Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Local amenity PO4
AO4.1
Undertaking earthworks does not adversely impact on the amenity The proposed driveway is to be placed at the location
The following control measures are implemented—
of the local area by way of dust, noise or visual amenity. of the existing driveway for the allotment and best
(a) regular water spraying of exposed areas to suppress practice construction methods for civil works will be
dust; implemented.
(b) provision of dust stabilised or sealed internal roads; PO4 and acceptable outcome AO4.1 and AO4.2 can
(c) protective covering of exposed areas that are left for be met.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.