COOROY MOUNTAIN HOUSE
GENERAL NOTES
ARCHITECTURAL DRAWINGS
* DO NOT SCALE DRAWINGS Larger scale drawings take precedence over smaller scale drawings. Noted dimensions take precedence over
scale. IF IN DOUBT, REFER TO OWNER.
SHEET NAME
* These drawings are to be read in conjunction with written specifications, all relevant consultants' drawings and other written instructions issued
during the course of the contract. A000 TITLE PAGE AND NOTES
* REPORT DISCREPANCIES, errors or ambiguities found in the drawings to the OWNER immediately for correction and/or direction.
All workmanship & materials are to be in accordance with the current Building Code of Australia, relevant Australian Standards including A001 NOTES AND LEGENDS
amendments and the requirements of Council and other authorities having jurisdiction. A102 OVERALL SITE PLAN
* Install materials, fixtures and fittings in accordance with manufacturers' specifications and recommendations and the requirements of A103 SITE PLAN (PARTIAL)
manufacturers' warranties.
* THE BUILDER SHALL VERIFY all locations, dimensions, levels, inverts, distances and features on site prior to commencement of any work or A300 GROUND FLOOR PLAN
the production of any shop drawings. Should existing conditions differ from those shown or indicated or if it appears that the contract A380 ROOF PLAN
documents do not adequately detail the work to be done, the Builder must notify the OWNER prior to continuing with related work. No
allowance will be made on behalf of the Builder for extra expenses resulting from the Builder's failure or neglect in determining the conditions A500 ELEVATIONS
under which the work is to be performed. A501 ELEVATIONS
* DO NOT WELD, GRIND, TORCH or otherwise generate sparks or open flames WHEN FLAMMABLE MATERIALS ARE IN CLOSE A700 DOOR & WINDOW SCHEDULE
PROXIMITY to the work area. When conducting such work, maintain fire extinguishers and/or working hoses within easy reach at all times.
* DO NOT SMOKE ON SITE A901 PERSPECTIVES
* MAINTAIN THE SITE in an ordered and clean manner. Sweep and remove rubbish as work progresses and at minimum daily intervals. A902 PERSPECTIVES
Subcontractors are to remove rubbish produced by their part of the work at minimum daily intervals and when complete.
* RECYCLE waste materials which display the universal recycling symbol as well as paper, cardboard, glass bottles and other suitable materials
A903 PERSPECTIVES
as advised by the waste management operator. Separate recyclable items from non-recyclable items during clean-up. Maintain clearly marked A904 PERSPECTIVES
bins / skips on site to facilitate this.
* NO TIMBERS FROM RAINFORESTS, OLD GROWTH FORESTS NOR OTHER SENSITIVE ECOSYSTEMS MAY ENTER THE SITE or be
used to build sub-assemblies off-site. Timbers used temporarily or permanently in the course of the work are to be sourced strictly from
sustainably managed forests or recycled sources. FSC-certified, Queensland Cypress pine, Queensland plantation pine, timbers sourced from INSULATION
Queensland farm forestry, and recycled timbers are deemed to meet these conditions. If in doubt, refer to the OWNER. (NOTE: 'DNA
1. STUD WALL EXTERNAL EARTHWOOL BATTS R 2.5 + MEDIUM DUTY WALL SARKING (VAPOUR PERMEABLE)
certification' alone does not satisfy this requirement).
2. CEILING EARTHWOOL BATTS R 3.0
* DO NOT WASTE WATER. Turn off taps to tank and mains water sources when no longer needed. Do not spray water unless absolutely 3. ROOF EARTHWOOL SPACE BLANKET R 1.5
necessary; sweep and mop when possible. Catch and reuse water when possible.
* Use water-based adhesives, sealers, finishes and treatments where available in preference to solvent-based solutions.
* Set out floor framing as necessary to ensure ffl's are flush at thresholds. (Definition of threshold: at doorways and/or change of floor material.)
* Install all proprietary items in accordance with manufacturers instructions. TERMITE PROTECTION
1. MINIMUM 100mm EXPOSED SLAB EDGE TO ENABLE INSPECTION and AS NOTED
* ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS 1720.1, AS 1684, AS 1684.1 AND AS 1720.2 AS APPLICABLE. 2. SLAB PENETRATIONS - TERMI-MESH
* ALL TIMBER CONNECTIONS TO BE IN ACCORDANCE WITH AS1684 U.N.O. 3. TIMBER VERANDA COLUMNS 75mm CLEARANCE TO SLAB
* ALL PTY CONNECTORS AND FIXINGS ARE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS.
* MAXIMUM UNDERSIZE FOR ALL TIMBER MEMBERS SHALL BE:
0 FOR SEASONED PINE SPECIES, OTHER SEASONED SOFTWOODS AND SEASONED HARDWOODS.
3mm FOR UNSEASONED HARDWOODS AND CYPRESS
4mm FOR OREGON
PRELIMINARY
PROJECT REV DESCRIPTION DATE
178 COOROY MOUNTAIN ROAD TITLE PAGE AND NOTES
25/09/2024 11:51:11 AM
WD1 PRELIMINARY 25/09/2024
Drawn: TD Checked: AR REV
CLIENT
STUDIO: 0490 547 760 TY JONES
SCALE
As indicated @ A3
DRAWING NUMBER
A000
WD1
LIC: 15256628
CREATED WITH GENIUS AT RATWORKS STUDIOS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.