Engineering RFI Response Letter
Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept design of the primary internal driveway including a longsection and typical cross section. The
internal driveways will be subject to further detailed design however this initial concept design should
provide Council with confirmation a compliant access arrangement can be achieved on site.
Requested Information:
Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept erosion and sediment control plans. A more detailed erosion and sediment control plan should
be prepared for the build phase of the project though.
Should you require further information in this regard, please do not hesitate to contact me at the Sunshine
Coast office.
Yours faithfully,
Jared Hill CPEng | RPEQ 19891
Associate | Senior Civil Engineer
Westera Partners Pty Ltd
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.