Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
8.2.3 Bushfire Hazard Overlay Code
Table 8.2.3.3 - Criteria for assessable development
Performance outcomes Acceptable outcomes Response
Safety of people and property
PO1 AO1.1 Not applicable as the proposed driveway follows an
Development maintains the safety of people and property from the Development which will materially increase the number of existing track located through the allotment and is not
adverse impacts of bushfire. reconfiguring a lot.
people living or congregating on premises, including
reconfiguring a lot, is not located within a medium or high
bushfire hazard area.
AO1.2
Development maximises setbacks from hazardous vegetation to
achieve an acceptable risk.
Editor’s Note — PSP8 Natural Hazards provides guidance for
assessing bushfire hazard risk and preparing a bushfire hazard
management plan.
Impacts on Ecologically Important Areas
PO2 Not applicable as the proposed driveway follows an
Bushfire mitigation measures do not adversely impact on: No acceptable outcome provided existing track located through the allotment which does
not impact on biodiversity values, connectivity and
(a) biodiversity values, connectivity and ecosystem functioning; ecosystem functioning and the long-term physical integrity
and of waterways, wetlands and areas of native vegetation.
(b) the long term physical integrity of waterways, wetland and
areas of native vegetation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.