Skip to the record
Every meeting, every word.

Original source · versioned page text

OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance outcomes                                               Acceptable Outcomes                                                                      Response

Haulage activity and amenity
PO7
                                                                                                                                     Best practice construction methods for civil works
Haulage of material to and from a site ensures—                    No acceptable outcome provided
                                                                                                                                     will be implemented.
(a)   minimal disturbance to neighbouring properties and
                                                                                                                                     PO7 can be met.
      properties along the haulage route; and
(b)   Council’s road infrastructure including pavements is not
      adversely affected.

Extent of earthworks
PO8                                                                AO8
The layout of the development provides adequate, clearly           All earthworks, including cut and fill batters, retaining walls   The proposed development allows for adequate on-
defined and easily accessible—                                     and the like are contained within the subject site.               site parking and maneuvering, loading and
(a)   on-site vehicle parking and manoeuvring areas; and                                                                             maneuvering and all earthworks to be contained
                                                                                                                                     within the subject site.
(b)   loading and manoeuvring areas for delivery and service
                                                                                                                                     PO8 and AO8 can be met.
      vehicles.
Sloping sites PO9                                                                                                                    The proposed driveway follows an existing track
On sloping sites development follows the natural landform          AO9                                                               located through the allotment with less than 1.5m
                                                                   Cut or fill is less than 1.5 metres in depth relative to the      cut/fill depth.
wherever practical and excavation or filling is minimal.
                                                                   natural ground level.
                                                                                                                                     Performance Outcome PO9 and Acceptable
                                                                                                                                     Outcome AO9 can be met.
Infrastructure protection                                                                                                            The proposed driveway earthworks and vehicular
PO10                                                                                                                                 access does not adversely impact on the capacity,
Earthworks and vehicular access do not adversely impact on the     No acceptable outcome provided                                    operations and maintenance of existing
capacity, operations and maintenance of existing infrastructure.                                                                     infrastructure. PO10 can be met.
Environmental protection                                                                                                             The proposed driveway does not adversely impact
PO11                                                                                                                                 upon groundwater, watercourses, drainage lines
Earthworks minimise any adverse impact upon groundwater, No acceptable outcome provided                                              wetlands and native vegetation. PO11 can be met.
watercourses, drainage lines, wetlands, and native
vegetation.
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.