Performance outcomes Acceptable Outcomes
Dams
PO12 AO12.1
Not applicable as no dam construction is proposed.
Dam location and construction does not impact upon Where the site is in the Rural zone—
neighbouring properties or road reserves, in terms of— (a) the land has a slope of less than 25% (1:4);
(a) hydrology; (b) the earthworks including cut and fill batters and retaining
(b) alteration of existing overland flow paths and patterns; walls are setback a minimum of 50 metres from the
(c) landslide or failure of dam wall; and property boundary; and
(d) effluent disposal areas. (c) the size of the lot is greater than 5 hectares.
AO12.2
Where the site is in the Rural residential zone or the Rural
zone and the lot is less than 5 hectares:
(a) the land has a slope of less than 1:6;
(b) the earthworks including cut and fill batters and retaining
walls are setback a minimum of 20 metres from the
property boundary; and
(c) the dam work involves less than 500m³ of material.
AO12.3
For all other zones—
No acceptable outcome provided
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.