Engineering RFI Response Letter
Our Ref: S22-121 Westera Partners Pty Ltd
Sunshine Coast Office
19 August 2022 P 0437 335 403
Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Nadine Gorton
Council Ref: MCU22/0096
RE: RESPONSE TO COUNCIL’S REQUEST FOR INFORMATION ASSOCIATED WITH THE APPLICATION
LODGED FOR THE PROPOSED DEVELOPMENT AT 42 LUKES ROAD, COOROY MOUNTAIN
Requested Information:
Response
Refer to the accompanying Stormwater Management Plan prepared for this application.
Requested Information:
SUNSHINE COAST B RIS BA NE GOLD COAST NORTHE RN NSW
Suite 2, Norval Corporate Centre Level 2, 33 Langland Street Level 3, 17 Welch Street Suite 24 Level 2
13 Norval Court Newstead QLD 4006 Southport QLD 4215 11-13 Pearl Street
Kingscliff NSW 2487
Maroochydore QLD 4558
P: 07 5391 3777 F: 07 5646 5857 P: 07 3852 4333 F : 07 5646 5857 P: 07 5571 1599 F : 07 5646 5857 P: 02 6674 8047 F: 07 5646 5857
PO Box 2016 PO Box 2016 PO Box 6138 PO Box 1131
Fortitude Valley BC, QLD 4006 Fortitude Valley BC, QLD 4006 Southport Mail Centre 9726 Kingscliff NSW 2487
E: [email protected] E: [email protected] E: [email protected] E: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept design of the primary internal driveway including a longsection and typical cross section. The
internal driveways will be subject to further detailed design however this initial concept design should
provide Council with confirmation a compliant access arrangement can be achieved on site.
Requested Information:
Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept erosion and sediment control plans. A more detailed erosion and sediment control plan should
be prepared for the build phase of the project though.
Should you require further information in this regard, please do not hesitate to contact me at the Sunshine
Coast office.
Yours faithfully,
Jared Hill CPEng | RPEQ 19891
Associate | Senior Civil Engineer
Westera Partners Pty Ltd
2