Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance Outcomes Acceptable Outcomes Response
PO12 AO12.1
Development protects in-stream ecology by maintaining pre- Where run-off from or within the site passes through or drains to This item is not applicable as no changes to the flow regimes
development low flow discharge regimes and maintaining fish natural channels, waterways or wetlands, development protects in- are proposed
steam ecology by maintaining pre-development low flow
passages.
discharge regimes in accordance with the frequent flow
management objectives in PSP6 Engineering Design Standards -
Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges, culverts, and other
stormwater infrastructure do not cause barriers to fish passage
and facilitate the movement of terrestrial and aquatic fauna along
waterway corridors.
AO12.3
Benthic substrate retains a continuous grade with the direction
of flow consistent with the natural bed profile.
PO13 AO13.1
Development is designed and constructed to maintain surface The location and form of stormwater discharge points do not alter This item is not applicable as no changes to the flow regimes
and ground water balances that sustain the environmental values the pre-development hydrology of receiving surface water or are proposed
of water dependent ecosystems, including downstream aquatic, groundwater.
riparian, wetland and terrestrial ecosystems.
AO13.2
Developments located on groundwater recharge or discharge
areas are designed and managed in accordance with a
groundwater recharge and discharge management plan prepared
by a suitably experienced and qualified groundwater hydrologist.
The groundwater recharge or discharge must demonstrate that
the development does not affect groundwater balances beyond
the property boundaries.
Editor's Note— PSP6 Engineering Design Standards - Roads,
drainage and earthworks provides guidance on prepare a
groundwater recharge and discharge plan.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.