OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance outcomes                                               Acceptable Outcomes                                                                           Response
                                                                         more than 2 weeks; and
                                                                   (d)   unless a development permit provides otherwise,
                                                                         disturbed areas are revegetated using species identified
                                                                         in Council's Planning Scheme Policy PSP2
                                                                         Landscaping.


                                                                   AO4.2
                                                                   Earthworks are undertaken only during the hours of 7:00am to
                                                                   6:00pm, Monday to Friday and 7:00am to 3:00pm on
                                                                   Saturday. No work is undertaken on Sunday or public
                                                                   holidays.
Vegetative waste
PO5                                                                AO5.1
                                                                                                                                        Clearing, chipping or mulching will be conducted
Vegetation cleared from a development site is disposed of in       Cleared vegetation is transported off-site for disposal in an
                                                                                                                                        on-site to achieve Acceptable Outcome AO5.
an environmentally responsible manner.                             approved green waste disposal facility.
                                                                                                                                        The proposal meets the requirements of PO5.
                                                                   AO5.2
                                                                   Cleared vegetation is mulched on-site and reused for
                                                                   landscaping of the finished development.

                                                                   AO5.3
                                                                   Cleared vegetation is disposed of for the purpose of firewood.

                                                                   AO5.4
                                                                   Disposal of vegetative waste by burning off is avoided.
Managing contamination risk
PO6                                                                AO6.1                                                                All fill material will be sourced from the site and the site
Materials used as fill are suitable for development and future     Fill material is solid clean earth, free of putrescible or refuse    in is not on the contaminated land register.
use of the land and filling or excavation works do not result in   material, vegetation, acid sulfate soils, building or construction   The proposal complies with the requirements of PO6
the contamination of land.                                         material or other material or contaminants.                          and acceptable outcomes AO6.1 and AO6.2.

                                                                   AO6.2
                                                                   The site is not on the contaminated land register.
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.