Engineering RFI Response Letter

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Our Ref: S22-121                                                                                                      Westera Partners Pty Ltd
                                                                                                                        Sunshine Coast Office
19 August 2022                                                                                                                     P 0437 335 403


Noosa Council
PO Box 141
Tewantin QLD 4565

Attention:                    Nadine Gorton

Council Ref:                  MCU22/0096


RE: RESPONSE TO COUNCIL’S REQUEST FOR INFORMATION ASSOCIATED WITH THE APPLICATION
LODGED FOR THE PROPOSED DEVELOPMENT AT 42 LUKES ROAD, COOROY MOUNTAIN


Requested Information:




Response
Refer to the accompanying Stormwater Management Plan prepared for this application.

Requested Information:




 SUNSHINE COAST                            B RIS BA NE                          GOLD COAST                              NORTHE RN NSW
 Suite 2, Norval Corporate Centre          Level 2, 33 Langland Street          Level 3, 17 Welch Street                Suite 24 Level 2
 13 Norval Court                           Newstead QLD 4006                    Southport QLD 4215                      11-13 Pearl Street
                                                                                                                        Kingscliff NSW 2487
 Maroochydore QLD 4558

 P: 07 5391 3777 F: 07 5646 5857           P: 07 3852 4333 F : 07 5646 5857     P: 07 5571 1599 F : 07 5646 5857        P: 02 6674 8047 F: 07 5646 5857

 PO Box 2016                               PO Box 2016                          PO Box 6138                             PO Box 1131
 Fortitude Valley BC, QLD 4006             Fortitude Valley BC, QLD 4006        Southport Mail Centre 9726              Kingscliff NSW 2487

 E: [email protected]   E: [email protected]   E: [email protected]     E: [email protected]
Log in to download the original file

Engineering RFI Response Letter.pdf · 466 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept design of the primary internal driveway including a longsection and typical cross section. The
internal driveways will be subject to further detailed design however this initial concept design should
provide Council with confirmation a compliant access arrangement can be achieved on site.

Requested Information:




Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept erosion and sediment control plans. A more detailed erosion and sediment control plan should
be prepared for the build phase of the project though.

Should you require further information in this regard, please do not hesitate to contact me at the Sunshine
Coast office.

Yours faithfully,




Jared Hill CPEng | RPEQ 19891
Associate | Senior Civil Engineer
Westera Partners Pty Ltd
                                                                                                         2

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.