OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable Outcomes Response
PO16
Development with the potential to generate significant traffic and No acceptable outcome provided Not applicable as the proposal is for a new driveway.
parking impacts gives appropriate consideration to transport and
land use issues.
Editor’s Note—A detailed Traffic Impact Assessment Report may
be required.
PO17 AO17.1
Parking and manoeuvring areas are designed to ensure run-off is Development providing less than five car parking spaces is Not applicable as the proposal is for a new driveway.
treated to remove pollutants prior to leaving the premises. designed so that the driveway, parking and manoeuvring areas
are formed to drain to landscaped areas.
AO17.2
Development providing five or more car parking spaces is
designed to incorporate stormwater treatment methods to remove
water contaminants likely to runoff from the general operation of
the of the driveway, parking and manoeuvring areas.
Editor’s Note—Further details are provided in the Water Quality
and Drainage Code.
PO18 The proposed driveway is to be placed at the location of the
Parking areas are designed to ensure drainage without the use of No acceptable outcome provided existing access track through the allotment. No pumps or other
pumps or other electrical apparatus. electrical apparatus are required for drainage.
PO19 AO19 The proposed driveway is to be placed at the location of
Site layout and building design provides for soft landscaping to be Below ground components of buildings, including carparks, do the existing track through the allotment and allows for soft
established. not extend beyond the above ground footprint to allow for the landscaping to be established. PO19 and acceptable
provision of landscaping, particularly within building setbacks. outcome AO19 will be met.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.