Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Engineering RFI Response Letter

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept design of the primary internal driveway including a longsection and typical cross section. The
internal driveways will be subject to further detailed design however this initial concept design should
provide Council with confirmation a compliant access arrangement can be achieved on site.

Requested Information:




Response
Refer to the conceptual engineering plans contained within the Stormwater Management Plan for initial
concept erosion and sediment control plans. A more detailed erosion and sediment control plan should
be prepared for the build phase of the project though.

Should you require further information in this regard, please do not hesitate to contact me at the Sunshine
Coast office.

Yours faithfully,




Jared Hill CPEng | RPEQ 19891
Associate | Senior Civil Engineer
Westera Partners Pty Ltd
                                                                                                         2
Log in to download the original file

Engineering RFI Response Letter.pdf · 466 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.