OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Contents
1.     Introduction ............................................................................................................................................................ 1
2.     Proposed Development ....................................................................................................................................... 1
3.     Aims & Method of Investigation .......................................................................................................................2
       3.1 Fieldwork ...................................................................................................................................................................... 2
       3.2 Laboratory Testing ................................................................................................................................................... 3
4.     Site Description ......................................................................................................................................................3
       4.1 Topography................................................................................................................................................................. 4
       4.2 Geology ........................................................................................................................................................................ 7
             4.2.1    Regional Geology.................................................................................................................................... 7
             4.2.2    Subsurface Conditions .......................................................................................................................... 9
             4.2.3    Groundwater ........................................................................................................................................... 10
       4.3 Laboratory Test Results ........................................................................................................................................ 10
       4.4 Surface Drainage ..................................................................................................................................................... 11
       4.5 Vegetation ................................................................................................................................................................. 11
       4.6 Buildings & Other Structures ............................................................................................................................. 11
5.     Slope Stability Assessment ............................................................................................................................... 13
       5.1 Existing Conditions................................................................................................................................................. 13
       5.2 Slope Stability Assessment.................................................................................................................................. 14
            5.2.1     Qualitative Assessment ....................................................................................................................... 14
            5.2.2     Numerical Modelling ........................................................................................................................... 16
6.     Geotechnical Recommendations ..................................................................................................................... 18
       6.1 Site Layout and Geotechnical Constraints..................................................................................................... 18
       6.2 Earthworks ................................................................................................................................................................. 19
            6.2.1   Site Preparation and Trafficability................................................................................................... 19
            6.2.2   Filling ......................................................................................................................................................... 19
            6.2.3   Excavations & Batter Slopes ............................................................................................................. 20
       6.3 Building Foundations ............................................................................................................................................ 20
            6.3.1   Indicative Site Classification .............................................................................................................. 20
            6.3.2   Footings .................................................................................................................................................... 21
       6.4 Retaining Structures .............................................................................................................................................. 22
       6.5 Pavement Design .................................................................................................................................................... 23
       6.6 Drainage ..................................................................................................................................................................... 24
       6.7 On-Site Effluent Disposal ..................................................................................................................................... 24
7.     Limitations ............................................................................................................................................................ 24




Geotechnical Investigation & Slope Stability Assessment
9 April 2025 | 25050-001-Rev0                                                                                                                                                            iii
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.