - CONCRETE SURFACE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Not to scale
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DRAWING NUMBER                                         SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          03-1159-C1            1 A
Document Set ID: 21825014
Version: 1, Version Date: 17/02/2022

Page 3

                                 EROSION AND SEDIMENTATION MANAGEMENT PLAN                                                ENVIRONMENTAL DIARY                                                                                                                                                                                                                             CONSTRUCTION MANAGEMENT PLAN
                                                                                                                          Sediment Control                                                                         Weekly Visual Inspection or After Rainfall Event
                                                                                                                          Project:-                      Operational Works                                                                                                Performance
                                                                                                                                                                                                                                                                          Indicators
                                                                                                                                                                                                                                                                                                         Item                                       Performance Indicator                CONSTRUCTION MANAGEMENT PLAN DIARY
                                                                                                                          Principal:-
                                                                                                                          Contractor:-                   GE & LK GRAMS
           Objective                Comply with all statutory regulations and maintain erosion and sedimentation                                                                                                                                                                         1. Vegetation                      No disturbance of soil below retained vegetation due to construction                                                                                                                              Weekly Visual Inspection or After Rainfall Event
                                                                                                                          Location:-                     53-57 RENE ST, NOOSAVILLE
                                    controls throughout the duration of construction. Comply with the intent of the                                                                                                                                                                                                         activities.
                                                                                                                          Job Ref.                       03-1129OW                                                                                                                                                                                                                                         Project:-                                Operational Works
                                    sedimentation management plan shown on sheet 29 of the drawings prepared
                                                                                                                          No:-                                                                                                                                                                                              No work conducted outside specified hours without satisfactory evidence        Principal:-
                                    by Noel Covey & Associates, and other measures as deemed necessary to                 Date:-                                   Regular Monitoring (Weekly)                                                                                           2. Hours of Work
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       LINDSAY CONSULTING PTY LTD




                                    control erosion and minimise sediment transport.                                                                                                                                                                                                                                        of measures taken to suppress noise and other emissions / dust.                Contractor:-                              GE & LK GRAMS                                                                                                                   LINDSAY CONSULTING PTY
                                                                                                                          Approx Time:-                 am/pm      Special Event Monitoring (briefly describe event)                                                                                                                                                                                       Location:-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                                     53-57 RENE ST, NOOSAVILLE
                                                                                                                                                     Date    Condition Corrective                                                                                                        3. Lighting                        No resident's complaints regarding construction security lighting.             Job Ref. No:-                             03-1129OW                                                                    Council File Ref. No.
           Management Strategy      Site Foreman to identify direction of stormwater land flows and flows resulting             Item                Control Acceptable   Action                                  Corrective Action Taken
                                    from construction, and provide sediment fences, rock filter dams, turf strips,            Monitored            Measure              Required                                        (Describe)                                                                                                                                                                         Date:-                                                                   Regular Monitoring (Weekly)                                                                                                                          RPEQ 4928
                                    stormwater pit entry filters, and other measures as shown on the plan or as                                    Installed    ü          û                                                                                                             4. Existing Roads                  No abutting public roads contain soil, gravel, clay or other such
                                                                                                                                                                                                                                                                                                                            materials originating from onsite construction activities.                     Approx Time:-                                           am/pm            Special Event Monitoring (briefly describe event)                                                OFF. 2C/82 PARKER STREET, MAROOCHYDORE            PH 54 792 118
                                    deemed necessary to prevent uncontrolled stormwater flows over unprotected
                                    areas, and avoid sediment transport to waterways and stormwater pits.                      Sediment
                                                                                                                                Fences                                                                                                                                                   5. Signage                         No observed or reported incidents due to inadequacy or absence of                                                                              Date Control
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Condition           C orrective Action
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Corrective Action Taken
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                            signage or other control measures.                                                                        Item   Monitored
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Measure Installed
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Acceptable                Required
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 (Describe)         LINDSAY CONSULTING PTY LTD AND IS FOR
           Tasks and Actions        Erect sediment barriers required, and at other locations as deemed necessary by                                                                                                                                                                                                                                                                                                                                                                                                                                                                   THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ü
                                                                                                                                 Rock
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              û
                                                                                                                                                                                                                                                                                         6. Waste Control                   No complaints from local residents and site is kept tidy at all time
           Required                 visual inspection. Temporary rock filter dams are to be placed at all
                                    concentrated stormwater flow outlet locations and maintained with fresh filter
                                                                                                                                 Filter
                                                                                                                                 Dams                                                                                                                                                                                                                                                                                       Retained Vegetation                                                                                                                                     MAY BE USED IN PART OR WHOLE WITHOUT
                                    screenings throughout the duration of construction. All earthworks areas to be                                                                                                                                                                       7. Waste Minimisation              No occurrence of illegal dumping onsite and all materials where possible                                                                                                                                                                                   PRIOR EXPRESS WRITTEN CONSENT OF
                                    topsoiled and seeded or hydromulched upon completion of profiling. All footpath
                                    areas to be provided with a minimum 4m wide turf strip behind kerb and
                                                                                                                             Stormwater
                                                                                                                                                                                                                                                                                                                            have been appropriately recycled.                                                                       Air Emissions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          LINDSAY CONSULTING PTY LTD
                                                                                                                               Outlets
                                                                                                                                                                                                                                                                                         8. Dangerous Goods                 No spillage or seepage of dangerous goods stored onsite.
                                    channel immediately after footpath area construction and topsoil profiling is
                                    completed. Strategically place filters around all stormwater pits.
                                                                                                                                                                                                                                                                                                                                                                                                                                       Noise

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   CLIENT AND PROJECT DESCRIPTION
                                                                                                                               Catchpit                                                                                                                                                  9. Erosion & Sedimentation         No visible signs of sediment laden waters leaving the site.
                                                                                                                                Areas
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      GE & LK GRAMS
                                                                                                                                                                                                                                                                                                                                                                                                                               Security Lighting

                                                                                                                                                                                                                                                                                                                            No works are carried out without implementation of the approved Traffic

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROPOSED SUBDIVISION
           Performance Indicators   Site Foreman to -                                                                                                                                                                                                                                    10. Traffic Management                                                                                                                     Vibrations


                                           check for erosion and sediment flows at base of all embankments                    Pavement                                                                                                                                                                                      Management Plan.
                                                                                                                                Areas
                                    ·
                                    and other
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      53-57 RENE ST
                                                                                                                                                                                                                                                                                         11. Existing Infrastructure                                                                                         Existing Utilities, Roads & Drainage Infrastructure
                                           exposed areas after rain;                                                                                                                                                                                                                                                        No unplanned damage to existing utilities and infrastructure.
                                           check that rock filter dams are working during rain periods;                       Bottom

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      NOOSAVILLE
                                    ·
                                           check that all sediment fences and other erosion control                             of                                                                                                                                                       12. Non Conformances                                                                                                         Construction Traffic & Parking
                                    ·
                                                                                                                            Embankment                                                                                                                                                                                      All non conformances have been reported and rectified
                                    mechanisms are
                                           working during rain periods; and                                                Humeceptors/                                                                                                                                                   The site foreman is to monitor the performance of all construction activities and any departure from the                    Waste Minimisation & Recycling
                                           clean and maintain filter fabric covers to pits after rain periods.                Gross                                                                                                                                       Monitoring      Construction Management Plan control measures is to be immediately rectified.
                                    ·
                                                                                                                             Pollutant
                                                                                                                              Traps                                                                                                                                                                                                                                                                        Erosion & Sedimentation Control (Environmental Diary)
           Monitoring               Site Foreman to monitor performance of all sediment controls on a
                                    regular weekly basis and after every rainfall event. Any damaged                          Detention                                                                                                                                   Responsible     The site foreman is to be responsible for all inspections and maintenance of the Construction Management
                                                                                                                                Basin
                                                                                                                                                                                                                                                                                                                                                                                                                                       Other

                                    sediment control item is to be rectified, and trapped silt removed and                                                                                                                                                                Person          Plan.
                                    deposited in an area not prone to erosion.
                                                                                                                                                                                                                                                                                          The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DRAWING TITLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONSTRUCTION M'MENT PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                Item    Monitored

                                                                                                                                Other                                                                                                                                                     sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
           Responsible Person       Site Foreman to be responsible for all inspections and maintenance of sediment                                                                                                                                                                        causes site runoff) or other special event affecting the site or any watercourses traversing the site.
                                    control measures.                                                                     Any Special Comments:-
                                                                                                                                                                                                                              Signed:-
                                                                                                                                                                                                                                                                          Reporting       The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed
                                                                                                                                                                                                                                                                                          and delivered to the Superintendent for record and audit purposes with each progress claim for the
                                                                                                                                                                                                                                                                                                                                                                                                           Any Special Comments:-                                                                                                                                                     STREET PARKING
           Reporting                Site Foreman is to complete the Environmental Diary for sediment control on a                                                                                                                                                                         construction works.
                                    weekly basis as a minimum, but also after every significant rainfall event or other
                                    special event affecting the sediment control measures. The Environmental Diary
                                    shall be completed and delivered to the Superintendent for record and audit                                                                                                                                                                           The site foreman is to arrange all corrective actions, controls and rectification activities, and report on                                                                                                                         Signed:-
                                                                                                                                                                                                                                                                          Corrective
                                    purposes with each progress claim for the construction works.
                                                                                                                                                                                                                                                                          Actions         all measures taken in the Construction Management Plan Diary.                                                                                                                                                                                                                            SCALES
           Corrective Actions       The Site Foreman to arrange for installation of additional sediment
                                    controls and/or improve maintenance controls and replacement of
                                    screenings to filter dams as required, and report on measures taken in
                                    the Environmental Diary.




                                                                                                                                                                                                                                                                                                                                                                        CONSTRUCTION MANAGEMENT PLAN
                                                                                                                                                                                                                                                                      Objective          To comply with all statutory regulations and relevant policies, and minimise the impact on the                 Construction                 11. Implement the erosion and sedimentation control measures and associated management plan contained
                                                                                                                                                                                                                                                                                         environment whilst carrying out construction activities in a safe and sustainable manner.                      Management                     in the approved plans.
                                                                                                                                                                                                                                                                                                                                                                                                        Tasks and Actions
                                                                                                                                                                                                                                                                                                                                                                                                        Required                     12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to                                            SURVEY DATUM
                                                                                                                                                                                                                                                                                                                                                                                                                                       minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
                                                                                                                                                                                                                                                                                                                                                                                                                                       stormwater system.
                                                                                                                                                                                                                                                                      Management
                                                                                                                                                                                                                                                                      Strategy
                                                                                                                                                                                                                                                                                         To minimise the environmental and amenity impact of construction activities through onsite proactive
                                                                                                                                                                                                                                                                                         approach to construction processes and consequences (cause and effect). Successful integration of
                                                                                                                                                                                                                                                                                                                                                                                                                                     13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted
                                                                                                                                                                                                                                                                                                                                                                                                                                       soil from leaving the site via vehicle tyres.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     .
                                                                                                                                                                                                                                                                                         activities will achieve ecological sustainability which is recognised as a balance that integrates the                                      14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
                                                                                                                                                                                                                                                                                         protection of ecological processes and natural systems, economic development, and maintenance of                                              point.
                                                                                                                                                                                                                                                                                         cultural, economic, physical and social wellbeing of people in communities.                                                                 15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
                                                                                                                                                                                                                                                                                                                                                                                                                                       or whenever inspection shows signs of soil / pavement construction material on an abutting road or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                                                                                                                                                                                                       at the nominated site entrance.
                                                                                                                                                                                                                                                                      Construction      The following schedule of management strategies, tasks and actions for construction works forms the
                                                                                                                                                                                                                                                                      Management                                                                                                                                                     16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
                                                                                                                                                                                                                                                                                        basis of sustainable management of site construction issues. Irrespective of whether or not an item is
                                                                                                                                                                                                                                                                      Tasks and Actions                                                                                                                                              not attracted to poorly disposed of materials. Any waste or materials that have
                                                                                                                                                                                                                                                                      Required          included in the following schedule however, the Contractor shall employ best practice measures to
                                                                                                                                                                                                                                                                                                                                                                                                                                     been illegally dumped on site shall be removed.
                                                                                                                                                                                                                                                                                         achieve sustainable outcomes at all times.
                                                                                                                                                                                                                                                                                                                                                                                                                                    17. The Contractor shall provide bins for staff and sub contractors at locations
                                                                                                                                                                                                                                                                                         Management Strategy / Action                                                                                                                where food is consumed and shall ensure that such bins are used and emptied at
                                                                                                                                                                                                                                                                                                                                                                                                                                     regular intervals.
                                                                                                                                                                                                                                                                                         1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                    18. All materials, be they construction materials or used containers, shall either be
                                                                                                                                                                                                                                                                                             impacts and required minimum environmental control measures and responsibilities before
                                                                                                                                                                                                                                                                                                                                                                                                                                     recycled onsite or alternatively transported to a Council approved recycling station                                                                                                          -
                                                                                                                                                                                                                                                                                             commencement of any site works.
                                                                                                                                                                                                                                                                                                                                                                                                                                     or disposal point.
                                                                                                                                                                                                                                                                                         2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise                                          19. Any distillate or other petroleum products or dangerous goods stored onsite are                                                                                                  APPROVED PLAN
                                                                                                                                                                                                                                                                                            minimised in accordance with the approved plans.                                                                                         to be in bunded areas, located well clear of any watercourse. Appropriate spill
                                                                                                                                                                                                                                                                                         3. No dust emissions shall extend beyond the boundary of the site.                                                                          control kits for any chemicals or stored fuels shall also be provided onsite.                                                                                                          RAL21/0028
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                                                                    20. Best practice management techniques shall be employed to control erosion and
                                                                                                                                                                                                                                                                                         4. No odour emissions are detectable beyond the boundary of the site.                                                                       minimise sediment transport onsite, including those details contained in the

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          25 MARCH 2022
                                                                                                                                                                                                                                                                                         5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the                                      approved plans and the Erosion and Sedimentation Management Plan.
                                                                                                                                                                                                                                                                                            hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by                                          21. The Contractor shall prepare and implement an approved Traffic Management
                                                                                                                                  EXISTING                                                                                                                                                  neighbouring residents if any work activity with the potential to emit excessive noise is to be                                          Plan for site construction activities. The Traffic Management Plan shall be
                                                                                                                                  DRIVEWAY                                                                                                                                                  undertaken outside the above mentioned hours, and even with such consent, such activities are to be                                      provided to the Council inspector and the Supervising Engineer at the prestart
                                                                                                                                                                                  PROPOSED
                                                                                                                                                                                                                                                                                            minimised.                                                                                                                               meeting.
                                                                                                                                                                                                                                                                                                                                                                                                                                    22. Comply with any conditions of Council's operational works approval applicable to
                                                                                                                                                                                  DRIVEWAY
                                                                                                                                                                                                                                                                                         6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
                                                                                                                                                                                                                                                                                                                                                                                                                                     the works.
                                                                                                                                                                                                                                                                                            that equipment does not create environmental harm or excessive noise.
                                                                                                                                                                                                                                                                                                                                                                                                                                    23. All public complaints received by the Contractor must be recorded in writing,
                                                                                                                                                                                                                                                                                         7.Temporary security lighting for the site must be designed and located to ensure that its effects are                                      including any investigations undertaken, conclusions reached and actions taken as
                                                                                                                                                                                                                                                                                            not obtrusive and direct light spill does not alter the amenity of adjacent properties.                                                  a result of same. This complaints record is to be made available to the
                                                                                                                                                                                                                                                                                                                                                                                                                                     administering authority on request.
                                                                                                                                                                                                                                                                                         8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
                                                                                                                                                                                                                                                                                            protected and maintained at all times, with the cost of any damage to such infrastructure to be
                                                                                                                                                                                                                                                                                                                                                                                                                                    24. All site personnel are to report any significant non-conformances to the site                                                              REVISION LIST
                                                                                                                                                                                                                                                                                            met by the Contractor.
                                                                                                                                                                                                                                                                                                                                                                                                                                     manager as soon as practical and within 1 hour of the occurrence of, or                                                                       A ORIGINAL ISSUE                                         11/02/22
                                                                                                                                                                                                                                                                                                                                                                                                                                     observance of same.
                                                                                                                                                                                                                                                                                         9. Any areas of high risk / danger on the site are to be adequately signposted.                                                            25. The contractor shall prepare an informative letter to be dropped to
                                                                                                                                                                                                                                                                                         10. Vibration beyond the site boundary from construction activities is to be minimised and where there is                                   residents/businesses adjacent to the development. The letter is to advise contact
                                                                                                                                                                                                                                                                                             a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the                                      details for communications for the site manager, working hours, projected timing
                                                                                                                                                                                                                                                                                             property owner shall be advised accordingly.                                                                                            of works and any other information the contractor sees relevant.



                                                                                                                                                                                                 PARKIN
                                                                                                                                                                                                        G LAYO
                                                                                                                                                                                                ON ST           UT SH
                                                                                                                                                                                                      REET            OWING
                                                                                                                                                                                                            CAR PA           THE LO
                                                                                                                                                                                                                   RKING            SS OF
                                                                                                                                                                                                         OF TH            PLACES          TWO
                                                                                                                                                                                                               E PROP             AS A
                                                                                                                                                                                                                      OSED              RESULT
                                                                                                                                                                                                                            DRIVEW
                                                                                                                                                                                                                                   AY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DRAWING NUMBER                                         SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     03-1159-C2            2 A
Document Set ID: 21825014
Version: 1, Version Date: 17/02/2022

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.